Case Name:
|
Universal Property Group Pty Ltd v Blacktown City Council
|
Medium Neutral Citation:
|
|
Hearing Date(s):
|
Conciliation conference on 30 November and 21 December 2017, and 25
January, 2 February and 20 April 2018
|
Date of Orders:
|
20 April 2018
|
Decision Date:
|
20 April 2018
|
Jurisdiction:
|
Class 1
|
Before:
|
Brown C
|
Decision:
|
See [5] below
|
Catchwords:
|
DEVELOPMENT APPLICATION: subdivision, creation of three lots, a residue
lot, public roads and subsequent construction of 25 dwellings
in a
multi-dwelling development including site works, construction of driveways, car
parking, stormwater drainage, tree removal and
associated landscaping works
conciliation conference; agreement between the parties; orders
|
Legislation Cited:
|
|
Category:
|
Principal judgment
|
Parties:
|
Universal Property Group Pty Ltd (Applicant)
Blacktown City Council(Respondent) |
Representation:
|
Solicitors:
E Fleming, Herbert Geer (Applicant) D Creais, Bartier Perry (Respondent) |
File Number(s):
|
2017/188468
|
Publication Restriction:
|
No
|
JUDGMENT
Drawing reference
|
Title
|
Prepared by
|
Date
|
DA01, Rev 2
|
Site Analysis
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA02, Rev 2
|
Subdivision Plan
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA03, Rev 3
|
Site Plan
|
Universal Property Group Pty Ltd
|
30 November 2017
|
DA04, Rev 3
|
Ground Floor Plan
|
Universal Property Group Pty Ltd
|
30 November 2017
|
DA05, Rev 2
|
First Floor Plan
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA06, Rev 2
|
Elevations
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA07, Rev 2
|
Elevations and Sections
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA08, Rev 2
|
Shadow Analysis
|
Universal Property Group Pty Ltd
|
21 November 2017
|
DA09, Rev 2
|
Shadow Matrix
|
Universal Property Group Pty Ltd
|
21 November 2017
|
P93-C02-001, Issue P05
|
Cover Sheet
|
Arup Consulting Engineers
|
Undated
|
P93-C02-002, Issue P05
|
Locality Plan, Drawing Schedule and Legend
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-100, Issue P05
|
Bulk Earthworks Multi Dwelling Development Lots Sheet 1 of 2
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-101, Issue P05
|
Bulk Earthworks Multi Dwelling Development Lots Sheet 2 of 2
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-102, Issue P05
|
Bulk Earthworks Driveway No's 1 and 2 Longitudinal Sections and Typical
Sections 1 and 2
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-103, Issue P05
|
Bulk Earthworks Stage 1 Cut and Fill Plan
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-104, Issue P05
|
Bulk Earthworks Stage 2 Cut and Fill Plan
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-200, Issue P05
|
Index plan and section 94 Works
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-201, Issue P05
|
Roadworks and Drainage Setout Plan Sheet 1 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-202, Issue P05
|
Roadworks and Drainage Setout Plan Sheet 2 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-203, Issue P05
|
Roadworks and Drainage Setout Plan Sheet 3 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-204, Issue P05
|
Roadworks and Drainage Setout Plan Sheet 4 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-205, Issue P05
|
Proposed Jerralong Dr. Longitudinal Section and Typical Cross
Section
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-206, Issue P05
|
Future Road No. 2 Connection, Road No. 3 Longitudinal Sections and
Typical Cross Sections
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-207, Issue P05
|
Road No. 4 Longitudinal Section and Typical Cross Section
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-208, Issue P05
|
Future Road No. 4 Longitudinal Sections
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-209, Issue P05
|
Road No. 5 Longitudinal Section and Typical Cross Section
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-250, Issue P05
|
Retaining Wall No. 1 Longitudinal Section and Earthworks Excavation
Details
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-251, Issue P05
|
Retaining Wall No. 2 Longitudinal Section and Earthworks Excavation
Details
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-300, Issue P05
|
Trunk Drainage Culvert (Section 94 Works) Longitudinal Section Line No.
901
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-301, Issue P05
|
Drainage External Catchment Plan Section 94 Works
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-302, Issue P05
|
Drainage Catchment Plan
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-303, Issue P05
|
Drainage Calculation Sheet 1 of 3
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-304, Issue P05
|
Drainage Calculation Sheet 2 of 3
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-305, Issue P05
|
Drainage Calculation Sheet 3 of 3
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-306, Issue P05
|
Drainage Longitudinal Section Line No's 1, 1A, 2, 3, 4, 5, 6, 7, and
8
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-307, Issue P05
|
Drainage Longitudinal Section Line No's 9, 10, 11, 12, 13, 15, 17, 29,
32, 34, Basin Inlet & Basin Outlet
|
Arup Consulting Engineers
|
7 March 2018
|
P93-C02-308, Issue P05
|
Drainage Longitudinal Section Line No. Culvert 901
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)011, Issue P02
|
Future Drainage Plan
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)012, Issue P02
|
Future Drainage Catchment Plan
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)013, Issue P02
|
Future Drainage Calculation Sheet 1 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)014, Issue P02
|
Future Drainage Calculation Sheet 2 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)015, Issue P02
|
Future Drainage Calculation Sheet 3 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)016, Issue P02
|
Future Drainage Calculation Sheet 4 of 4
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)017, Issue P02
|
Future Drainage Longitudinal Section Line No's 1, 1-F, 1-INT, 1A, 2 and
3
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)018, Issue P02
|
Future Drainage Longitudinal Section Line No's 3-F, 4, 5, 6, 8, 8-F, 9,
9-f, 10, 11, 12, 13, 15, 16, 17, 18, 19 & 20
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)019, Issue P02
|
Future Drainage Longitudinal Section Line No's 20, 21, 22, 22, 23,
23-INT, 24, 25, 26-INT & 28-INT
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)020, Issue P02
|
Future Drainage Longitudinal Section Line No's 29, 30-INT, 31, 31-INT,
32, 33 and 34
|
Arup Consulting Engineers
|
7 March 2018
|
SK(D)021, Issue P02
|
Future Drainage Longitudinal Section Line No's 35, 36, 36-INT, 37, 38,
and Line Culvert
|
Arup Consulting Engineers
|
7 March 2018
|
249413, Rev 2
|
Temporary Water Quality Treatment and On Site Detention
|
Arup Consulting Engineers
|
8 December 2017
|
NE164
|
Validation Report on Site Contamination for Proposed Residential
Development
|
Geotesta
|
26 July 2017
|
(2) The appeal is upheld.
(3) The Applicant is to pay the Respondent's costs under section 8.15(3) of the Environmental Planning Assessment Act 1979 as agreed or assessed.
(4) Development Application No. DA-17-0062 for the subdivision to create four (4) Torrens Title lots, construction of public roads and subsequent construction of 25 dwellings in a multi-dwelling development including construction of driveways on proposed Lots 2 and 3, stormwater drainage, tree removal and associated landscaping works on 93 Hambledon Road, Schofields (legally described as Lot 1 in DP 1240158, previously described as Lot 72 in DP 28833, Part Lot 56 in DP1213802, previously Lot 85 DP28833, and Lot 17 DP1231838, is approved subject to the conditions in Annexure “A”.
............................