Home
| Databases
| WorldLII
| Search
| Feedback
Court of Appeal of New Zealand |
Last Updated: 2 February 2018
For a Court ready (fee required) version please follow this link
IN THE COURT OF APPEAL OF NEW ZEALAND
CA528/2015 [2017] NZCA 68
BETWEEN
|
INVERCARGILL CITY COUNCIL
Appellant
|
AND
|
SOUTHLAND INDOOR LEISURE CENTRE CHARITABLE TRUST Respondent
|
Hearing:
|
10 and 11 August 2016
|
Court:
|
Harrison, Miller and Cooper JJ
|
Counsel:
|
D J Heaney QC and K B Dillon for Appellant
M G Ring QC, C J Jamieson and D R Weatherley for
Respondent
|
Judgment:
|
21 March 2017 at 3.00 pm
|
JUDGMENT OF THE COURT
A The appeal is allowed.
B The award of damages is set aside and judgment is entered for
the
Council on the Trust’s claim.
C The cross-appeal is dismissed, with leave reserved to appeal to
this Court on the issue of GST if the Trust should succeed
on further
appeal.
D The respondent must pay the appellant costs for a complex appeal
on a band B basis with usual disbursements including disbursements
on the
cross-appeal. We certify for second counsel.
E Costs in the High Court are to be fixed there if counsel cannot
agree.
INVERCARGILL CITY COUNCIL v SOUTHLAND INDOOR LEISURE CENTRE CHARITABLE TRUST
[2017] NZCA 68 [21 March 2017]
REASONS
Miller J [ 1] Harrison and Cooper JJ [161]
REASONS OF MILLER J
TABLE OF CONTENTS
Introduction [1] Narrative [10] The stadium project [10] Remedial work needed during construction [16] Building consent for the remedial work [22] Defective remedial work went undetected [25]
A PS4 and code compliance certificate eventually issued for the remedial work [28] Poor roof performance noted but not remedied [37] Collapse attributable to defective remedial work [42] The project agreement and lease [43] The claim and defences [47] The duty of care issue [50] The rule in Spencer on Byron [53] Does the rule in Spencer on Byron apply here? [65] Did the Council owe the Trust a duty of care for the remedial work? [85] Breach of duty [100] Causation [101] Did the Trust rely on the code compliance certificate? [111] Would the recommended inspection have revealed the defects? [119] Having learned of the defects, would the Trust have attended to them? [131] Conclusions on causation [132] The Trust’s attempt to support the judgment on other grounds [134] Contributory negligence [136] The Council’s claim to an indemnity in contract [141] Betterment [146] Result [158]
Introduction
[1] Stadium Southland was erected in 1999–2000 to provide indoor sporting and recreation facilities for “all members of the Southland community”. It was a complex comprising a foyer, amenities area and squash courts, two main events courts, and five community courts. It was erected under a project agreement and
lease between the appellant, the Invercargill City Council, which owns the
land on which it stood, and the respondent, the Southland
Indoor Leisure Centre
Charitable Trust, which owned the building. The Trust, as we will call it, was
established by six community
organisations, one of them the Council, to build
and operate the stadium.
[2] During construction the long and shallow mono-pitch roof
over the community courts was seen to sag. The Trust’s
consulting
engineer, Anthony Major, had erred when designing the steel trusses that
supported the roof and, apparently with his approval,
the Trust had opted for
lighter gauge steel than his design called for. The Trust arranged for remedial
work, which was competently
designed by an independent engineer, Maurice Harris,
and approved by Mr Major.
[3] The Council insisted that the Trust seek a building consent for the
remedial work and it consented Mr Harris’s design,
requiring of the Trust
that Mr Major should certify by producer statement that the completed work met
specifications set by Mr Harris.
Those specifications included a small upward
camber for the trusses when props were removed after the remedial work was
completed.
The trusses were to exhibit at their mid-points a precamber, as the
measurement is known, of 85 mm.
[4] The steel fabricators did not complete the remedial work as Mr
Harris had designed it. Mr Major did not detect the defects,
because he did
not inspect their work. Nor did the Council, because it relied on Mr
Major.
[5] The Council issued a code compliance certificate for the remedial
work on
20 November 2000, before it received Mr Major’s producer statement. He supplied a producer statement on 22 January 2001, but it omitted the required measurements. The Council pursued him. On 28 November 2001 he eventually supplied measurements, not of the trusses’ precamber but of their heights from the floor. The Council did not check the height measurements. Had it done so it would have noticed that the trusses’ heights varied by as much as 139 mm. The Council did not insist on precamber measurements either. Had it done so it would have learned that some of the trusses exhibited no precamber but actually sagged.
[6] In 2006 the Trust took advice from Mr Harris about the roof,
worried about its flexibility under wind load and presciently
concerned that it
might collapse under heavy snow. He recommended an inspection that was
to include welds and precamber
measurements. The Trust did not follow his
advice.
[7] On 18 September 2010 Invercargill experienced a heavy snowstorm.
Because the remedial work was defective the roof over
the community courts
collapsed under the weight of snow. Fortunately, those inside escaped
unharmed. A new and improved
complex has been erected in its
place.
[8] The Trust claims that the Council is liable in negligence and negligent misstatement for issuing the code compliance certificate on 20 November 2000. It also says that the Council had earlier failed in the exercise of an alleged inspection function for the remedial work, but a direct claim for these failings would be time-barred. It won in the High Court before Dunningham J, recovering
$15,126,665.35, being the agreed cost of rebuilding the original
structure, less
$750,000 for betterment.1
[9] The Council appeals, saying that it owed the Trust no duty in tort
in the circumstances, the rule in Spencer on Byron notwithstanding.2
It also asserts that the lease excludes liability, and it denies causation
and alleges contributory negligence. The Trust cross-appeals,
challenging
Dunningham J’s betterment deduction and her treatment of GST.
Narrative
The stadium project
[10] The six community organisations which decided to build the stadium
were the
Invercargill Licensing Trust (which administers an alcohol monopoly in the
city), the
Council, the Southland District Council (which is the territorial local
authority for
1 Southland Indoor Leisure Centre Charitable Trust v Invercargill City Council [2015] NZHC
1983 [High Court judgment]. Dunningham J also awarded $85,862 for agreed loss of rental income and $2,035,764.31 in interest at 5 per cent per annum. The final judgment sum,
$16,998,225.66, was less a negotiated $1,000,000 contribution from Mr Major.
most of the Southland region excluding
Invercargill City), the Community Trust of Southland, the Southland Building
Society, and Sport
Southland. They chose to establish the Trust as an
incorporated charitable trust to plan, build and run the stadium, with each
organisation appointing one trustee and the appointees being permitted to elect
up to six more trustees if they thought it desirable
to redress any imbalance of
skill, knowledge, and representation of various community interests. The
trustees serve as unpaid volunteers.
[11] The chosen location was on Council-owned land at 550 Tay Street, Invercargill. The Council and the Trust entered a project agreement on 23 December
1999 under which the Council agreed to lease the land to the Trust and
contribute to the project by undertaking the ground works.
That was to be the
full extent of the Council’s financial exposure and it was capped at
$760,000. For its part, the Trust
agreed to build and run the stadium. At the
end of the lease, which had a 33-year term with one right of renewal, the
stadium would
revert to the Council without compensation for
improvements.
[12] The Trust was what I will call a commissioning owner; it
commissioned the building, contracting the architect, McCulloch
Architects Ltd, the engineer, Mr Major, and the builder, Amalgamated
Builders Ltd.
[13] Construction began in June 1999 and was substantially
completed by
25 March 2000, when the then Prime Minister opened the building. In its regulatory capacity the Council issued a series of building consents for phases of the construction. It undertook some 44 inspections during the original building work and it issued a number of code compliance certificates for parts of the work. In doing so it relied on producer statements provided by the Trust’s engineer, Mr Major. Under the Building Act 1991 (1991 Act), a producer statement was a statement supplied for an applicant for building consent to the effect that certain work had been or would be done in accordance with certain technical specifications, and a local authority might rely on it when issuing a consent or a code compliance certificate.3 More will be said
about this later.
3 Building Act 1991 [1991 Act], s 43(3) and (8).
[14] We are concerned with the stage 4 building consent, which covered
structural design. The application for consent was supported
by a PS1 from Mr
Major. A PS1 is a producer statement — design, certifying that the design
complies with applicable requirements
of the building code. A PS2 is a producer
statement — design review, a PS3 is a producer statement —
construction, and
a PS4 is a producer statement — construction
review.4
[15] The drawing at the end of the judgment illustrates the community
courts’ roof design sufficiently for my purposes.
It will be seen that
the roof had a long span and a shallow pitch. The design of the welded steel
trusses used to support the
roof across its span is also shown, as is the
planned remedial work that I now go on to discuss.
Remedial work needed during construction
[16] During construction a Council inspector noted that the steel trusses
sagged and drew the matter to the architect’s
attention. The Trust was
naturally alarmed. The Chairman at the time, Ray Harper, wrote on 24 November
1999 to the architect, who
also served as project manager, asking for written
advice about the problem and the solution, and seeking assurances from the
architect and Mr Major that the resulting structure was safe and complied
with design standards and that both had adequate
professional indemnity
cover. He also insisted that an independent structural engineer be
engaged to certify that the structure
would be sound and would comply with
acceptable design standards.
[17] Maurice Harris was appointed to review the designs. He corresponded with the architect and the Trust, which wrote to him on 7 December 1999, repeating its instructions and directing that he report to the Trust. It is evident that the Trust was concerned that the architect might share responsibility for the defects. Mr Harris met with one of the trustees, Greg Mulvey, and agreed that his report would extend to
checking any items considered critical to the integrity and safety of
the building.
4 As noted at [81] below, the term “producer statement” was defined in s 2 of the 1991 Act. The categories of producer statement that we list here have evolved as a matter of professional practice in the building industry. A description of the terms may now be found in a practice note: Institute of Professional Engineers New Zealand (IPENZ) Practice Note 1: Guidelines on Producer Statements (version 3, January 2014) at 6–8.
[18] Mr Harris issued a report dated December 1999 in which he confirmed
that Mr Major had erred when calculating loads acting
on the trusses. He
characterised the faults as design problems attributable to lack of checking,
failure to carry out sufficient
seismic analysis, insufficiently detailed design
input interconnections and member slenderness, failure to follow design codes,
and
pressure to reduce structural costs without detailed re-analysis. In the
result, the six trusses over the community courts had been
designed for
approximately half the live load. (“Live” load means the load in
use, affected by wind and other environmental
conditions.) Foundations were
satisfactory, but precast columns had been designed for the lighter
loads. Further, 6 mm
steel, a lighter gauge than designed, had been used in some
chords (the square steel beams along the top and bottom of the trusses)
as a
cost-cutting exercise by the Trust.
[19] Mr Harris proposed that the trusses should be strengthened by
propping them up, cutting them at three points and precambering
them at
prescribed levels before joining them and removing the supporting props. The
objective of precambering was that under load
the roof would assume its designed
profile. The work involved cutting each of the top trusses’ chords at
three points, lifting
them and adding spacer plates to achieve the
designed precamber, re-welding them, and welding strengthening plates
along the sides of the top and bottom chords at mid-span. Notably, the
strengthening plates were to cover the middle of
the three points where each of
the top chords had been cut and re-welded. Beams and columns also needed
strengthening, and truss
connections to concrete columns needed
modifying. Mr Major endorsed this solution.
[20] On 24 December 1999 the Council advised the architect that a building consent amendment must be sought, and it must be accompanied by a producer statement that addressed cause and remedy and included a peer reviewer’s comments. The Council warned that it might ask that an independent engineer review the consulting engineer’s report. The Council’s Manager of Building Services, Simon Tonkin, also wrote directly to Mr Major, seeking an explanation and warning that after receiving his response the Council would review how it handled his producer statements. The Council followed up by letter of 2 February 2000. Mr Major responded with a detailed explanation of how the design errors had come
about, admitting that he had made some mistakes and detailing how the
remedial work would address them.
[21] The Council sought assurances from Mr Major about his quality
control procedures, asking for a written account. He
responded on 28 February,
explaining that he handled as many as 300 projects a year and that
these projects were problem-free
almost without exception. He assured the
Council that he now intended to accept only commissions that allowed
adequate
time for design and documentation, to be more pedantic where
savings in structural content were requested, to prepare calculations
to a
standard that would allow independent checking, and to engage an
independent engineer to peer review his design philosophy
and arithmetic
for major or difficult or novel projects. The Council accepted these
assurances by letter of 2 March 2000.
Building consent for the remedial work
[22] In the meantime, on 7 January 2000 the Trust had sought a building
consent for the remedial work. Its application attached
a letter dated 4
January 2000 from Mr Harris, in which he explained how the work was to be done
and specified the precamber measurements
together with the permissible range of
movement under live load, as follows:
(a) The trusses were to be cut and set at an initial precamber
measurement of 225 mm at midspan, meaning that they should be
elevated by that
much at that point.
(b) When props were removed so that the roof was carrying its
full self-weight, the precamber should be 85 mm.
(c) Under live load in normal conditions the trusses should exhibit a net precamber of approximately 85 mm and under full live load a sag of
38mm. Future live load and snow load deflections should not exceed
123 mm and 99 mm respectively.
Mr Harris also specified that the contractor and supervising engineer should
have copies of a drawing number 97139, which had been
prepared by Mr Major, and
his letter of 4 January.5
[23] The application was accompanied by a PS1 from Mr Major, in which he
certified that the remedial work provided for in the
drawing complied with the
building code. Mr Harris supplied a PS2, which the Council treated as a peer
review, noting that he was
a registered engineer. On 14 January, the Council
issued a building consent known as amendment number 1 to stage 4 building
consent.
There is no suggestion that the Council was negligent when issuing the
consent, or that the design of the remedial work was inadequate.
[24] The consent specified that as consulting engineer Mr Major was to
confirm in writing to the Council that the precamber on
the six community court
trusses was in line with Mr Harris’s letter of 4 January 2000. Individual
trusses measurements were
to be included in the record. Mr Major was also
required to provide a producer statement construction review or PS4 for the
remedial
work. It is not clear why Mr Major was nominated, presumably by the
Trust, for this role.
Defective remedial work went undetected
[25] The remedial work was carried out between January and February 2000.
The Council did not inspect the work, relying on Mr
Major to inspect and certify
it in accordance with the consent, although it did insist on written
confirmation that the defects had
been remedied and it did carry out inspections
for stage 4 as a whole. When doing this latter work the inspectors drew the
architect’s
attention to any issues they happened to notice with the
building works.
[26] In order to issue the PS4 Mr Major would have had to inspect the work as it was being done. He did not inspect it. It seems that he accepted the steel fabricators’
assurance that the work had been done
properly.
5 It is this drawing that is attached to the judgment.
[27] The remedial work was not carried out in accordance with Mr
Harris’s advice or the conditions of consent. Notably,
cuts made in the
chords to insert packers and achieve precamber ought to have been spliced with
welds around all four sides, but
the tops were not welded at all. Strengthening
plates along the sides of the trusses ought to have covered the centre splices
but
did not, and stitch welds used to fix the strengthening plates to the chords
were inadequate. Welds to the box section and packers
had not penetrated
adequately.
