Universal Property Group Pty Ltd v Blacktown City Council [2018] NSWLEC 1196 (20 April 2018)

Last Updated: 30 April 2018



Land and Environment Court
New South Wales

Case Name:
Universal Property Group Pty Ltd v Blacktown City Council
Medium Neutral Citation:
Hearing Date(s):
Conciliation conference on 30 November and 21 December 2017, and 25 January, 2 February and 20 April 2018
Date of Orders:
20 April 2018
Decision Date:
20 April 2018
Jurisdiction:
Class 1
Before:
Brown C
Decision:
See [5] below
Catchwords:
DEVELOPMENT APPLICATION: subdivision, creation of three lots, a residue lot, public roads and subsequent construction of 25 dwellings in a multi-dwelling development including site works, construction of driveways, car parking, stormwater drainage, tree removal and associated landscaping works conciliation conference; agreement between the parties; orders
Legislation Cited:
Category:
Principal judgment
Parties:
Universal Property Group Pty Ltd (Applicant)
Blacktown City Council(Respondent)
Representation:
Solicitors:
E Fleming, Herbert Geer (Applicant)
D Creais, Bartier Perry (Respondent)
File Number(s):
2017/188468
Publication Restriction:
No

JUDGMENT

  1. COMMISSIONER: This is an appeal by Universal Property Group Pty Ltd against the deemed refusal by Council of Development Application No. DA-17-00632 for the proposed subdivision, creation of three lots, a residue lot, public roads and subsequent construction of 25 dwellings in a multi-dwelling development including site works, construction of driveways, car parking, stormwater drainage, tree removal and associated landscaping works on Lot 72 in DP 28833 land known as 93 Hambledon Road, Schofields.
  2. In this matter, at or after a conciliation conference, an agreement under s 34(3) of the Land and Environment Court Act 1979 (the Court Act) was reached between the parties as to the terms of a decision in the proceedings that was acceptable to the parties. As the presiding Commissioner, I was satisfied that the decision was one that the Court could have made in the proper exercise of its functions (this being the test applied by s 34(3) of the Court Act). As a consequence, s 34(3)(a) of the Act required me to “dispose of the proceedings in accordance with the decision”.
  3. The Court Act also required me to “set out in writing the terms of the decision” (s 34(3)(b)). The orders made to give effect to the agreement constitute that document.
  4. In making the orders to give effect to the agreement between the parties, I was not required to make, and have not made, any merit assessment of the issues that were originally in dispute between the parties.
  5. The final orders to give effect to the parties’ agreement under s34(3) of the Land and Environment Court Act 1979 are:
Drawing reference
Title
Prepared by
Date
DA01, Rev 2
Site Analysis
Universal Property Group Pty Ltd
21 November 2017
DA02, Rev 2
Subdivision Plan
Universal Property Group Pty Ltd
21 November 2017
DA03, Rev 3
Site Plan
Universal Property Group Pty Ltd
30 November 2017
DA04, Rev 3
Ground Floor Plan
Universal Property Group Pty Ltd
30 November 2017
DA05, Rev 2
First Floor Plan
Universal Property Group Pty Ltd
21 November 2017
DA06, Rev 2
Elevations
Universal Property Group Pty Ltd
21 November 2017
DA07, Rev 2
Elevations and Sections
Universal Property Group Pty Ltd
21 November 2017
DA08, Rev 2
Shadow Analysis
Universal Property Group Pty Ltd
21 November 2017
DA09, Rev 2
Shadow Matrix
Universal Property Group Pty Ltd
21 November 2017
P93-C02-001, Issue P05
Cover Sheet
Arup Consulting Engineers
Undated
P93-C02-002, Issue P05
Locality Plan, Drawing Schedule and Legend
Arup Consulting Engineers
7 March 2018
P93-C02-100, Issue P05
Bulk Earthworks Multi Dwelling Development Lots Sheet 1 of 2
Arup Consulting Engineers
7 March 2018
P93-C02-101, Issue P05
Bulk Earthworks Multi Dwelling Development Lots Sheet 2 of 2
Arup Consulting Engineers
7 March 2018
P93-C02-102, Issue P05
Bulk Earthworks Driveway No's 1 and 2 Longitudinal Sections and Typical Sections 1 and 2
Arup Consulting Engineers
7 March 2018
P93-C02-103, Issue P05
Bulk Earthworks Stage 1 Cut and Fill Plan
Arup Consulting Engineers
7 March 2018
P93-C02-104, Issue P05
Bulk Earthworks Stage 2 Cut and Fill Plan
Arup Consulting Engineers
7 March 2018
P93-C02-200, Issue P05
Index plan and section 94 Works
Arup Consulting Engineers
7 March 2018
P93-C02-201, Issue P05
Roadworks and Drainage Setout Plan Sheet 1 of 4
Arup Consulting Engineers
7 March 2018
P93-C02-202, Issue P05
Roadworks and Drainage Setout Plan Sheet 2 of 4
