Home
| Databases
| WorldLII
| Search
| Feedback
Australian Environmental and Planning Instruments |
Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.3) 2016
Greenhouse and Energy Minimum Standards Act 2012
I, Joann Wilkie, being the person occupying the position of GEMS Regulator, make this instrument under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.
Dated: 28 July 2016
JOANN WILKIE
______________________________
Joann Wilkie
GEMS Regulator
This Instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.3) 2016.
This Instrument is made under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.
This Instrument commences the day after it is registered.
In this Instrument:
Act means the Greenhouse and Energy Minimum Standards Act 2012.
Determination means the Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2012.
Exempt Model: see section5 of the Instrument.
Note: Several other words and expressions used in this instrument have the meaning given by section 5 of the Act. For example:
• GEMS
• GEMS determination
• GEMS labelling requirements
• GEMS level requirements
• model
• model identifier
• product classes
• supply
The model specified in clause 1 of the Schedule (the Exempt Model) is exempt from the requirements of the Determination as described at clause 2 of the Schedule with respect to the supplies of the exempt model specified at clause 3 of the Schedule.
The conditions at clause 4 of the Schedule are specified for the purposes of subsection 37(2) of the Act.
Note: Subsection 37(2) of the Act provides that the exemption may specify conditions to which the exemption is subject. Subsection 37(3) provides that a person must comply with a condition of an exemption to the extent that it applies to the person.
Brand
|
Model No.
|
Description of motor
|
---|---|---|
Bronzoni Motori Electtrici s.r.l.
|
R003A-999
|
9.2kW 2P 132M
|
Requirements of the Determination as follows:
GEMS level requirements (section 6)
|
The model is exempted from the energy use requirements mentioned in section
6 of the Determination.
|
This exemption only applies in relation to the supply of three phase cage induction motors with the specifications set out in clause 1 above.
The exemption is subject to the condition that the supply of the products specified in clause 1 above is restricted to the Ichthys LNG Onshore Project located at Bladin Point in Darwin.
AustLII:
Copyright Policy
|
Disclaimers
|
Privacy Policy
|
Feedback
URL: http://www.austlii.edu.au/au/other/cth/AUEPI/2016/5.html