A PS4 and code compliance certificate eventually issued for the remedial
work
[28] On 17 February 2000 Mr Tonkin wrote to the architect, recording his
understanding that the remedial work was complete and asking
the architect for
Mr Major’s PS4. He reminded the architect to include written confirmation
that the precamber was in line
with Mr Harris’s letter, along with
individual trusses measurements. There was no response. On 17 March Mr
Watson, the
Council building inspector, carried out a final inspection for stage
4, and the Council then issued an interim code compliance certificate,
with a
number of outstanding issues noted. The issues did not include the remedial
work, and they did not stop the Trust opening
the stadium on 25 March 2000, as
it was very anxious to do.
[29] In the meantime, the Trust pursued recovery of the cost of remedial work from the architect. The evidence includes a summary of the minutes of Trust meetings (but not the actual minutes). At a meeting on 6 March 2000, the Trust was advised that apart from some small issues still to be resolved the remedial work had been completed to a satisfactory level. The Trust was told at a meeting on 3 July
2000 that the architect and engineer had lodged insurance claims, and a
settlement was achieved some months later.
[30] The Trust did not obtain code compliance certificates from the Council in connection with the decisions just mentioned. It had requested certificates in March, but without providing Mr Major’s PS4 or following up when the Council did not respond. It again requested them in October 2000, apparently because it needed them to get a liquor licence for the premises.
[31] The Trust’s inquiry appears to have led the Council to repeat
its request for Mr Major’s PS4 and trusses measurements.
On 20 November
2000, before receiving the PS4, the Council issued a code compliance certificate
for amendment No 1. It is not now
in dispute that this certificate was issued
negligently, for the Council had no way of knowing that the work was in fact
code-compliant.
It became apparent at trial that a clerk issued it without
reference to Mr Tonkin.
[32] When checking outstanding requirements on 17 January 2001 a Council
inspector followed up the request for the PS4. On 22
January 2001 Mr Major
finally supplied a PS4, certifying that the modifications has been generally
constructed in accordance with
the drawing 97139 and associated specifications.
He also supplied a covering letter explaining how the remedial work had been
carried
out. He stated that:
Re-alignment of the Community Court trusses was done by propping Truss No 1
at mid-span and quarter points, cutting the top
chord at the prop
locations, and jacking at mid-span to achieve the maximum precamber consistent
with avoiding any excessive
strain on the bolted purlin
connections. Prior to plating, and making good the top chord, the quarter
point props were
adjusted to achieve an acceptably uniform truss profile. Once
the truss had been fully welded and un-propped, the alignment was checked
by
viewing from the south boundary to confirm that the result was visually
acceptable. The remaining trusses were similarly adjusted
in sequence with the
overall appearance of the roof from the south being the criterion for
acceptability. The only measurements made
were those required to check that the
induced initial precamber was in each truss was the same as for Truss No
1.
It will be seen that Mr Major did not specify that the precamber
for the six community court trusses was in line with
Mr Harris’s letter
of 4 January 2000. Instead, he said that measurements were taken to
ensure the induced initial
precamber was the same as for truss 1, with a
visual check to ensure that the result was acceptable once the trusses were
welded
and the props removed.
[33] The Council noted the omission. By letter of 30 January, Mr Tonkin reminded Mr Major that he was to confirm that the precamber was in line with Mr Harris’s letter, and that individual truss measurements were to be included in the records. Mr Major was asked to resubmit his PS4. He did not. The Council followed up in September and a meeting was held with Mr Major, at which it was
agreed that he would follow up with the structural steel company for datum heights for the trusses. On 23 July 2001 Mr Tonkin wrote asking for the “datum heights of the community court trusses”, and this request was repeated on 12 September. The Judge found that it seemed the very precise requirements of Mr Harris’s letter of
4 January 2000 had evolved into a mere request for trusses heights as
“a benchmark against which future deflections could be
checked”.6
[34] Mr Major eventually complied with this request. On 28
November the Council received a plan showing measured floor
to trusses heights.
The Council appears to have filed this plan without examining it. The plan
disclosed what the Judge described
as considerable variation (as much as 139
mm) in the finished heights.7
[35] In the result, Mr Major never supplied any precamber measurements. It is common ground that the actual precamber did not comply with Mr Harris’s design. For example, truss two had a sag of 54 mm rather than the upward precamber of
85 mm that it ought to have exhibited under normal live load conditions.
Only truss one came close to meeting the required precamber.
[36] On 9 April 2003 a code compliance certificate was issued for the
entirety of stage 4, on the basis that all outstanding items
affecting
structural design had been resolved.
Poor roof performance noted but not remedied
[37] The stadium roof leaked persistently, and it also moved extensively — up to six inches — under wind loads. The Southland District Council’s representative on the Trust volunteered the time of one of its engineers, Graham Jones, to assess the leaks. It was thought that movement in the roof might be a cause of the leaks. Following publicity about a stadium collapse in Poland, the Trust also became concerned whether the roof could withstand snowfall. At a meeting of the Stadium’s management board on 28 March 2006 the manager reported that advice was being
sought from Mr Harris, who had peer-reviewed the original design. It
was resolved
6 High Court judgment, above n 1, at [55].
7 At [56].
that due to “ongoing issues concerning the roof”, management
should order that the stadium be vacated if at any time they
had safety
concerns. At about the same time, the Trust received a report from Mr Jones, in
which he expressed concern about the
roof’s flexibility. Mr Jones is
reported as having said that while “the structure does meet all the
building code requirements”
there remained a problem to be corrected,
which might involve steps to strengthen the trusses. The trustees resolved to
refer the
matter back to the architects in the expectation that “they
would go back to their original consulting engineer and obtain
recommendations
on what would need to be done in order to reduce the level of flexibility in the
roof structure that would lead towards
solving the leakage
problem”.
[38] Acton Smith, the then deputy chairman of the Trust, then wrote to Mr
Harris himself on 12 April 2006, as follows:
Ray Harper and I have been working on the Stadium Southland extension and we
are becoming increasingly concerned with the movement
that is occurring in the
roofline on the spans over the community courts.
Following the collapse of roofs in Eastern Europe in this last year where a
lot of people were killed and injured, we are concerned
that a major snowfall,
which Southland has not experienced for 12 years, is due. Having become aware
that the roof is moving up
to six inches under considerable wind loads, we have
asked ourselves what the effect would be of a heavy snowfall that did not melt
and its weight on the building.
Currently Tony Major is looking at how he can prevent the uplift occurring.
Ray and I are more concerned with the loading on the roof
through snow and the
prevention of any accidents to people using the facilities. Would you give
your assessment of the roof your
attention, for we want to be certain that the
building is totally safe?
[39] Mr Harris responded on 9 June 2006, confirming by reference to his
design that the strength of the trusses over the community
courts was adequate
to support the design loads specified in the relevant codes, but advising that
the Trust should investigate what
was happening. After confirming that his
design calculations were correct, Mr Harris said that:
The strengthened trusses were precambered to ensure that the truss deflections due to the self weight of the roof did not result in any visible sag. This needs to be checked.
[40] He noted that the reported wind deflection of 106 mm (this appears
to be an error; the Trust had reported deflections of
six inches or
approximately 150 mm) was higher than recommended and could contribute to
potential maintenance issues. He recommended
that the Trust should investigate
the following items:
1. Confirm where roof leaks are occurring or have occurred in the
past and review roof fastening details particularly if the
end bays are causing
the problem;
2. Confirming that the roof light glazing has been installed
with adequate clearance to the aluminium mullions;
3. Check that the community court roof trusses have an upward camber
at mid-span when carrying the roof self weight only;
4. That a visual inspection of the trust welds and support fixings is
carried out by a suitably qualified person to determine
if there are any signs
of deterioration or fatigue;
5. That suitable ties or props are installed at mid-span of the
trusses only if the roof movement is causing a problem with
patrons and it is
confirmed that maintenance issues are indeed caused by the roof
deflection;
6. That thermal effect on the roofing is checked to ensure these are
not contributing to the maintenance issues.
Finally, Mr Harris offered to review any further work thought necessary after
each of these recommendations had been investigated.
[41] The Trust did not act on these recommendations. The
contemporaneous evidence indicates that Mr Harris’s recommendations
3 and
4 were ignored. The minutes of a trustees’ meeting of 2 August 2006
refer to a need to address water ingress but
state that Mr Harris had
said flexibility in the roof structure was acceptable and make no
reference to his recommendations.
The Trust’s stance now is that it had no
need to act, for Mr Harris had assured it that the roof was safe so long as it
had
been built according to his design and the Council and Mr Major had both
certified the work.
Collapse attributable to defective remedial work
[42] It is not now in dispute that the collapse on 18 September 2010 commenced with the failure of truss one at the mid-span of the top chord, triggering a collapse
sequence on trusses one to five. Although it was far from the only flaw in
the remedial work, the evidence is that but for the missing
weld atop the
mid-span of truss one the roof would have withstood the snow load.
The project agreement and lease
[43] The agreement, which was executed on 23 December 1999, recited that
the Trust wished to “erect, construct, build”
a leisure centre on
Council land, and the Council had agreed to support the project by completing
certain ground works and granting
the Trust a lease in the form attached,
subject to the Trust satisfying it that the Trust was able to complete the
“project
and arrangements” in Schedule 3. Schedule 3 stated that the
Trust was “able to erect and build” an indoor leisure
centre in
accordance with plans and specifications provided in a resource management
consent. The Trust also agreed to accommodate
specified sports, namely
softball, tennis, netball and soccer.
[44] The Trust and Council undertook to carry out the works respectively
assigned to them under the agreement. The Trust declared
that it was
“fully able” to complete the works, and it agreed to comply with all
statutes, regulations and bylaws affecting
the land and “in carrying out
works in ... Schedule 3 made or imposed on it by any authority.” The Trust
indemnified
the Council against any damage or injury resulting from the Trust
building the stadium.
[45] The memorandum of lease attached to the project agreement
had been executed on 7 July 1999. It contained an indemnity
in similar terms
at cl 23:
The Lessee [Trust] shall indemnify and keep indemnified the Lessor [Council] from and against all actions, suits, claims, demands, proceedings, losses, damages, compensation, costs, charges and expenses whatsoever which may arise during construction, erection or operation of any authorised building or works or activity (clause 4), including permitted alterations, maintenance and additions and including but not limited to accidents or injuries of whatsoever nature or kind and howsoever sustained or occasioned (and whether resulting in the destruction of any property or not) escape of fire, leakage of water, inflammable liquid or other liquid AND notwithstanding that any such actions, suits, claims, demands, proceedings, losses, damages, compensation, sums of money, costs, charges and expenses shall have resulted from any act or thing which the Lessee may be authorised or obliged to do under these presents and notwithstanding that any time waiver or other indulgence has been given to the Lessee in respect of any
obligation of the Lessee under this Lease PROVIDED ALWAYS AND IT IS HEREBY
EXPRESSLY AGREED AND DECLARED that the obligations of the
Lessee under this
clause shall continue after the expiration or other determination of this
Lease in respect of any act,
deed, matter or thing happening before such
expiration or determination.
The evidence is that the Council was already making a significant
contribution by way of land and improvements and did not want to
incur any
additional liabilities for the construction.
[46] The land was a designated reserve which could be used only for
limited purposes. For that reason the lease was limited
to 33 years with one
right of renewal and specified that the Trust could not acquire the fee simple.
It further provided that the
Trust was to insure the property and the Council
could decide whether destroyed or damaged buildings would be reinstated, that
the
Trust was to take out public liability insurance for itself and the Council
and, as noted earlier, that the property reverted to
the Council on termination
with no compensation for improvements.
The claim and defences
[47] The Trust sued the Council in negligence and in negligent
misstatement. It pleaded that the Council owed it a duty of care
when issuing
building consents, when inspecting the works, when ensuring compliance with the
consents and building code, and when
issuing code compliance certificates. The
misstatement claim rested on the code compliance certificate of 20 November
2000, alleging
that the Council owed a duty to exercise reasonable care and
skill when issuing it.8 The Trust was said in both causes of
action to have relied on the Council, which acted negligently, and to have
suffered loss as a
result.
[48] The Council’s defence put the Trust to proof and denied, among other things,
that it owed a duty of care and that the Trust relied on the Council. It
advanced other defences, some of which do not now concern
us. Several are of
moment, however:
8 Neither the claim nor the defence invoked the later certificate of 9 April 2003, though steps taken by the Council before issuing that certificate assumed significance in the causation inquiry, as explained at [119]–[130] below.
(a) It pleaded limitation. It is common ground that limitation applied to all of the Council’s actions before the issue of the code compliance certificate on 20 November 2000. The claim was filed on
19 November 2010, just within the statutory long-stop limitation
period of 10 years.
(b) It sought a declaration that because it had indemnified the Council
the Trust could not recover its losses, relying on cl
23 of the lease. It did
not invoke cl 3.3 of the project agreement.
(c) It denied causation and pleaded contributory negligence, saying
that
the Trust’s failure to follow Mr Harris’ recommendations of 9
June
2006 caused its loss, because the inspection he recommended would have
identified the welding defects.
(d) Finally, it pleaded betterment. At trial it quantified this sum
at
$1,542,002.
[49] Mr Major was also sued. He agreed to contribute $1 million and took
no part in the trial. He has been struck off the roll
of professional
engineers.
The duty of care issue
[50] In the High Court the Council argued that Spencer on Byron
could be distinguished on its facts because the Trust was effectively a
developer; it controlled the project, relying on its own
experts and
supervising the project itself.9
[51] Dunningham J concluded shortly that the Council owed the Trust a duty of care, reasoning that Spencer on Byron had recognised a duty for all buildings subject to the 1991 Act’s regulatory regime, regardless of their type.10 Characteristics of the Trust as owner, such as its control over the construction process and relative lack of
vulnerability, were irrelevant, as was the absence of any fee to the
Council for
9 High Court judgment, above n 1, at [83].
10 At [96].
inspecting and certifying the work.11 The Judge noted that the
trustees were volunteers reliant on grants and donations to fund the project,
which placed them in a more
vulnerable position than commercial building
owners.12
[52] Counsel addressed the Spencer on Byron duty in written
submissions, but shortly before the hearing Mr Heaney filed a memorandum
accepting that we were bound to apply it
and reserving his challenge for further
appeal. He sought instead to have us distinguish Spencer on Byron. We
asked counsel to argue the duty, however, taking the view that we had to examine
the duty in order to respond to the invitation
to distinguish it. The duty
question was argued accordingly.
The rule in Spencer on Byron
[53] Actions are normally brought in negligence and in negligent
misstatement, but the latter usually brings no additional
relief because
the local authority’s negligent inspections are actionable in
negligence,13 which does not require proof either that the Council
knew its work would likely be relied on without independent inquiry or that the
plaintiff actually relied on it.14 The authorities accordingly
focus on negligence without distinguishing the negligent misstatement cause of
action.