Arup Consulting Engineers
7 March 2018
P93-C02-203, Issue P05
Roadworks and Drainage Setout Plan Sheet 3 of 4
Arup Consulting Engineers
7 March 2018
P93-C02-204, Issue P05
Roadworks and Drainage Setout Plan Sheet 4 of 4
Arup Consulting Engineers
7 March 2018
P93-C02-205, Issue P05
Proposed Jerralong Dr. Longitudinal Section and Typical Cross Section
Arup Consulting Engineers
7 March 2018
P93-C02-206, Issue P05
Future Road No. 2 Connection, Road No. 3 Longitudinal Sections and Typical Cross Sections
Arup Consulting Engineers
7 March 2018
P93-C02-207, Issue P05
Road No. 4 Longitudinal Section and Typical Cross Section
Arup Consulting Engineers
7 March 2018
P93-C02-208, Issue P05
Future Road No. 4 Longitudinal Sections
Arup Consulting Engineers
7 March 2018
P93-C02-209, Issue P05
Road No. 5 Longitudinal Section and Typical Cross Section
Arup Consulting Engineers
7 March 2018
P93-C02-250, Issue P05
Retaining Wall No. 1 Longitudinal Section and Earthworks Excavation Details
Arup Consulting Engineers
7 March 2018
P93-C02-251, Issue P05
Retaining Wall No. 2 Longitudinal Section and Earthworks Excavation Details
Arup Consulting Engineers
7 March 2018
P93-C02-300, Issue P05
Trunk Drainage Culvert (Section 94 Works) Longitudinal Section Line No. 901
Arup Consulting Engineers
7 March 2018
P93-C02-301, Issue P05
Drainage External Catchment Plan Section 94 Works
Arup Consulting Engineers
7 March 2018
P93-C02-302, Issue P05
Drainage Catchment Plan
Arup Consulting Engineers
7 March 2018
P93-C02-303, Issue P05
Drainage Calculation Sheet 1 of 3
Arup Consulting Engineers
7 March 2018
P93-C02-304, Issue P05
Drainage Calculation Sheet 2 of 3
Arup Consulting Engineers
7 March 2018
P93-C02-305, Issue P05
Drainage Calculation Sheet 3 of 3
Arup Consulting Engineers
7 March 2018
P93-C02-306, Issue P05
Drainage Longitudinal Section Line No's 1, 1A, 2, 3, 4, 5, 6, 7, and 8
Arup Consulting Engineers
7 March 2018
P93-C02-307, Issue P05
Drainage Longitudinal Section Line No's 9, 10, 11, 12, 13, 15, 17, 29, 32, 34, Basin Inlet & Basin Outlet
Arup Consulting Engineers
7 March 2018
P93-C02-308, Issue P05
Drainage Longitudinal Section Line No. Culvert 901
Arup Consulting Engineers
7 March 2018
SK(D)011, Issue P02
Future Drainage Plan
Arup Consulting Engineers
7 March 2018
SK(D)012, Issue P02
Future Drainage Catchment Plan
Arup Consulting Engineers
7 March 2018
SK(D)013, Issue P02
Future Drainage Calculation Sheet 1 of 4
Arup Consulting Engineers
7 March 2018
SK(D)014, Issue P02
Future Drainage Calculation Sheet 2 of 4
Arup Consulting Engineers
7 March 2018
SK(D)015, Issue P02
Future Drainage Calculation Sheet 3 of 4
Arup Consulting Engineers
7 March 2018
SK(D)016, Issue P02
Future Drainage Calculation Sheet 4 of 4
Arup Consulting Engineers
7 March 2018
SK(D)017, Issue P02
Future Drainage Longitudinal Section Line No's 1, 1-F, 1-INT, 1A, 2 and 3
Arup Consulting Engineers
7 March 2018
SK(D)018, Issue P02
Future Drainage Longitudinal Section Line No's 3-F, 4, 5, 6, 8, 8-F, 9, 9-f, 10, 11, 12, 13, 15, 16, 17, 18, 19 & 20
Arup Consulting Engineers
7 March 2018
SK(D)019, Issue P02
Future Drainage Longitudinal Section Line No's 20, 21, 22, 22, 23, 23-INT, 24, 25, 26-INT & 28-INT
Arup Consulting Engineers
7 March 2018
SK(D)020, Issue P02
Future Drainage Longitudinal Section Line No's 29, 30-INT, 31, 31-INT, 32, 33 and 34
Arup Consulting Engineers
7 March 2018
SK(D)021, Issue P02
Future Drainage Longitudinal Section Line No's 35, 36, 36-INT, 37, 38, and Line Culvert
Arup Consulting Engineers
7 March 2018
249413, Rev 2
Temporary Water Quality Treatment and On Site Detention
Arup Consulting Engineers
8 December 2017
NE164
Validation Report on Site Contamination for Proposed Residential Development
Geotesta
26 July 2017
(2) The appeal is upheld.
(3) The Applicant is to pay the Respondent's costs under section 8.15(3) of the Environmental Planning Assessment Act 1979 as agreed or assessed.
(4) Development Application No. DA-17-0062 for the subdivision to create four (4) Torrens Title lots, construction of public roads and subsequent construction of 25 dwellings in a multi-dwelling development including construction of driveways on proposed Lots 2 and 3, stormwater drainage, tree removal and associated landscaping works on 93 Hambledon Road, Schofields (legally described as Lot 1 in DP 1240158, previously described as Lot 72 in DP 28833, Part Lot 56 in DP1213802, previously Lot 85 DP28833, and Lot 17 DP1231838, is approved subject to the conditions in Annexure “A”.

............................

Graham Brown

Commissioner of the Court

Annexure A (213 KB, pdf)