This legislation has been repealed.
[bl. 9(1), (2) and (6) and 11(2)]
[Heading inserted in Gazette 19 Jun 2013
p. 2342.]
$ | ||
1. |
Meter testing deposit — | |
|
(a)
where the meter size is 20 – 25 mm |
102.00 |
|
(b)
where the meter is any greater size, an amount equal to the actual cost of
testing the meter | |
2. |
Charges for fixing water supply and fire fighting connections — | |
(a)
except within a central business district as described in Schedule 3
where the connection size is — | | |
|
20 mm
|
1 139.00 |
|
25 mm
|
1 154.00 |
|
40 mm
|
1 680.00 |
|
50 mm
|
2 076.00 |
|
80 – 100 mm
|
4 020.00 |
|
150 mm
|
4 799.00 |
|
(b)
otherwise, an amount equal to the actual cost of fixing the connection | |
3. |
Charge for — | |
|
disconnection
|
719.50 |
|
reconnection
|
719.50 |
4. |
Charge for relocation of water supply connection (less than
500 mm) — | |
|
(a)
where the connection size is — | |
|
20 mm
|
430.00 |
|
25 mm
|
490.50 |
|
40 mm
|
700.00 |
|
50 mm
|
820.50 |
|
(b)
other sizes, an amount equal to the actual cost of relocation | |
[Schedule 2 inserted in Gazette
19 Jun 2013 p. 2342-3.]