[54] The leading authorities are the Supreme Court judgments in Sunset Terraces and Spencer on Byron, which must be read together. In Sunset Terraces the Court affirmed and restated local authorities’ duty of care to homeowners, both original and subsequent, for negligent consenting and inspection.15 The plaintiffs owned apartments in two residential apartment blocks. They had not commissioned
construction, although some had purchased from the developer. The Court
rejected
11 At [97].
12 At [98].
13 Spencer on Byron, above n 2, at [220] per McGrath and Chambers JJ.
14 Both of which are requirements in a misstatement claim: Carter Holt Harvey Ltd v Minister of Education [2016] NZSC 95, [2017] 1 NZLR 78 at [80]–[85]; North Shore City Council v Attorney-General [The Grange] [2012] NZSC 49, [2012] 3 NZLR 341 at [189]; and Caparo Industries plc v Dickman [1990] UKHL 2; [1990] 2 AC 605 (HL) at 638.
15 North Shore City Council v Body Corporate 188529 [2010] NZSC 158, [2011] 2 NZLR 289 [Sunset Terraces].
the Council’s argument that the longstanding Hamlin duty should
be abandoned in light of changed circumstances or confined to traditional
stand-alone dwellings.16
[55] In Spencer on Byron the Court extended the duty of care to
all premises regardless of nature.17 The plaintiffs owned hotel
rooms or apartments in a 23-storey building. The narrow question was whether
the duty of care ought to
be applied to premises containing a mixture of hotel
and residential apartments.18 The Council’s alleged
negligence was said to engage consenting, inspecting and certifying
functions.
[56] The two judgments focused on building type because the defendant
wanted to limit liability on that ground, among others,
but the duty that
emerges from these judgments is owed to owners. The plaintiffs in both cases
were owners (including bodies corporate),
and their economic loss was the cost
of repairing the defects. In Sunset Terraces the principal judgment
stated that a non-owner occupant can only be protected through a duty to the
owner, who suffered the loss and
can undertake the remedial
action.19
[57] The Court in Spencer on Byron obliquely addressed the position of owners who commission construction, when addressing the Council’s argument that to impose a duty of care was tantamount to a contractual warranty for which owners need not pay.20 McGrath and Chambers JJ reasoned that New Zealand law has never drawn a distinction between first and subsequent owners.21 They had in mind the opportunity that an owner who commissions construction has to contract with the inspecting authority for a fee.22 The Court was not required to address the rights, as
against a local authority, of an owner or contractor whose own
carelessness was the
17 Spencer on Byron, above n 2, at [215]–[216] per McGrath and Chambers JJ. Elias CJ and
Tipping J agreed at [22] and [26] respectively.
18 At [63] and [67].
19 Sunset Terraces, above n 15, at [53]. See also Spencer on Byron, above n 2, at [187].
20 Spencer on Byron, above n 2, at [188]–[190].
22 Spencer on Byron, above n 2, at [191]. Tipping J also referred at [27] to the commissioning
owner’s payment of a fee to the Council, finding that it confirmed proximity.
direct cause of the loss. It did not examine authorities in which courts
have excluded liability to such persons.23
[58] The majority in Spencer on Byron readily found that a local
authority is in a proximate relationship to a building owner.24
Policy considerations were neutral or favoured a duty.25
In particular, the duty is not generally inconsistent with
contractual obligations, essentially because the building code
establishes a
baseline; no one can contract to erect a building that is not
code-compliant.26
[59] For the majority, the duty rests primarily on the Council’s
statutory control of
construction processes and building standards.27 Tipping J
explained that:28
It would be highly anomalous if proximity were held to exist in residential
cases but not in those involving non-residential buildings.
In each case the
council controls the building process to ensure that it conforms with the
building code. In each case the person
involved pays a fee to the council for
the inspection and other work it does under the relevant legislation. In each
case it is
eminently foreseeable that carelessness on the part of the council
may cause loss to both the present owner and to subsequent owners.
And although
the cause of action is in tort, the relationship between the parties in each
case is close to a contractual one.
[60] William Young J, dissenting, accepted that local authorities exercise control, but he saw that as a facet of foreseeability rather than the determinant of a duty, noting that in other settings regulatory control is not usually enough to sustain a duty
to prevent foreseeable
loss.29
23 Three Meade Street Ltd v Rotorua District Council [2005] 1 NZLR 504 (HC) at [39]–[57]; Brichris Holdings Ltd v Auckland Council [2012] NZHC 2089 at [33]–[36] and [42]–[43]; and J W Harris & Son Ltd v Demolition & Roading Contractors (NZ) Ltd [1979] 2 NZLR 166 (SC) at 177–178. Compare Ingles v Tutkaluk Construction Ltd [2000] 1 SCR 298 at [39], in which it was held the negligence of an owner-builder does not absolve a council of its duties in respect of its powers of inspection.
24 Spencer on Byron, above n 2, at [10] per Elias CJ, [27]–[28] per Tipping J and [185] per
McGrath and Chambers JJ.
25 William Young J, dissenting, doubted whether the authorities established proximity and preferred to focus on the policy considerations: at [292].
26 At [39] per Tipping J and [193]–[194] per McGrath and Chambers JJ.
27 At [34]–[38] per Tipping J, and at [97] per McGrath and Chambers JJ.
28 At [27]. McGrath and Chambers JJ referred at [185] generally to Sunset Terraces, above n 15, in which control was emphasised in the principal judgment delivered by Tipping J at [32] and [50].
29 Spencer on Byron, above n 2, at [247].
[61] Reliance was discounted as a determinant of the duty, the Court
finding general reliance on the state of the law sufficient.30 The
term “general reliance” is something of a misnomer, because the
Court’s real point was that community expectations
have reached the point
where, as McGrath and Chambers JJ put it, “[a] plaintiff does not have to
prove reliance as an element
in the tort” and so need not show, for
example, that the local authority’s records were checked before
the
property purchase.31
[62] It is important to emphasise at this point that the Court analysed
the case in negligence, finding it unnecessary to distinguish
the claim in
negligent misstatement. It recognised that in negligent misstatement the
plaintiff must prove reliance-in-fact, which
was termed “specific”
or “actual” reliance.32 For example, Tipping J held
that “in misstatement cases reliance is necessary before there can be
causation. That is not necessarily
so in other cases of negligence such as the
present.”33
[63] The Court also discounted vulnerability. Tipping J characterised
the concept as problematic,34 and McGrath and Chambers JJ considered
it an unreliable foundation for policy.35 They treated
vulnerability as a characteristic of the individual, pointing out that some
home owners may be sophisticated and
wealthy, while some commercial building
owners may not. They held that vulnerability should not be introduced into New
Zealand
law.36
[64] The local authority’s duty has long rested on a corrective justice rationale,37 and that was affirmed in Spencer on Byron, Tipping J stating that the cost of liability for councils should incentivise them to take care.38 The Court also relied on a
distributive justice rationale, reasoning that losses are
appropriately borne by
30 At [35] and [38] per Tipping J, and at [199]–[201] per Chambers and McGrath JJ. See also
Sunset Terraces, above n 15, at [48] and [50] per Tipping J.
31 Spencer on Byron, above n 2, at [201] and [220].
32 These terms were used by McGrath and Chambers JJ at [199] and [220].
33 At [34].
34 At [38].
35 At [197]–[198].
36 At [156].
37 Invercargill City Council v Hamlin, above n 16, at 524–525 and 527.
38 Spencer on Byron, above n 2, at [50] and [105].
ratepayers because the whole community benefits if buildings are made safe
and healthy.39
Does the rule in Spencer on Byron apply here?
[65] We are asked to distinguish Spencer on Byron and disapply the
rule that a local authority owes a duty of care to a commercial building
owner.
[66] By way of introduction, I observe that Spencer on
Byron, like Sunset Terraces, was decided on a strike-out
application, so the facts were assumed, not found.40 As a
result, the facts recorded were quite limited and abstract. For example,
the Supreme Court did not describe the network
of contracts under which the
building was constructed and the apartments sold to the plaintiffs. This
matters because, of course,
the doctrine of stare decisis holds that an inferior
court called upon to distinguish a precedent must decide, by reference to the
facts before it, what were the precedent’s salient facts and whether they
differ materially.
[67] Also by way of introduction, Spencer on Byron states a rule, meaning that the Court made an ex ante decision about what consequences will follow once certain facts are found. It is a characteristic of rules that the facts necessary to trigger them may be limited deliberately, the rule-maker reasoning that predictability and efficiency justify excluding other facts that might be thought relevant in any given case. This rationale was undoubtedly at work in Sunset Terraces and Spencer on Byron; it was one of the principal reasons for refusing to limit the duty by reference
to considerations such as building type, size, configuration or value,
or
ownership
39 At [52] and [203]. See Invercargill City Council v Hamlin, above n 16, at 525; and Stieller v
Porirua City Council [1986] 1 NZLR 84 (CA) at 94.
40 Summary judgment had also been entered for the Council in this Court’s judgment under appeal in Spencer on Byron, above n 2: North Shore City Council v Body Corporate 207624 [2011] NZCA 164, [2011] 2 NZLR 744.
type or structure.41 It rests on an assumption, empirical in
nature, that the rule is generally accurate; put another way, that in operation
it is not
likely to produce many, or egregious, departures from what courts
seised of the facts of later cases would do. As I see it, fidelity
to the rule
accordingly requires that an inferior court should employ a materiality
threshold when deciding whether to distinguish
Spencer on Byron on the
facts.
[68] The facts that the Supreme Court found necessary to trigger the rule
are few and plain; the plaintiff must be a building
owner and the defendant
local authority must have performed a statutory function in connection with the
building’s construction.
As I explain below, under the 1991 Act the
applicable functions were consenting and certifying.
[69] The first potential point of distinction, for purposes of this case, is that the Supreme Court was not dealing in either Sunset Terraces or Spencer on Byron with plaintiffs who were commissioning owners. It is clear that a local authority cannot defend a subsequent owner’s claim by arguing that the commissioning owner could have secured protection, for itself and subsequent owners, in its contracts with professional advisers and other third parties; rather, courts require them to bear an appropriate share of the liability.42 Contrary to Mr Ring’s submission, the Supreme Court did not hold in Sunset Terraces that professional involvement is always irrelevant; put another way, that such involvement may never qualify the local authority’s duty of care to the commissioning owner who engaged the
advisers.43
41 In Sunset Terraces, above n 15, the Court declined to limit the duty by reference to these considerations, reasoning both that there was no principled reason for doing so and (at [49]) that the “duty must be capable of reasonably clear and consistent administration”. In that case, the intended use of the building was described at [54] as a “reasonably workable” test which best satisfied the “need for clarity of application”. In Spencer on Byron, above n 2, the same difficulty in drawing workable distinctions arose; the narrow issue was whether the duty ought to be applied to buildings containing a mix of hotel and residential apartments. William Young J at [298]–[299] also explained that Sunset Terraces was based on reliance but for reasons of practicality liability does not depend on the level of reliance that each separate plaintiff can establish. The Court’s reluctance to adopt vulnerability, as the Court interpreted that quality, may also be attributable to reluctance to have cases turn on the personal characteristics of plaintiffs.
42 Sunset Terraces, above n 15, at [50]. The Court’s reasoning was adopted in Spencer on Byron, above n 2, at [9], [67] and [195].
43 This point was made by William Young J in his judgment in this Court in North Shore City Council v Body Corporate 188529 [Sunset Terraces] [2010] NZCA 64, [2010] 3 NZLR 486 at [150].
[70] Second, some of the judgments reason that a local authority’s
tortious liability will not clash with the contractual
liability of contractors
and advisers to the owner because no one can be party to a contract that does
not comply with the building
code. The point being made — a policy
consideration — was that conflict between contract and tort could be
discounted
because the building code sets the same minimum standard for both.
As a matter of fact, people can and sometimes do enter into particular
contracts
that do not oblige a supplier or subcontractor to achieve code
compliance,44 and this may not matter from a policy perspective so
long as responsibility for code compliance is assigned to someone in the matrix,
such as a head contractor or engineer. What matters for present purposes is
that the Court was engaging in a policy discussion,
not denying the possibility
that contract and tort may clash on the facts in particular cases. On our
facts, which are very unusual,
the Council claims that its contract with the
Trust exempts it from tortious liability for failing to police the building
code.
I deal with the Council’s claim to an indemnity from [141] below.
For present purposes, its significance is that whether or
not that claim
succeeds, the contract arguably may qualify or exclude anticipated or actual
reliance and so affect any duty of care
in negligent misstatement.
[71] Third, it will be recalled that the Trust brought its claim in
negligent misstatement and in negligence but, as noted at [48]
above, limitation
applied to the Council’s actions before 20 November 2000. Dunningham J
accordingly proceeded on the basis
— not in dispute on appeal — that
the Trust’s claim rested on the negligent issue of the code compliance
certificate
on that date and not upon any earlier acts or omissions, such as
inspections.45 (Antecedent negligence may be taken into account
when deciding whether the code compliance certificate was carelessly issued, but
that is a different point.)
[72] It follows that this is a negligent misstatement case, meaning that specific reliance must be proved. Here I follow Spencer on Byron, in which the
Supreme Court assumed that a claim on a code compliance
certificate must be
44 This possibility is discussed in the judgment of William Young J in Spencer on Byron, above n 2, at [302]–[305], instancing a subcontractor assigned to build concrete foundations to a specified design that happened to be inadequate. For examples, see Koria v Hardy [2013] NZHC 3178; and Auckland City Council v Grgicevich HC Auckland CIV-2007-404-6712, 17 December 2010.
45 High Court judgment, above n 1, at [81].
brought in negligent misstatement: McGrath and Chambers JJ discussed code
compliance certificates under the misstatement heading and
Tipping J cited the
Court’s judgment in Marlborough District Council v Altimarloch, in
which it was held that a claim may be brought in negligent misstatement upon a
Land Information Memorandum (LIM).46 The same premise is evident in
Sunset Terraces, in which a code compliance certificate was never issued
but the Court held that a local authority may be liable, independently of
the
certificate and in negligence, for inspections.47
[73] Perhaps courts might characterise a code compliance certificate as
an act rather than a statement: it is a formal step supported
by rights for
information and of inspection, it may be a prerequisite to sale and some uses,
and liability in negligence simpliciter
may introduce no risk of indeterminacy.
But we did not hear argument on this point and we lack the information needed to
assess
its wider implications. By way of illustration, an important theme
of the Supreme Court judgments in Sunset Terraces and Spencer
on Byron is that the Court was imposing on local authorities a
liability for economic loss no more extensive than that borne by other
participants, and if that principle is to be maintained their position
must be considered too.48 As just noted, Tipping J also drew a
parallel with claims on LIMs. I proceed accordingly on the basis that a claim on
a code compliance
certificate alone — that is, a claim not founded on any
antecedent inspections — must lie in negligent
misstatement.49
[74] Fourth, the Supreme Court discounted vulnerability as noted above, Tipping J describing it as problematic and unnecessary (since control justified the duty), and McGrath and Chambers JJ holding that it should not be introduced into New Zealand law. In this respect the Court departed from the approach taken in, for example, Rolls Royce New Zealand Ltd v Carter Holt Harvey Ltd (Rolls Royce) and Ministry
of Education v Econicorp Holdings Ltd, in which this Court had
treated vulnerability
46 Spencer on Byron, above n 2, at [219]–[222]; and Marlborough District Council v Altimarloch
[2012] NZSC 11, [2012] 2 NZLR 726, cited in Spencer on Byron, above n 2, at [49].
47 Sunset Terraces, above n 15, at [60]–[62].
48 Spencer on Byron, above n 2, at [302].
49 At [49] and [219].
as a dimension of proximity.50 The Supreme Court has since
cautiously qualified its view of vulnerability in Carter Holt Harvey
Ltd v Minister of Education (Carter Holt).51 The
Court there doubted whether it is realistic to expect those entering building
contracts to secure full warranties and noted that,
although the Minister of
Education is a sophisticated property owner, she could not be expected to know
of the latent defects in
issue.52 What matters for our purposes is
that in that case the Court treated vulnerability as a relevant consideration
and a question of fact
for trial. It also recognised that the contractual
matrix might preclude proximity, while not being persuaded that the point could
be decided summarily — the case was another strike-out application —
for the defendants.53 It implicitly accepted that a
“specifically designed” contractual regime, such as that in
Rolls Royce, might exclude proximity.54
[75] Following Carter Holt the New Zealand position appears now to
be that vulnerability is a relevant consideration when deciding whether a duty
was owed to
a building owner. Subsequent owners, and other owners who did not
have a practical opportunity to protect themselves in contract,
will likely be
considered vulnerable as a class.55 For those who commission
construction, vulnerability is a question of fact to be decided at trial by
reference to the contractual
matrix.
[76] As I see it, this approach is reconcilable with Spencer on Byron, in which the principal judgment recognised that duty in “grey area” cases is always a question of judicial judgment.56 Cases in which a court is dealing with a commissioning owner may turn out to exhibit features, such as a particular contractual matrix, that put them
into the marginal or “grey area”
category.
50 Rolls Royce New Zealand Ltd v Carter Holt Harvey Ltd [2004] NZCA 97; [2005] 1 NZLR 324 (CA) at [61]; and Ministry of Education v Econicorp Holdings Ltd [2011] NZCA 450, [2012] 1 NZLR 36 at [27], [44]–[45] and [91]–[96].
51 Carter Holt Harvey Ltd v Minister of Education, above n 14.
52 At [54]–[55].
53 At [26]–[28].
54 At [25].
55 Vulnerability is to be assessed in terms of a class: Carter Holt Harvey v Minister of Education, above n 14, at [54]; and Spencer on Byron, above n 2, at [197]–[198].
56 Spencer on Byron, above n 2, at [184] citing South Pacific Manufacturing Co Ltd v New Zealand Security Consultants and Investigations Ltd [1992] 2 NZLR 282 (CA) at 294 and The Grange, above n 14, at [161].
[77] I accept, of course, that we are here dealing with a local authority
and an owner, not, as in Carter Holt, the parties to a building contract.
It is less likely that a local authority can exclude the relationship of
proximity that ordinarily
flows from its exercise of statutory functions, but
vulnerability remains a relevant consideration. Notably, there may be
circumstances
in which the commissioning owner has through contract assumed
specific control of the relevant risk, choosing not to rely on the
local
authority. The Council says this is such a case. By recognising that for some
owners the duty may turn on contractual considerations,
Carter Holt may
introduce such an owner’s control-in-fact over the relevant aspect of
construction, pursuant to contracts actually entered,
as a relevant
consideration when considering whether a duty was owed to that
owner.
[78] Finally, this case involves producer statements. In both Spencer
on Byron and Sunset Terraces the local authority had handled the
permitting, inspection and certifying functions itself. William Young J did
remark upon producer
statements when making a point that local authorities might
respond to the duty of care by withdrawing some of their
services:57
Producer statements may permit a territorial authority to conclude that a building consent or code compliance certificate should be issued on a basis which does not depend on the building judgments of its own staff. In this way, practices around producer statements may enable territorial authorities to design approval systems which reduce the need for their front-line staff to engage in the sort of direct assessment exercises which carry substantial litigation risk. If this happens, it would represent the sort of partial withdrawal of services which an economist might see as a likely consequence of the imposition of liability.
(Footnotes omitted.)
[79] The Spencer on Byron duty is closely linked to the relevant legislation, the Building Acts of 1991 and 2004.58 Under s 24 of the 1991 Act, territorial authorities’ functions included approving or refusing applications for building consents, enforcing the building code and regulations, and issuing project information memoranda, code compliance certificates, and compliance schedules. As the
Supreme Court noted in Spencer on Byron, this supported the duty
of care because
57 Spencer on Byron, above n 2, at [313].
58 At [29] and [105].
territorial authorities had not previously been under a statutory obligation
to issue permits and code compliance certificates.59
[80] A local authority was obliged to issue a consent or code
compliance certificate if satisfied on reasonable grounds
that the provisions of
the building code respectively would be or had been met.60 It was
relieved of the obligation to satisfy itself of these things if provided with a
building certificate or code compliance certificate
issued by a building
certifier under ss 43 or 56 of the 1991 Act, and it could not be held liable
for anything done in good
faith in reliance on such a document.61
The idea, as the Supreme Court explained in Spencer on Byron, was
to establish a competitive market for building certification.62
To that end, the legislature sought to place building certifiers on the
same footing as territorial authorities by providing (in
s 90) that civil
proceedings against a certifier for issuing a building or code compliance
certificate were to be brought in tort
and not in contract. This was intended
to ensure that building certifiers could not contract out of their
obligations.63
[81] The 1991 Act also provided for producer statements, which were
defined as:64
... any statement supplied by or on behalf of an applicant for a building
consent or by or on behalf of a person who has been granted
a building consent
that certain work will be or has been carried out in accordance with certain
technical specifications.
A territorial authority was authorised, at its discretion, to accept a
producer statement
“establishing compliance with all or any of the provisions of the
building code”.65
Unlike a certificate issued by a building certifier, a producer statement did not relieve the authority of its obligation to satisfy itself on reasonable grounds that, for a consent, the building code would be complied with if the work was properly completed in accordance with the plans and specifications or, for a code compliance
certificate, the completed work complied with the building
code.
59 At [105].
60 1991 Act, ss 34(3) and 43(3).
61 Section 50.
62 Spencer on Byron, above n 2, at [98].
63 Section 57(2).
64 Section 2.
65 Sections 33(5) and 43(8), the latter being inserted in 1992.
[82] We were not referred to any authority in which a court has had to
decide when a local authority may rely on a producer statement
to relieve it of
the need to inspect building work before issuing a code compliance
certificate.66 If they are to mean anything, the statutory
provisions allowing a local authority to accept a producer statement
“establishing
compliance” must envisage that such statement
might afford reasonable grounds for the local authority to be satisfied that
the
code had been complied with. That gives a producer statement the status of
evidence, on which the local authority might lawfully
rely when deciding whether
the work complied. For reasons given at [135] below, it is not necessary or
appropriate in this case
to catalogue what a local authority must do
before relying on a producer statement.
[83] The cases often speak of the defendant local authority’s consenting, inspecting and certifying functions. That is so because the older cases often turned on negligent inspections following the issue of building permits. Under the 1991
Act, however, inspection was not a statutory obligation in itself; rather,
inspections might be necessary if the local authority was
to perform other
functions competently. The distinction matters in this case. A PS4 evidencing
code compliance might relieve a
local authority of the need to inspect the work
itself at appropriate junctures before issuing a code compliance
certificate.
[84] For these reasons, I am satisfied that Spencer on Byron may
be distinguished in the circumstances of this case. I turn to consider from
first principles whether a duty of care was owed
in fact.
Did the Council owe the Trust a duty of care for the remedial
work?
[85] The elements of the cause of action in negligent misstatement may be
framed in this way:67
66 Body Corporate 326421 v Auckland Council [2015] NZHC 862 suggested that it depends on the circumstances. Some cases address the liability in tort of the maker of the producer statement: Kwak v Park [2016] NZHC 530; Pacific Independent Insurance Ltd v Webber HC Auckland CIV-2009-404-4168, 24 November 2010; and Judge v Dempsey [2014] NZHC 2864.
67 Caparo Industries plc v Dickman, above n 14, at 638; The Grange, above n 14, at [189]; and
Carter Holt Harvey Ltd v Minister of Education, above n 14, at [80]–[85].
(a) Proximity: the parties must be in a relationship of proximity, or a
“special relationship”. This requires
that the adviser knew for
what purpose the advice was wanted, knew the advice would go to the plaintiff or
an ascertainable class
that included the plaintiff, and knew the advice would
likely be acted on without independent inquiry. Knowledge may be imputed,
the
court having found that the adviser ought in the circumstances to have known or
foreseen what would likely happen.68
(b) Policy: wider policy reasons must not exclude a duty of care in the
circumstances.69 For example, a court may exclude a duty for risk
of indeterminacy, or for conflict with some other duty or the public
interest.70
(c) The ultimate question: whether, having regard to (a) and (b), a
duty is fair, just and reasonable.71
(d) Specific reliance and loss: the plaintiff actually relied on the
advice and suffered loss in consequence.72
The second limb is not always isolated from the first when analysing claims — for example, the Supreme Court did not do so in Carter Holt73 — but it may be appropriate when considerations external to the parties’ relationship affect the decision. As Blanchard J explained in The Grange,74 it is also convenient when, as is usual in building cases, the claim is brought in both negligence and negligent misstatement; that was so in The Grange, where the Supreme Court did not
distinguish between the causes of action when answering the duty
question for strike-
68 Carter Holt Harvey Ltd v Minister of Education, above n 14, at [80]; The Grange, above n 14, at
[189]; and Caparo Industries plc v Dickman, above n 14, at 638.
69 Carter Holt Harvey Ltd v Minister of Education [2015] NZCA 321, (2015) 14 TCLR 106 at
[115].
70 Cherie Booth and Daniel Squires The Negligence Liability of Public Authorities (Oxford
University Press, Oxford, 2006) at [3.31], [3.39] and [3.64].
71 The Grange, above n 14, at [160].
72 Spencer on Byron, above n 2, at [34] and [199]. See also Boyd Knight v Purdue [1999] 2 NZLR
278 (CA) at [58]–[60]; and Price Waterhouse v Kwan [1999] NZCA 311; [2000] 3 NZLR 39 (CA) at [30].
73 Carter Holt Harvey Ltd v Minister of Education, above n 14, at [78]–[85].
74 The Grange, above n 14, at [156].
out purposes. I observe also that reliance arises at two points in this
framework: the defendant’s expectation of reliance
forms an element of the
duty and the plaintiff’s actual reliance affects causation. Sometimes
the two are combined, with
actual reliance being treated as part of the duty
analysis, but for reasons that will become apparent I prefer to separate them
here.75
[86] When examining the duty I focus, as Dunningham J did, on the
particular consent for the remedial work and the code compliance
certificate
that is said to have caused the Trust’s losses.76 Put another
way, the circumstances of the remedial work may be sufficiently distinctive to
exclude a duty owed for other work, such
as the foundations, that the Council
inspected and certified in the usual way.
[87] I turn to the circumstances, beginning with proximity. The
Council’s knowledge of the code compliance certificate’s
purpose and
audience is not contentious. It chose to assume a degree of responsibility,
having insisted the Trust seek consent for
the remedial work. But anticipated
reliance is in issue. The Trust’s engineer, Mr Major, was being relied
upon to supply
the evidence needed to certify the work as code-compliant.
Accordingly, the Council expected that the Trust would have the work
inspected
for code compliance by an engineer who was independent of the Council. To
that extent, this is analogous to a “reasonable
opportunity for
intermediate inspection” case.77 The Council also knew that
the Trust had been told in the conditions of consent that the Council was
relying on a PS4, so would not
inspect the work itself. However, the Council
must be taken to have known that the Trust expected it to insist on Mr Major
supplying
a PS4 confirming that the work was code-compliant and to insist on
evidence that the conditions of consent had been met.
[88] Next, the Trust was not vulnerable, as between itself and the Council. It is true that, as Dunningham J found, the trustees were volunteers and the Trust was not
in the business of building.78 However, that
is to focus exclusively on personal
75 Caparo Industries plc v Dickman, above n 14, at 638.
76 High Court judgment, above n 1, at [139].
77 Sunset Terraces, above n 15, at [76].
78 High Court judgment, above n 1, at [98].
characteristics. The correct question is a practical one: could the Trust
reasonably be expected to control its risk by contract?
As to that:
(a) The Trust was not in the business of building, but in the
project agreement it had stated that it was capable of
completing the project.
Whether or not the indemnity that it granted the Council extends to liability
for negligence in the performance
of statutory functions, the agreement confirms
that as between the parties the Trust knew it was responsible for completing the
building,
meaning that it should engage such assistance as it required to ensure
the work was done properly.
(b) The remedial work was a very specific project of narrow scope,
undertaken in circumstances where the Trust knew something
had gone wrong.
So it was realistic to expect the Trust, with the assistance of its advisers, to
identify and manage the risk that
the work might be badly designed or
executed.
(c) The Trust did identify those risks and it addressed them in
targeted contractual arrangements. Realising that its own
agents might have
been negligent, it engaged Mr Harris to design the work. Knowing what had gone
wrong, it engaged Mr Major to
certify the work in a producer statement.
Anticipating a risk of further trouble, it relied on assurances that those
concerned (including
Mr Harris) held adequate insurance cover.
[89] Next, the Trust was the commissioning owner, party to the principal
contracts with the architect and engineer and builder.
As just explained, it
used its position to assert control over the remedial work.
[90] Next, the Council relied on a PS4 tendered by Mr Major. As noted above, that does not preclude a duty. Responsibility for issuing the consent and the code compliance certificate remained with the Council. However, a producer statement supplied by the owner’s suitably qualified agent might nonetheless count against a
duty where, as in this case, it was made clear that the local authority would
not inspect the work itself but would rely on the producer
statement.
[91] The Council charged a fee of $245 for the consent, but it did not
charge for inspection or the code compliance certificate.
A fee evidences
proximity.79 Its absence for the relevant work here is consistent
with the evidence that, to the Trust’s knowledge, the Council relied on
Mr
Major to certify that the work had been done correctly.
[92] I turn to wider policy considerations. They overlap analysis of the
parties’ relationship and I will not repeat what
I have already said. No
direct conflict arises between tortious liability and the contractual allocation
of risk between the Trust
and its contractors, because the Council was not
a party to those contracts and the remedial work was intended to achieve
code compliance; the Trust did not contract for something less, or more, than
that.80 (I say “direct” because the local
authority’s duty of care may affect the contractual allocation of risk by
relieving
owners of the need to pay for appropriately intensive
supervision.81) That being so, tortious liability of the
Council to the Trust can coexist with those contracts. Nor is the standard of
care
difficult to fix on the facts, for the requirements of Mr Harris’s
design were very specific.
[93] Under the 1991 Act the commissioning owner bore a responsibility for code compliance.82 The authorities establish that this responsibility is not in itself a defence for a local authority, though it may sound in an allowance for the owner’s
contributory negligence.83 However,
efficiency is a relevant consideration, as
79 Spencer on Byron, above n 2, at [28].
80 This distinguishes Rolls Royce New Zealand Ltd v Carter Holt Harvey Ltd, above n 50; and Ministry of Education v Econicorp Holdings Ltd, above n 50, as the Court noted in the latter case at [61(b)]. Note that I deal at [141] below with the contractual relationship between the Council
and the Trust.
81 Spencer on Byron, above n 2, at [305] per William Young J.
82 This is implicit in ss 7 (all building work, as defined, to comply with the code whether or not a consent was required), 33 (owner must seek consent), 34 (authority must be satisfied on reasonable grounds that code would be met), 42 (owner could be given notice to rectify for code
compliance) and 43(1) (owner must advise the authority that building work has been completed)
of the 1991 Act. See also Spencer on Byron, above n 2, at [304], although William Young J may have had the Building Act 2004 in mind.
83 In respect of overlapping liabilities, see Spencer on Byron, above n 2, at [9]; The Grange, above n 14, at [62]; and City of Kamloops v Nielsen [1984] 2 SCR 2 at 15. In respect of the contributory negligence point, see Johnson v Auckland City Council [2013] NZCA 662 at [25]
Tipping J explained (“do it once, do it right”) in Spencer on
Byron.84 It may affect the duty in that, as between the
Council and a commissioning owner, the owner ought to be able to avoid the
risk
at least cost by imposing quality control mechanisms in its
contracts with the builders, architects and engineers whom it
must engage in any
event.85 Local authorities experience an incentive to manage
potential liability by imposing additional costs on building
owners
as a class, as William Young J pointed out.86 It is
also open to local authorities to disengage so far as the legislation allows,
opting, for example, to rely on producer statements
from professionals engaged
by the owner. That is what happened in this case, albeit because the Council
lacked the skill to evaluate
the work rather than for liability reasons. Mr
Ring’s submission that if the Council lacked the necessary skills it ought
to have engaged its own expert nicely illustrates the potential for duplication
of effort, at the expense of the applicant owner
or of applicants or ratepayers
generally.
[94] Of course, this point about efficiency applies only to a
commissioning owner. Subsequent owners — including those who
buy,
sometimes off the plans, from a developer — lack the same opportunity to
control construction quality, and for them the
alternative to local authority
liability may involve insuperable transaction costs, in the form of
investigations (of the design
and construction) and negotiations (to secure
protection, ultimately from the commissioning owner or head contractor or
designer).
These difficulties were mentioned in Spencer on
Byron.87
[95] Corrective justice considerations justify a duty of care here, but unusually, distributive justice considerations do not. Because the Southland District Council was involved, the Trust appears to be more representative of the community served by the stadium than is the appellant Council. The City’s ratepayers are not alone in
using the stadium and benefiting from code
compliance.
and [68]; and Sunset Terraces, above n 15, at [61] and [79].
84 Spencer on Byron, above n 2, at [32].
85 In respect of overlapping liabilities, see Spencer on Byron, above n 2, at [9]; The Grange, above n 14, at [62]; and City of Kamloops v Nielsen, above n 83, at 15. In respect of the contributory negligence point, see Johnson v Auckland City Council, above n 83, at [25] and [68]; and Sunset Terraces, above n 15, at [61] and [79].
86 Spencer on Byron, above n 2, at [310].
87 At [32].
[96] I turn finally to consider whether it is fair and reasonable to
impose a duty. Mr Heaney focused his argument on this ultimate
question,
conceding that on the authorities a finding of proximity is almost
inevitable.88
[97] A local authority ordinarily owes a duty of care to an owner, and,
as Mr Ring submitted, the Council insisted on a building
consent. Its
relationship to the Trust was proximate, and having regard to the discussion of
Spencer on Byron above, good reason would be needed to displace a
duty.89 I accept that by insisting on a consent, the Council
assumed an obligation to satisfy itself that Mr Harris’s design complied
with the building code, meaning that the work would be code-compliant if
completed in accordance with the plans. There is no dispute
that it complied
with that duty, reasonably relying on the producer statements provided by Mr
Harris and Mr Major.
[98] In my opinion, the Council should not be taken to have assumed a
duty to inspect the work to ensure that it complied, as
built, with the code; to
the Trust’s knowledge it relied on the Trust’s agent, Mr Major, as
the legislation allowed.
The Trust accordingly knew that the Council could not
certify of its own knowledge that the work actually complied with the building
code. Rather, the Council assumed a different and lesser responsibility, that
of checking that an appropriately qualified person
had supplied adequate
evidence that the consent conditions had been met. There is nothing unfair or
unreasonable about the imposition
of a duty to do that much. I consider that
the Council owed the Trust a duty to take care to that extent.
[99] In some cases this narrow duty formulation would excuse the local
authority on the facts. In this one, as I now go on to
explain, it does
not.
Breach of duty
[100] It is not now in dispute that the Council negligently issued the code compliance certificate of 20 November 2000. In the absence of Mr Major’s PS4 it had no way of knowing that the work complied with the conditions of consent. This
was to breach the limited duty of care that the Council owed to the
Trust for the
89 Spencer on Byron, above n 2, at [25].
remedial work. It had the consequence, as I now go on to discuss, that the
Trust lost an opportunity to investigate the work and
decide what to do
next.
Causation
[101] The Council is not primarily to blame for the collapse on 18
September 2010. That distinction belongs to Mr Major and the
contractors who
actually did the remedial work and created the defects. The
Council’s liability rests on the proposition
that but for its
negligence, the Trust would have identified and remedied deficiencies in the
work.90
[102] The Trust’s theory of causation is accordingly that the
Council’s negligent statement that the remedial work complied
with the
building code was an effective cause because it caused the Trust to not take
action to avoid the loss. Specifically, the
Trust placed both general and
specific reliance on the certificate, the certificate was false because the
remedial work was substandard,
and this want of compliance was a substantial
cause of the collapse.
[103] The Council’s theory of causation is that the Trust must prove
that had the Council refused to certify the building
without the measurements an
inspection that revealed the defects would have followed. The Trust did not
prove these things: no witness
deposed that Mr Harris (the most likely
candidate) would have inspected the work, or that such inspection would have
revealed the
critical missing weld at the mid-span of the top chord on truss
one. The Council does not say that the Trust’s failure to
have the
trusses inspected in 2006 was so egregious as to break the chain of
causation.91
[104] At trial, and before us, the Trust characterised the Council’s defence as a
claim that the loss would have happened anyway, regardless of its negligence.
It argued that a defendant who advances such a claim
must prove it, citing
Davis v
90 Ministry of Education v Econicorp Holdings Ltd, above n 50, at [38].
91 The plaintiff ’s own conduct may become the real cause of the damage: Sunset Terraces, above n 15, at [83]; Queenstown Lakes District Council v Charterhall Trustees Ltd [2009] NZCA 374, [2009] 3 NZLR 786 at [40]; and Bowen v Paramount Builders (Hamilton) Ltd [1977] 1 NZLR
394 (CA) at 412–413.
Garrett and Fletcher Construction Company Ltd v Webster.92
These cases are authority that a defendant cannot answer a claim for
damages by raising a bare possibility that the loss would have
happened
anyway.
[105] The Judge accepted this characterisation of the defence, holding
that:93
Despite my finding that it was clearly negligent to have issued the CCC in
November 2000, the Council answered this saying the negligence
was not causative
of the loss because it would not have been negligent to issue a CCC in reliance
on the information it had by 28
November 2001. That meant the collapse would
have happened anyway, in the absence of negligence.
To succeed, the Council must affirmatively show that the loss would still
have happened without any negligence on its part. The Trust’s
submission
emphasised that it was insufficient for the Council to show that the
plaintiff’s loss might still have occurred,
but that it must positively
show that despite its negligent act or omission, the loss would still have
occurred.
[106] She then went on to hold that the Council had not discharged the
onus:94
The Council has therefore failed to establish that the loss would have flowed
in any event, notwithstanding Council’s negligence.
If the Council
had required full compliance with condition 4 of the building consent, which I
am satisfied that the Council,
acting non-negligently, should have done, the
problem in all likelihood would have been picked up. In
those
circumstances, I simply do not need to go on to consider whether it would
have been negligent to rely on the PS4, as proffered,
without direct
supporting evidence of the inspections which had been carried out.
[107] I accept Mr Heaney’s submission that this was an error, albeit an understandable one because the Trust’s ingenious attempt to reverse the onus of proof confused the causation inquiry. The Council did not speculate that some other cause would have intervened to inflict the same loss. The roof collapsed from the primary cause — the welding defects — which was there all along. The Council simply denied that its own negligence was a contributing cause. As part of that defence, it denied that the Trust ever relied on the code compliance certificate. In particular, it denies that the certificate played any part in the Trust’s decision not to
inspect the trusses in 2006.
92 Davis v Garrett [1830] EngR 49; (1830) 130 ER 1456 (Comm Pleas) at 1459; and Fletcher Construction Company Ltd v Webster [1947] NZGazLawRp 150; [1948] NZLR 514 (SC) at 518–519. The Trust also referred to Atlas Properties Ltd v Kapiti Coast District Council CA30/02, 20 June 2002 at [9]; and Easton Agriculture Ltd v Manawatu-Wanganui Regional Council [2013] NZCA 79 at [121].
93 High Court judgment, above n 1, at [125]–[126] (footnote omitted).
94 At [147].
[108] Had this been a timely claim in negligence simpliciter, with no
intervening need for inspection, this latter stance would
not have availed the
Council. General reliance would have sufficed. But it is necessarily a claim
in negligent misstatement, meaning
that specific reliance must be
proved.95
[109] I record at this point that when addressing causation counsel focused on what happened in June 2006, when the Trust elected not to have the roof inspected and precamber measurements checked. The Trust did not claim before us to have done anything specific in reliance on the code compliance certificate at any earlier time. (I nonetheless review the evidence below, because it helps to explain what happened in
2006.)
[110] Having regard to the Judge’s approach, we must decide for
ourselves whether the Trust proved causation. Fortunately,
counsel examined
the evidence in some detail. I address the issues as follows: did the Trust
rely on the code compliance certificate
to decide to do nothing in response to
Mr Harris’s advice of 9 June 2006;96 would such inspection have
revealed the defects in compliance with Mr Harris’s design, in particular
the missing welds; and
the defects having been revealed, would the Trust have
remedied them?
Did the Trust rely on the code compliance certificate?
[111] I begin by examining the evidence about reliance pre-2006. The
facts are that:
(a) In 1999, on learning of the defects the Trust demanded assurances from the architect and Mr Major both that the structure was safe and that they had adequate professional indemnity cover. It then engaged Mr Harris to find out what had gone wrong, to design remedial work, and to certify that the work would be sound and would comply with
acceptable design standards.
95 Caparo Industries plc v Dickman, above n 14, at 638; The Grange, above n 14, at [189]; and
Carter Holt Harvey Ltd v Minister of Education, above n 14, at [80]–[85].
96 This being the only occasion on which the Trust argued for specific reliance.
(b) The Trust did not propose to seek a building consent. Left to its
own devices it would have pressed on with the remedial
work without involving
the Council.
(c) The Trust chose to rely on Mr Major to verify that the remedial
work had been completed as Mr Harris had designed it, and
did so knowing that
the Council would rely on Mr Major to certify the work for code compliance
purposes. The consent gave the Trust
no reason to expect that the Council would
inspect the remedial work itself.
(d) The Trust had no particular need of a code compliance certificate.
It was not a developer, building for purpose of sale.
It seems likely that not
until it needed a liquor licence did it pursue the Council for a
certificate.
(e) The Trust settled claims against the engineer and architect at
about the time the certificate was issued, but there is nothing
to suggest that
the two events were connected.
Accordingly, the evidence indicates that before 2006 the Trust did not rely
on the Council’s code compliance certificate for
assurance that the work
complied with the building code. It relied rather on its own
agents.
[112] I turn to what happened in 2006. The Judge did not find specific
reliance then. Indeed, her findings are inconsistent
with it, for she found
that Mr Harris’s advice did not clearly put the Trust on notice that it
needed to check the trusses.
She cited his recommendation that a visual
inspection be carried out for signs of deterioration or fatigue,97
and (when dealing with contributory negligence) found that the
recommendation did not warn the Trust that there might be workmanship
defects.98
[113] In my respectful opinion, the finding that the Trust was unaware of a
need to inspect the trusses closely is unsustainable.
I have recorded the
narrative in some
97 See point 4 at [40] above.
98 High Court judgment, above n 1, at [167]–[171].
detail at [10]–[42] above. It shows that the Trust worried about
structural integrity, as a result of the roof being seen to
flex disconcertingly
under wind load, that its concerns extended specifically to snow load, that Mr
Smith told Mr Harris that the
Trust worried about collapse and wanted
confirmation that the stadium was safe; and specifically, that Mr Smith wanted
reassurance
that the roof’s flexibility under wind load did not signal a
structural problem. The tenor of his letter of 12 April 2006
is one of anxiety.
And lastly, at two points in his letter Mr Harris said the precamber
measurements — the very departure from
design requirements that the Trust
relies upon to argue that the Council ought to have identified the welding
issues — should
be checked.
[114] To say this is to recognise that I must assess the evidence of
reliance for myself. Mr Ring pointed to the evidence of Mr
Smith, who deposed
that:
I should emphasise that neither I nor my fellow trustees are people who are
experts in large scale construction or engineering.
We were at all times
reliant on the advice we received from the contractors and advisers we
engaged. When we received the
appropriate assurances and certificates from
those experts and from the Council, we relied on them as establishing that the
building
had been properly constructed. That was especially so because of the
scrutiny that I knew had been brought to bear on the original
design mistakes.
Accordingly, when the stadium opened, I believed that the stadium was sound,
safe, and compliant with all the relevant
standards.
[115] There is no reason to doubt Mr Smith’s credibility and
reliability, but this passage is notable for what he did not
say; he did not say
that because of the code compliance certificate the Trust decided not to inspect
the trusses in June 2006. This
is not evidence of specific
reliance.
[116] In my opinion, the Trust did not rely on the code compliance
certificate in
2006. Rather, the Trust and the stadium’s management were alarmed at the behaviour of the roof under wind load and decided that investigation and remedial action were warranted despite code compliance. As I have noted at [37] above, the minuted advice from the District Council engineer, Mr Jones, was that the roof was too flexible and needed attention. Code compliance seems to have been relied upon only to assure the management board that the stadium could continue to operate in the meantime. Mr Smith’s letter to Mr Harris does not suggest reliance on the code compliance certificate either. It is noteworthy that the Trust never involved the
Council in its investigations. Finally, nothing in Mr Harris’s letter
gave the Trust reason to believe it might rest on the
code compliance
certificate. He did not dismiss the problems being experienced, recommending
rather that they should be investigated
and specifically addressing the trusses
in two of his recommendations.
[117] Accordingly, I am satisfied that the Trust did not specifically rely
on the code compliance certificate when deciding not
to action Mr Harris’s
recommendations. It follows that its claim ought to have failed at trial for
want of causation.
[118] In case I should be wrong in this, I go on to consider whether an
inspection would have identified defects and led to them
being
remedied.
Would the recommended inspection have revealed the
defects?
[119] I introduce this topic by remarking that the question
whether inspection would have revealed the defects and ultimately
averted the
collapse requires an answer at two different points in the
narrative:
(a) The first is in November 2001, when the Council received the plan
from Mr Major recording the trusses’ heights.
It is said that the
Council ought to have insisted on strict compliance with conditions of the
building consent, and that
had precamber measurements been taken an
inspection must have ensued.
(b) The second is in 2006, when, as I have just discussed, the Trust
was advised to take precamber measurements and inspect
the trusses, but did not
follow that advice.
The circumstances differ — notably, the reason for inquiry was not the
same on each occasion — but the question does not.
It is whether an
inspection that included precamber measurements would have led to remedial work
that averted the collapse.
[120] I observe that to frame the question in this way is to reject Mr Heaney’s submission that the Trust must prove an inspection would have identified welding defects — specifically, the missing weld atop the midspan of truss one — that
triggered the collapse. Rather, the Trust must show that inspection would
have identified defects that would have resulted in further
remedial work that
would have averted the collapse. The distinction matters because there were
several defects, some obvious and
some not.
[121] The Judge did not establish what would have happened had
the Trust inspected the trusses in 2006; as noted, she
found rather that it
was not on notice of a need to inspect. But she did make findings about what
would have happened had the Council
insisted on precamber measurements in
2001.
[122] Before addressing what an inspection would have revealed, I clear
away a factual question about what the Council ought to
have done when it
finally extracted the trusses plan from Mr Major in November 2001. At that
point the Council knew Mr Major had
not certified that the trusses precamber was
in line with Mr Harris’s design, as the building consent had specified and
the
Council had insisted in its letter of 30 January 2001.
[123] The Judge found that the Council ought to have insisted on having the precamber measurements checked.99 I did not understand Mr Heaney to challenge this finding. (His point rather was that an inspection would not have revealed the defective welds, and the absence of precamber would not in itself have been thought to warrant further remedial work.) I record my agreement with the Judge that the Council ought to have insisted on precamber measurements. It had made them a condition of consent, faithfully following Mr Harris’s recommendation, and it does not claim to have made an informed decision that precamber did not matter after all.100 As Mr Ring remarked, the fact that Mr Major did not have the measurements to hand ought to have excited concern. Had they been taken, they would have shown that the trusses did not meet Mr Harris’s design precamber measurements. Far from exhibiting a uniform precamber, some of them still sagged. Having learned that, the Council ought to have inquired further, insisting that an engineer inspect the trusses
and confirm the roof structure was safe.
99 High Court judgment, above n 1, at [146]–[147].
[124] Lack of precamber was
not in itself a cause of the collapse. Rather, it is said that precamber
measurements would confirm
whether the work had been done properly and an
investigation must have revealed the other defects. The Judge found that
inspection
would have led “in all likelihood” to the welding
defects being discovered.101 She did not elaborate on that
conclusion, which falls short of a finding on the balance of probabilities that
precamber measurements
would have averted the loss.
[125] Mr Harris did not give evidence, although the remedial work was his
design and both parties appear to agree that had further
investigation been
required, he, rather than Mr Major, would have been engaged to do it. As noted
earlier, Mr Major did not give
evidence either. The parties relied on expert
witnesses: for the Trust, Graeme Coles, a structural engineer, Clark
Hyland,
a structural engineer, Charles Wheeler, a welding inspector, and
Edward Saul, a building consultant; and for the Council, Adam
Thornton, a
structural engineer.
[126] There was much common ground among the experts about the defects and
their causal effect. Apart from the missing top
welds, the chords were
visibly misaligned, the side strengthening plates were not continuous across the
top chord splices, stitch
welds used to fix the side plates to the chords were
inadequate, and weld preparation, including grinding, had been unsatisfactory.
All in all, the work was seriously substandard.
[127] Discontinuity of the side strengthening plates across the welded
splices was a critical defect, because it left the
structure wholly
dependent on the quality of welding at points where the chords had been cut
and packed. Mr Hyland explained
that one of these points, the midpoint of the
top chords, was the most highly loaded part of the trusses, vulnerable to
compression
failure, and Mr Coles agreed that the trusses were prone to buckle
at that point.
[128] The engineering and welding experts conferred. They were asked to advise whether the defects would have been visible on inspection. They agreed that an
engineer inspecting the trusses would not have been content to do so
from the
101 High Court judgment, above n 1, at [147].
ground. This disposes of Mr Heaney’s submission that an inspection
might have been limited to a view from ground level. In
any event, side-plate
discontinuity and chord misalignment were obvious from the ground. For these
reasons I am satisfied that an
engineer would have used access equipment such as
a scissor lift to examine the trusses closely. That conclusion finds support
in the evidence of Mr Hyland, who stated that a competent engineer inspecting
the welding in the first place would have examined
the welds “up
close” or had a welding expert do so. The experts agreed that on close
inspection an engineer “would
have seen enough to raise the alarm and
require full inspections by [a] welding inspector”. Such inspection
would have revealed
defects in preparation and penetration of welds. The
experts also agreed that the missing top welds might not have been observable
but an engineer “would know if [you] can’t see it then you
can’t weld it”.
[129] This evidence satisfies me that an inspection would indeed have led
to the defects being discovered. Even if the missing
top welds were not
identified on close inspection, which I think implausible, the remaining
defects, notably the discontinuous side
strengthening plates, would have led to
the conclusion, upon which the experts also agreed, that the work did not comply
with Mr
Harris’s design, or relevant industry standards, or the building
code. Further remedial work must have been recommended.
[130] This conclusion is as true of an inspection conducted in 2006, when
the Trust was advised to have the precamber measured and
welds checked, as it is
in 2001, when the Council ought to have insisted on precamber
measurements.
Having learned of the defects, would the Trust have attended to
them?
[131] I accept that, the defects having been identified, the Trust would have attended to them.102 The defects seriously compromised the roof ’s structural
integrity and the trustees were alive to safety
concerns.
Conclusions on
causation
[132] The Trust proved on the balance of probabilities that precamber
measurement would have led to an inspection that revealed
the defects, or enough
of them to identify a pressing need for further remedial work, and that it would
have remedied those defects.
[133] However, the claim lies in negligent misstatement and the Trust
failed to prove that it specifically relied on the code compliance
certificate
at any relevant time. That being so, the claim must fail on causation
grounds.
The Trust’s attempt to support the judgment on other
grounds
[134] Anticipating that the Council might show it would not have been
negligent to issue the certificate in reliance on Mr Major’s
PS4 and
trusses measurements, so curing its earlier default, Mr Ring sought to support
the judgment on other grounds. He submitted
that the Council was negligent not
to have a pre-prepared code compliance checklist and a PS4 acceptance policy,
and not to have
identified discrepancies between Mr Harris’s design
and the as-built work during its other inspections. (It will be
recalled
that the Council did not inspect the remedial work but its inspectors were on
site for other purposes.)
[135] In my opinion, we need not decide these issues, and lacking evidence of current practice affecting producer statements, I prefer not to do so. Producer statements are still used under the 2004 Act, but without specific legislative authority, and as the Judge noted, industry standards have moved on since 2000.103
But I do remark on one matter. Mr Ring argued that the Council was negligent
to
accept a PS4 from Mr Major given his proven unreliability. Dunningham J rejected this argument, reasoning the Council lacked the in-house expertise to inspect the work.104 I agree with her, but for different reasons. Mr Major was qualified as an engineer and subject to the disciplinary control of a professional body (the Institute of Professional Engineers New Zealand), and the Council had taken what seemed at
the time reasonable steps to remind him of his responsibilities and
secure assurances
103 High Court judgment, above n 1, at [119]–[120].
104 At [142].
that he would comply in future. Given his unsatisfactory past performance on
this particular project, the Council ought to have insisted
on full and timely
compliance with the conditions of consent, but that is only to confirm that the
Council ought to have required
precamber measurements.
Contributory negligence
[136] I here assume that, contrary to my conclusions above, the Council is
liable in negligent misstatement and record my conclusions
about the defence of
contributory negligence. The Contributory Negligence Act 1947 provides
that:105
Where any person suffers damage as the result partly of his own fault and
partly of the fault of any other person or persons, a claim
in respect of that
damage shall not be defeated by reason of the fault of the person suffering the
damage, but the damages recoverable
in respect thereof shall be reduced to such
extent as the court thinks just and equitable having regard to the claimant's
share in
the responsibility for the damage...
“Fault” is defined to mean “negligence ... or other act or
omission which gives rise to a liability in tort”.106 This
has been interpreted as a failure by the plaintiff to take ordinary care to look
after itself and its property.107 The assessment is objective, and
it examines both relative blameworthiness and causative potency.108
The loss cannot be too remote.109 Ultimately the decision is
one of fact and impression.
[137] The Council invokes the defence for the Trust’s inaction following Mr Harris’s advice of 9 June 2006, not for anything the Trust did beforehand. So, for example, Mr Heaney did not argue that the Trust was negligent to nominate Mr Major, rather than Mr Harris, as the expert who would certify the work in a PS4. This means the Council does not say that the Trust’s conduct mitigates its own
blameworthiness for negligently issuing the code compliance
certificate; it says
105 Section 3(1).
106 Section 2.
107 Helson v McKenzies (Cuba Street) Ltd [1950] NZGazLawRp 70; [1950] NZLR 878 (CA) at 920; Johnson v Auckland City Council [2013] NZHC 165 at [13]; and O’Hagan v Body Corporate 189855 [Byron Avenue] [2010] NZCA 65, [2010] 3 NZLR 445 at [76]–[77].
108 Gilbert v Shanahan [1998] 3 NZLR 528 (CA) at 534; Byron Avenue, above n 107, at [67];
Johnson v Auckland City Council, above n 107, at [16]–[17].
109 Price Waterhouse v Kwan, above n 72, at [28].
rather that several years later the Trust passed up an opportunity to
identify the primary cause, the building defects, and so avoid
the
loss.
[138] Mr Heaney argued for as much as 75 per cent contribution, while Mr Ring contended, as will already be apparent, that the Judge correctly found the Trust was not at fault at all. Her reasoning, as explained above, was that Mr Harris’s advice of
9 June 2006 did not put the Trust on notice that it ought to inspect the
precamber and welds.
[139] I have taken a different view of the facts, finding that the Trust
ought to have had an engineer inspect the trusses
and inspect the
welds, as Mr Harris recommended. The Trust was squarely on notice of his
recommendations, which were
directed to safety concerns, and it knew, as the
Council seemingly did not, that the roof’s performance might evidence a
structural
problem. In my opinion, nothing distinguishes the moral
blameworthiness or causative potency of the Trust’s conduct in 2006
from
that of the Council in 2001. The Trust did not rely on the code compliance
certificate when choosing not to inspect, so it
cannot justify inaction on that
ground. Inspection in 2006 would have revealed the defects and avoided the
loss, just as surely
as the Council’s insistence on precamber measurements
in 2001 would have done.
[140] I would fix the Trust’s contributory negligence at 50 per
cent.
The Council’s claim to an indemnity in contract
[141] The Council pleaded that under the lease the Trust agreed to
indemnify it from all actions, claims and costs whatsoever that
might arise
during the building’s construction, erection and operation. It sought to
enforce the indemnity if found liable
for negligently issuing the code
compliance certificate.
[142] The first question is whether the indemnity reaches the
Council’s liability qua
regulator, as a matter of construction. Exclusion clauses are narrowly
construed, but
the interpretation adopted should reflect the parties’ presumed
mutual intention.110 I
have quoted cl 23 of the lease
at [45] above. It extends to “all actions, suits, claims
... whatsoever”. I find this language apt to include negligence.
The question is whether it ought to be confined to the
parties’
relationship as lessor and lessee.
[143] As to that, I agree with Dunningham J that in context the indemnity
should be limited to liability arising from the lessor-lessee
relationship.111 It extends to the construction and operation of
buildings on the land, but such liabilities might arise in that relationship.
It
follows that the indemnity need not extend to regulatory obligations having
nothing to do with the parties’ contractual relationship.
I find it
improbable that the parties meant to exempt the Council from liability of that
kind.112
[144] Mr Heaney argued that the project agreement addressed allocation of
risk, because the Trust there agreed that it would keep
the Council indemnified
against any damage arising from the stadium works. He invited us to read the
lease with the project agreement,
which attached a copy of the lease as a
schedule. But as noted, the project agreement was not pleaded. In any event,
I very much
doubt that it extends to liability qua regulator either.
[145] Mr Ring also argued that it would be contrary to public policy to allow a local authority to circumvent its obligations under the 1991 Act by requiring an indemnity from building owners.113 I accept that courts may find contrary to public policy, and so illegal,114 an agreement that significant statutory duties need not be performed.115
It is only a modest extension of this principle to say that a court may refuse to allow the duty-bound party to insist that potential plaintiffs execute an indemnity before doing what the legislation requires, so eliminating the principal remedy for any breach. That said, I need not take that course here, because the indemnity did not extend so far. I add that the lease and project agreement served a proper purpose and
any invitation to sever a specific clause for illegality would
presumably be decided
111 High Court judgment, above n 1, at [181]–[185].
112 Such indemnities have been described as “inherently improbable”: Smith v South Wales
Switchgear Co Ltd [1977] UKHL 7; [1978] 1 WLR 165 (HL) at 168.
113 i-Health Ltd v iSoft NZ Ltd [2011] NZCA 575, [2012] 1 NZLR 379 at [39]; and JF Burrows and
RI Carter (eds) Statute Law in New Zealand (4th ed, LexisNexis, Wellington, 2009) at 35–36 and
38–39.
114 Illegal Contracts Act 1970, s 5.
115 i-Health Ltd v iSoft NZ Ltd, above n 113, at [34]–[37] and [39].
under the remedial provisions of the Illegal Contracts Act 1970, which the
Trust did not invoke.116
Betterment
[146] I turn to the Trust’s cross-appeal. It argues that Dunningham
J ought not to have allowed for betterment. On the view
I take of the case this
issue does not arise, because we intend to set aside the award of damages. I
address it in case I should
be wrong in my earlier conclusions.
[147] The parties agree that the Trust’s only realistic option was to
rebuild, meaning that it got a new building in lieu
of a decade-old one. This
put betterment in issue. As noted, the Council sought a deduction of $1,542,002.
That represented a quantity
surveyor’s estimate of depreciation on
building components that would need maintaining or replacing during the lease
term.117 The Trust denied betterment, saying that it had been
forced to incur capital expenditure prematurely and that the Council will be
the
ultimate beneficiary of the expenditure when the stadium reverts to its
ownership at lease end.
[148] Dunningham J rejected the argument that the Trust benefited by
getting a more valuable building, noting that it cannot sell
the building and
will not be paid for it at lease end, and she did not accept that the Council
would benefit by getting a newer building
at lease end either.118
The Trust held the building, and the Council would do so in time, for
community recreation purposes and not for sale. Her conclusions
on this point
are not in dispute on appeal.
[149] However, the Judge accepted that the Trust will benefit by saving some of the cost of refurbishing or replacing building components, as the lease requires, when they wear out during the term.119 She declined to quantify savings by applying a rate
of depreciation to such items, pointing out that the Trust would not
need to replace
116 Illegal Contracts Act, ss 6 and 7(1); Edwards v O’Connor [1988] NZHC 693; [1989] 3 NZLR 448 (HC); and Thomas Gault (ed) Gault on Commercial Law (online looseleaf ed, Thomson Reuters) at [IC7.04].
117 It appears to have been common ground that the assessment should be based on a single term.
118 High Court judgment, above n 1, at [202]–[203].
119 At [204].
those having a lifespan of more than 33 years.120 For example,
the exterior steel cladding had an estimated lifespan of 35 years; that being
so, no allowance should be made for it
notwithstanding that it would have
depreciated by 28 per cent in 2010.
[150] The Judge held rather that an allowance could be made for any item
for which the Trust avoided a maintenance cycle during
the term because of the
rebuild. The evidence did not allow the Judge to quantify betterment on this
basis, for there was no agreed
or reliable maintenance schedule. The Council
relied on a “stadium project list” prepared by the Trust in 2008
to
aid analysis of capital replacement, maintenance and operational costs, but
the Judge accepted that the list’s projections
were exaggerated and had
not been borne out in practice. Accordingly, she approached the assessment as
a matter of impression.
She was satisfied that there would be some maintenance
savings, and she decided that an allowance of five per cent of the rebuild
cost
was a reasonable estimate.121 She rounded the resulting figure to
$750,000. She declined to adjust it for any carrying costs of premature
expenditure, noting
that the Trust is funded by external grants.
[151] The object of damages is to restore the plaintiff to the position it
would have occupied but for the defendant’s wrongdoing.
Betterment is a
tool used to achieve that objective where, as here, the defendant’s
negligence forces the plaintiff
to replace property with something of
greater value.122 Any deduction for betterment is net of an
allowance for any disadvantages associated with the untimely and unavoidable
nature of the
plaintiff’s investment.
[152] Counsel agreed that the Council must prove quantum or value of betterment, which can take the form of savings resulting from deferred spending on replacement or maintenance during the lease term.123 They differed on the requirements of proof. Mr Ring contended that proof of a “real pecuniary advantage” here requires a component-by-component approach, in which each of the major building elements is
analysed separately, and if there is no evidence of quantum, so that
betterment is
120 At [209].
121 At [217].
122 J & B Caldwell Ltd v Logan House Retirement Home Ltd [1999] 2 NZLR 99 (HC) at 106–108.
123 At 109.
“virtually impossible” to assess, the Court can make only a
nominal allowance.124
He submitted that the Judge’s conclusion was speculative, largely
because she did not identify which stadium components would
benefit from a
maintenance saving. Mr Heaney responded that the Judge need only make a
fact-specific assessment and attempt to put
a financial figure on it as best she
could.125 For that proposition he cited Battersby v Foundation
Engineering Ltd and Gunton v Aviation Classics Ltd
(Gunton).126
[153] I accept Mr Heaney’s submissions on this point. If the
plaintiff proves that it suffered a substantial loss, a court
will not refuse an
award, or allow only nominal damages, because the loss is difficult to quantify,
and this principle must apply
equally to any adjustment for betterment, the only
difference being that betterment is the defendant’s to prove, not the
plaintiff’s
to eliminate.127 As Fisher J put it in J &
B Caldwell Ltd v Logan House Retirement Home Ltd, still the leading New
Zealand authority on betterment, courts will do their best to assess
damages using such evidence as
they have.128 And in Gunton,
Chambers J held that there are no hard and fast rules and an in-the-round
assessment is appropriate.129
[154] For the Council, Allan Green, the quantity surveyor, gave evidence about maintenance savings, relying on his experience and the Trust’s stadium project list to identify items that would need replacing within the lease term. The Trust itself had estimated that a substantial number of items would want replacing and Mr Green’s list (with estimated replacement cost, before depreciation) included floor finishes and protection ($762,000), ceiling tiles ($301,000), fire and smoke detectors ($265,000), and some electrical fittings ($193,000). The estimated lifespans may have been
conservative, but it seems plausible that some of these items, such as
the floors (for
124 Voaden v Champion (The Baltic Surveyor and Timbuktu) [2002] EWCA Civ 89, [2002] 1 Lloyd’s
Rep 623 at [84]–[85].
125 Voaden v Champion (The Baltic Surveyor and Timbuktu), above n 124, at [86]; and Gunton v
Aviation Classics Ltd [2004] 3 NZLR 836 (HC) at [216]–[221].
126 Battersby v Foundation Engineering Ltd HC Auckland CP 26/97, 5 July 1999 at 29–30; and
Gunton v Aviation Classics Ltd, above n 125.
127 Wilson & Horton Ltd v Attorney-General [1997] 2 NZLR 513 (CA) at 524 citing Chaplin v Hicks
[1911] 2 KB 786 (CA) at 792 and 795.
128 J & B Caldwell Ltd v Logan House Retirement Home Ltd, above n 122, at 105. The Court was clearly here with damages generally, but this principle applied equally to betterment: see the list of principles at 110–111.
129 Gunton v Aviation Classics Ltd, above n 125, at [213].
which the Trust had projected a lifespan of 2–15 years depending on
floor type)
would need replacing within the term.
[155] The Trust’s quantity surveyor, Mark Burrows, was not called but
a schedule he prepared in conjunction with Mr Green
was in evidence. He also
calculated betterment by depreciating replacement cost for the items listed by
Mr Green, using rates representing
the percentage of useful life expired as at
2010. He appears to have adopted different periods for life expired. His
rates of
depreciation resulted in a number of items being near the end of their
lives at lease end, such as the steel cladding, but only one
(the carpet in the
amenities block) in need of replacement within the term. He estimated
maintenance savings at $828,373 on a depreciation
basis.
[156] On the evidence it was proper to infer that the rebuild resulted in
maintenance savings that must have been substantial.
Quantifying these savings
was a matter of judgement, using the available evidence. The Judge might have
used depreciation rates
for all of the items in Mr Green’s schedule, and
it was open to her to use a percentage of the rebuild cost as a proxy. The
evidence I have discussed above satisfies us that the deduction of $750,000 was
reasonable. In short, I am not persuaded that
Dunningham J was
wrong.
[157] It follows that in my view the cross-appeal on betterment
fails for two reasons. First, it is redundant, there
now being no award of
damages to discount for betterment. Second, if the award was correct, the Judge
did not err in her assessment
of betterment.
Result
[158] The Court being unanimous in the result, the appeal is allowed. The
award of damages is set aside and judgment is entered
for the Council on the
Trust’s claim. We do not disturb the result in the High Court on the
Council’s counterclaim.
[159] As noted earlier, the Trust also cross-appealed Dunningham J’s decision that GST is not payable on damages or interest. This too is redundant, but the parties hoped to resolve the issue and asked us to reserve it for further argument before us if
necessary. Accordingly, the parties have leave to bring the issue on for
argument should the Trust succeed on further appeal and
the parties require a
decision. The cross-appeal is otherwise dismissed.
[160] The Council, having succeeded overall, will have one set of costs for a complex appeal on a band B basis with usual disbursements including disbursements on the cross-appeal. We certify for second counsel. Costs in the High Court should be fixed there if counsel cannot agree them.
REASONS OF HARRISON AND COOPER JJ
(Given by Harrison J)
TABLE OF CONTENTS
Introduction [161] Facts [167] Duty of care [173] Introduction [173] Policy: whether it is reasonable to impose a duty [177] Special relationship [186] Reliance [199] Contributory negligence, indemnity and betterment [208] Result [211]
Introduction
[161] The Trust asserts not only that the Council owed it a duty
to exercise reasonable skill and care when
issuing the code
compliance certificate (the certificate) on 20 November 2000. It asserts
also that the scope of the
duty extended to protecting and thus indemnifying the
Trust against the financial consequences of defects in the stadium’s
construction created by the negligence of the Trust’s own building
contractors, engineer and architect, which was the direct
cause of that loss.
In our judgment this case is untenable.
[162] The Trust’s case must fail for a number of complementary reasons. To invert the orthodox two-staged approach of successively considering the factors particular and external to the relationship, the first reason is that such a result would not be fair, just and reasonable in what is ultimately a policy-laden inquiry.130 The second reason arises from the proximity inquiry into the particular relationship: it cannot be said that the Council issued the certificate for the purpose or with the expectation of the Trust’s reliance upon it for the financial protection it now seeks. In this respect, the law does not deem the Council to have assumed a responsibility to the Trust of that scope. The third reason is that we are not satisfied the Trust did in fact rely upon
the Council in the manner pleaded.
130 The Grange, above n 14, at [156] per Blanchard, McGrath and William Young JJ.
[163] Without doubt, the Council owed a statutory duty to a wide range of
entities, including the Trust, to exercise reasonable
skill and care when
issuing the certificate. Without doubt also, the Council was negligent in
performing its obligations. But duties
of care do not exist in a vacuum and
those two affirmative answers beg the underlying question of whether the Council
owed a common
law duty of care to the Trust of the scope for which it now
contends. That question is to be determined by identifying the kind
of
damage, if any, for which the law might attribute responsibility to the
Council.131
[164] The Trust pleaded alternative causes of action in negligence and
negligent misstatement. In the High Court and before us
it was common ground
that all the Trust’s allegations of negligence relating to the
Council’s statutory functions
of issuing building consents and carrying
out inspections were time barred. Only the claim based on the negligent
certificate remains
within time and must be arguable solely as one for negligent
misstatement requiring proof of specific reliance.132 We will
confine our analysis to that cause of action alone.
[165] In our judgment the Supreme Court’s decision in Spencer on
Byron is not determinative. It stands as authority for the rule that, when
exercising its statutory function of inspecting construction
of a building which
combines commercial and residential uses, a local authority arguably owes the
same duty of care in general negligence
to all owners regardless of
status.133 The decision also reaffirms that proof of specific
reliance is not a necessary element of the tort of general negligence but
remains
an essential prerequisite of a claim for negligent
misstatement.
[166] In Spencer on Byron McGrath and Chambers JJ held that the owner’s alternative claims based on code compliance certificates ought to be considered under the tort of negligent misstatement.134 On the assumed facts, where the alleged negligence included both inspections and consents, the Judges were satisfied that
such a claim was redundant because the claimants may face the additional
hurdle of
132 See [72] above.
133 Spencer on Byron, above n 2, at [215]–[216] per McGrath and Chambers JJ, [22] per Elias CJ
and [26] per Tipping J.
134 At [219].
demonstrating reliance without receiving any additional relief.135
McGrath and Chambers JJ later discussed the purpose of the certification
regime to emphasise that liability in general negligence
“is not to hinge
on the particular nature [that is, commercial or residential] of the building
being constructed”.136 Tipping J accepted that it was
“not a long step” from imposing liability for negligently issued
LIMs to imposing a duty
of care in negligent misstatement when certifying code
compliance but he cautioned “[t]hat duty must of course be tailored
to the
exact form in which [such] certificates are designed to be
issued”.137
Facts
[167] Given their centrality for our findings on liability, the facts
relevant to the Trust’s negligent misstatement claim
and pleaded reliance
on the certificate justify recitation in a little detail.
[168] The material events preceding the Council’s decision to issue
the certificate
on 20 November 2000 are as follows:
(a) On 4 January 2000 Mr Harris prepared a PS2 for its design review of
the remedial work on the trusses, accompanied
by written advice about
implementing the proposed remediation. Two days later Mr Tonkin met on
site with the Trust’s
engineer, architect and builders to discuss the
proposed works. The Council was advised an application for an amended
building consent would follow.
(b) On 14 January 2000 the Council issued a building consent for amendment 1 for the remedial work to the trusses, subject to a number of conditions. Among them were that, Mr Major in his capacity as the Trust’s engineer must (1) confirm in writing to the Council that the precamber of the six trusses was in line with Mr Harris’ letter dated
4 January 2000, including individual truss measurements;
and
(2) provide a PS4 of construction review for the remedial
work.
135 At [220].
136 At [222].
137 At [49].
(c) On both 17 and 21 February 2000 Mr Tonkin wrote to Mr McCulloch in
his capacity as the Trust’s architect advising
of his understanding that
work on the trusses was complete; and reminding Mr McCulloch of the conditions
of the building consent
requiring Mr Major’s provision of a PS4 and
written confirmation about the precamber measurements.
(d) On 1 March 2000 the Trust submitted to the Council its
“Advice of Completion of Building Work” for the remediation
work
required under the building consent for amendment 1, triggering the
Council’s assessment of code compliance under s 43(1)
of the 1991 Act.
This advice was wrong, as subsequent events proved.
(e) On 10 March 2000 Mr McCulloch wrote to the Council advising of the
Trust’s desire to resolve all outstanding issues
prior to opening at the
end of that month.
(f) On 24 March 2000 the Council issued a number of interim
certificates for the sole apparent purpose of enabling the Trust
to proceed with
the formal opening of the stadium by the then Prime Minister the
following day. The interim certificate
for structure and plumbing included a
non-exhaustive list of conditions requiring the Trust’s satisfaction
before a final certificate
could be issued. Crucially, as Miller J has
noted,138 the interim certificates did not include any
reference to the building consent for the remedial work.
(g) On 31 October 2000 the Council wrote to Mr McCulloch noting again that a final certificate could still not be issued because of the Trust’s failure to satisfy the conditions imposed earlier on the building consent. In particular, the Council repeated its requests for Mr Major to provide written confirmation that the precamber of the six trusses aligned with Mr Harris’ letter dated 4 January 2000 and his PS4. The
Council’s letter concluded: “When the work is
completed, please
138 See [28] above.
contact the consents clerk to arrange a further inspection.” This
activity had apparently been generated by the Trust’s
requirement for a
final certificate to enable it to obtain an onsite liquor licence.
(h) On 16 November 2000 the Council again wrote to Mr McCulloch,
enclosing a copy of its letter dated 17 February 2000 about
the trusses and
reminding him that no reply had been received.
[169] On 20 November 2000 the Council issued a final certificate for the
remedial work without the Trust’s confirmation of
its completion in
accordance with the Council’s building consent conditions or a further
inspection. Nevertheless, the document
purported to certify unconditionally
the Trust’s compliance with the terms of the original consent and the
building code.
No additional fee was charged. The certificate stated it was
issued pursuant to s 43(3) of the 1991 Act, which materially provided:
43 Code compliance certificate
(1) An owner shall as soon practicable advise the territorial
authority, in the prescribed form, that the building work has
been completed to
the extent required by the building consent issued in respect of that building
work.
...
(3) Except where a code compliance certificate has already
been provided pursuant to subsection (2) of this section, the territorial
authority shall issue to the applicant in the prescribed form, on payment of any
charge fixed by the territorial authority, a
code compliance certificate, if
it is satisfied on reasonable grounds that—
(a) The building work to which the certificate relates complies
with the building code; or
(b) The building work to which the certificate relates complies with
the building code to the extent authorised in terms of
any previously approved
waiver or modification of the building code contained in the building
consent which relates to that
work.
...
(8) Subject to subsection (3) of this section, a territorial authority
may, at its discretion, accept a producer statement
establishing compliance with
all or any of the provisions of the building code.
(Our emphasis.)
[170] Mr Tonkin’s evidence-in-chief at trial was that the certificate
represented the Council’s satisfaction on reasonable
grounds that the
remedial building work complied with the building code and the
building consent. However, in
cross-examination by Mr Ring, Mr Tonkin
admitted that the certificate was issued and signed by an unauthorised consents
clerk in
the Council’s building regulations services team. The certifier
had acted without Mr Tonkin’s knowledge or any input
from the
Council’s building specialists. In Mr Tonkin’s view, the likely
reason for the premature certification was
to enable the Trust to secure the
onsite liquor licence; he said it was not unprecedented for Council employees to
accommodate advance
requests from trusted applicants.
[171] These subsequent exchanges between the parties are relevant
also:
(a) On 15 January 2001 the Council again advised the Trust of
its ongoing failure to satisfy the building consent
for amendment 1 by providing
the PS4 and related confirmation from Mr Major. The next day Mr Major advised
the Council of the
work taken to ensure realignment of the trusses. On
17 January, John Watson, a building code inspector, noted that “the
building in general is getting very close to final Code Compliance Certification
stage” but that the Council was still waiting
on producer statements for
the trusses. That same day Mr Major produced a PS4 to certify “as a
suitably qualified and independent
design professional ... that the
modifications have been generally constructed in accordance with the
details shown [in Mr
Harris’ design drawing]”. That statement,
made on the Trust’s behalf, was materially untrue.
(b) On 30 January 2001, following meetings between the Council building inspector and the Trust’s professional advisers, Mr Tonkin wrote to Mr Major acknowledging receipt of his PS4 but confirming
that one further condition of the original consent remained for satisfaction
— Mr Major had not delivered written confirmation
that the precamber of
the six trusses aligned with Mr Harris’ letter, nor had he included
individual truss measurements.
(c) On 23 July 2001 Mr Tonkin wrote to Mr McCulloch, confirming
again that a certificate could not be granted because
the consented work had not
been completed. He noted six outstanding requisitions, including that the datum
heights of the trusses
were required to allow for the future monitoring of
deflection.
(d) On 12 September 2001, following a meeting with Mr
Major, Mr Tonkin wrote to Mr McCulloch recording
their agreement that Mr
Major “will check with the structural steel company for datum heights for
the community court trusses”.
As Dunningham J noted in the High Court,
the stringency of the fourth condition to the building consent (see
[22]–[24] above)
had evolved in its interpretation by the Council into a
mere request for the heights of the trusses as a benchmark against which
future
deflections could be checked.139 But there was no independent
notification of relaxation of the Council’s original requisition for Mr
Major’s certification.
(e) On 30 October 2001 Mr McCulloch provided the Council with
measurements for the steel trusses showing the heights
from floor level to the
underside of each truss but without confirming the compliance of the precamber
measurements according to
Mr Harris’ letter. As Dunningham J found, there
was a considerable variation in the height shown on the
plan.140
(f) On 28 November 2001 Mr McCulloch wrote to the Council with
advice on various outstanding items, expressing on behalf
of the
Trust
139 High Court judgment, above n 1, at [55].
140 At [56].
the expectation that the answers were satisfactory and that the Trust
was “await[ing] code compliance to be issued for [the
stadium]”.
[172] On 9 April 2003, some 29 months after the nominally final certificate
had been issued by the unauthorised consents clerk,
the Council issued a final
code compliance certificate for the original building consent.
Duty of care
Introduction
[173] This case is conceptually unique. The owner of a building whose
contractors were alone responsible for creating the defects
which caused it loss
seeks to recover the full amount of that loss from another party. Of the
Supreme Court’s recent decisions
in this area, The Grange offers
the closest analogies.
[174] In The Grange the North Shore City Council sought indemnity
from the Building Industry Authority (BIA), the statutory supervisor of the
regulatory
system for building work, by asserting that the BIA owed a duty of
care reviewing the Council’s operations under the 1991 Act.141
The Council claimed that a report of that review, of which the BIA had
given it a copy, was negligently prepared and had lulled it
into a false sense
of security, leading in turn to its failure to rectify its existing practices of
issuing negligent building consents
and code compliance certificates. The
Council sought to recover from the BIA the losses which it agreed to pay in
settlement of
claims by property owners. Its counsel realistically accepted,
however, that the claim should be one for contribution rather than
for full
reimbursement given the Council’s exposure on a defence of
contributory negligence.
[175] The majority in The Grange emphasised throughout that the Council’s proper claim lay in negligent misstatement, not in general negligence. In that context, Blanchard J (writing also for McGrath and William Young JJ) reinforced the conventional two-stage inquiry common to both species of the tort, based first upon
considerations of foreseeability and proximity and then the
policy question of
141 The Grange, above n 14, at [95] per Blanchard, McGrath and William Young JJ.
whether it was fair, just and reasonable to impose a duty.142
However, a critical feature of distinction within the first stage is that
a court must be satisfied in a negligent misstatement claim
of the existence of
a special relationship between the parties from which it can be said one party
has assumed a responsibility as
a matter of law to the other party for the
quality of its work.143
[176] Tipping J’s explanation of the appropriate approach is directly
material to these facts:
[220] For a duty of care to be reasonable as between the parties, the loss
or damage involved must have been reasonably foreseeable.
If it was not, it
would not be reasonable to impose a duty. But the fact that the loss is
foreseeable does not of itself make it
reasonable to impose a duty. In a case
involving an asserted liability for words it will seldom, if ever, be reasonable
to impose
a duty on the speaker or writer, unless that party ought reasonably to
have foreseen that the other party would rely on what was
said or left unsaid.
Furthermore, any such reliance must itself have been reasonable. Hence the
concept of foreseeable and reasonable
reliance usually lies at the heart of
whether it is reasonable to impose a duty of care in a case involving words
negligently written
or not written, customarily called a case of negligent
misstatement. A feature of the foregoing analysis that is particularly
important in the present case is that it is not usually reasonable for a party
to whom words are addressed for one purpose to rely
on them for a different
purpose.144
Policy: whether it is reasonable to impose a duty
[177] Our starting point is with the policy inquiry relevant to the
asserted duty of the Council to protect the Trust against financial
loss caused
by the fault of its contractors who created and failed to remedy the physical
defects in the building. Tipping J viewed
this inquiry — “whether it
is reasonable to impose a duty” — as “the ultimate
question” for a
court to determine when assessing a duty of
care.145
[178] In his seminal speech in Anns v Merton London Borough Council (Anns),
Lord Wilberforce treated it as axiomatic that a territorial authority did not
owe a duty of care when exercising its statutory powers
“to a negligent
building owner, the
142 At [156].
143 At [188].
144 Attorney-General v Carter [2003] NZCA 48; [2003] 2 NZLR 160 (CA) at [26].
145 The Grange, above n 14, at [218].
source of his own loss”.146 As a matter of principle, we
are satisfied that such an exemption extends to the negligence of the
owner’s agents.
[179] We accept that the Trust’s architect, engineer and contractors
were not agents in the orthodox sense. They were
independent contractors
engaged to perform specific tasks for the Trust through separate contractual
chains. In that situation,
the rules of attribution — the law’s
treatment of one party’s acts or omissions as those of another —
would
not normally apply. Different considerations prevail, however, where a
claimant, whose loss is directly caused by those contracted
experts, asserts
that a territorial authority nevertheless owes it a duty when performing its
statutory functions to protect it against
the same loss. One critical factor
is the degree of integration of the acts or omissions of a formally independent
contractor into
the construction project, particularly if they involve the
sort of work which would otherwise be carried out by an employee.147
The statutory language and policy all assume importance in this
respect.
[180] In Byron Avenue an issue arose about the relevance of a solicitor’s failure to obtain a LIM to the Council’s defence of contributory negligence.148 This Court held that the professional’s omission was attributable to the owner on the basis that the negligent local authority should not be worse off where a solicitor had failed to make the necessary inquiries than where the fault was the purchaser’s own negligence.149
Liability should attach where the function entrusted to the professional is
that of representing a person with the result that the
service performed
consists in standing in the owner’s place and assuming to act in the
owner’s right, not in an independent
capacity.150
[181] As the Supreme Court affirmed in Hickman v Turn and Wave Ltd,
attribution in law is ultimately a question of policy, taking into
account any relevant
146 Anns v Merton London Borough Council [1977] UKHL 4; [1978] AC 728 (HL) at 758.
147 Bartle v GE Custodians [2010] NZCA 174, [2010] 3 NZLR 601 at [242] per William Young P
applying Davie v New Merton Board Mills Ltd [1959] AC 604 (HL) at 646 per Lord Reid.
148 Byron Avenue, above n 107.
149 At [99]–[100] per Baragwanath J and [145]–[146] per William Young P.
150 At [92] per Baragwanath J quoting Colonial Mutual Life Assurance Society Ltd v Producers and
Citizens Co-operative Co of Australia Ltd [1931] HCA 53; (1931) 46 CLR 41 at 48–49 per Dixon J.
legislation.151 The 1991 Act itself imposed responsibilities
on all parties to the consenting process for its efficient operation. Where a
complex
building is being constructed, both the quality of the building
professional’s performance and of the information produced
for the owner
and supplied to the local authority will directly affect the certification
process. In this case, it was the owner
which triggered the compliance process
by advising the local authority under s 43(1) that the work has been performed
to the extent
required by the building consent. The owner entrusted performance
of that obligation — and of the underlying obligation under
s 32 to carry
out the building work only in accordance with the building consent — to
its contracted third parties. We see
no difficulty in attributing their acts or
omissions to the Trust. Within a policy inquiry, a negligent act or omission
by a building
professional engaged by the commissioning owner to carry out its
own statutory requirement ought to be attributable to that owner.
[182] The House of Lords decision in Governors of the Peabody Donation Fund v Sir Lindsay Parkinson & Co Ltd (Peabody) illustrates the point.152 A commissioning owner had engaged an architect to ensure compliance with regulations relating to drains. Lord Keith reviewed the allocation of responsibility and risk within the statutory framework, concluding that the “person who puts in train a house building project” must bear responsibility for the economic loss flowing from reliance on the advice of its architects, engineers and contractors.153 It would, he said, “be neither reasonable nor just, in these circumstances, to impose on [the local authority] a liability to indemnify ... against loss” because of the authority’s omission to take steps to stop the installation of drains with rigid joints which ultimately required replacement.154 In short, the House of Lords attributed the architect’s negligence in failing to ensure compliance to the owner.155 The rationale is that it is normally
incumbent on the building owner to ensure compliance with the relevant
statutory
151 Hickman v Turn and Wave Ltd [2012] NZSC 72, [2013] 1 NZLR 741 at [91]–[99].
152 Governors of the Peabody Donation Fund v Sir Lindsay Parkinson & Co Ltd [1985] AC 210 (HL).
153 At 241.
154 At 241.
155 In Stieller v Porirua City Council, above n 39, this Court distinguished both the decisions in Anns, above n 146, and Peabody, above n 152, but not on this point; Stieller was a claim by a subsequent purchaser in negligence not by a building owner for negligent misstatement.
provisions. The local authority should not be liable to an owner who, with
the benefit of and reliance upon professional advice,
is in breach of these
provisions.156
[183] The Trust through its building contractors, engineer and architect
— who we will now refer to collectively as the Trust’s
“agents”157 — breached a similar duty in failing to
carry out the remedial work only in accordance with the building consent and
then in
advising the Council incorrectly that the work had been so completed
with the intention that the Council should accept its accuracy
and
reliability.
[184] In The Grange Blanchard J expressly approved this
Court’s earlier statement that in the building and related fields “a
duty of care
does not extend to protect a person who brings about his or her own
loss by negligence”.158 The defects which caused the stadium
to collapse were created solely by the negligence of the Trust’s agents.
They were directly
responsible for the design, construction and oversight of the
original and remedial work. They brought about the Trust’s
loss and the
consequences of their fault must be attributed to the Trust, which cannot assert
that the Council owed it a separate
duty of care to protect it against the same
negligence and indemnify it against the same loss.
[185] Such a result would not be fair, just or reasonable. In our view,
the claim must fail on this policy ground alone. However,
the issue of
proximity cannot be left to one side if the alleged duty of care is to be
comprehensively addressed. While Mr Heaney
conceded the proximity point in
regard to general negligence, we are well placed to review the relationship
between the Trust and
the Council in light of the evidence adduced in the High
Court.
Special relationship
[186] We are satisfied that the same result is independently justified by applying the settled principles governing a specific claim for negligent misstatement, which were
authoritatively reviewed in The Grange. The majority approached
the proximity
156 Investors in Industry Commercial Properties Ltd v South Bedfordshire District Council [1986] 2
WLR 937 (CA) at 958–960. See also Three Meade Street Ltd v Rotorua District Council, above n 23, at [50].
157 We adopt this term merely as convenient shorthand. See [179] above.
158 Wellington District Law Society v Price Waterhouse [2002] 2 NZLR 767 (CA) at [74] quoted in
The Grange, above n 14, at [182].
inquiry by examining first whether the complex statutory structure was
sufficient to give rise to a duty, concluding that inquiry
in the
negative.159 This case is different in that we accept s 43(3)
effectively deems a relationship of proximity in the general sense. Mr Ring
emphasised
the Chief Justice’s statement in Spencer on Byron that a
code compliance certificate is a council’s assurance of the owner’s
compliance with the building code and the conditions
of consent; where that
assurance fails, “the owner is entitled to look to the Council for his
loss”.160
[187] But that authoritative statement was, we emphasise, made within the
general reliance context and does not answer the critical
question of whether in
the circumstances of this particular relationship, where specific reliance is in
issue, the certificate was
issued to protect the Trust against the harm which it
later suffered, or whether it was entitled to rely on the certificate
to protect itself against the negligence of its agents. We accept that the
Council negligently certified to the Trust on 20
November 2000 its satisfaction
on reasonable grounds that the remedial building work for amendment 1 complied
with the building code.
On its face, as Mr Ring emphasised, the document
certified to the Trust the Council’s assurance of compliance. But that
factor of itself is not enough to justify imposing a duty of care. The statutory
proximity must be sufficient in the particular circumstances
to give rise to a
special relationship of the type alleged.
[188] The Grange and the Supreme Court’s later decision in Carter Holt affirm the elements of that special relationship:161 it must be of such a nature that (a) the Council knows inferentially that the Trust will use the certificate for the purpose of satisfying itself that the stadium complied with the code; (b) the certificate would likely be acted upon by the Trust for that purpose without independent inquiry; and (c) the Trust must in fact have acted in that way. The test is whether it was objectively reasonable for the Trust to rely on the certificate as it now says it did.162
As we have foreshadowed, the question is whether the statutory duty assumed
by the
Council under s 43(3) extended to avoid causing the Trust damage of the
kind which
159 The Grange, above n 14, at [170]–[186] per Blanchard, McGrath and William Young JJ.
160 Spencer on Byron, above n 2, at [14] per Elias CJ.
162 Compare The Grange, above n 14, at [190]–[196] per Blanchard, McGrath and
William Young JJ and see [220] per Tipping J.
it has sustained. Or, to put it another way, what was the scope of the duty
embraced by s 43(3)?
[189] To answer the latter question first, the purpose of a code
compliance certificate is beyond doubt.163 It is notice to all
interested parties — including the owner — of the Council’s
reasonable satisfaction that the
building has been constructed in accordance
with the building code, reflecting a territorial authority’s ultimate
control over
the building process. Its primary objective is to protect the
health and safety of those who use the certified building. It also
exists for
the secondary purpose of protecting financial interests, particularly subsequent
and prospective owners, insurers and
financiers. The logic for extending an
actionable duty to both physical and economic categories is that in neither
situation will
such parties have any control over the construction process nor
any means of protecting their interests.
[190] However, that rationale does not extend to protecting the economic
interests of a commissioning owner which has chosen
to protect itself
against physical damage and economic loss by engaging professional
advisers and contractors. The
Trust’s engineer designed the remedial
work which its specialist contractor was engaged to carry out. The Trust
employed another
engineer to oversee the work and authorised him to confirm to
the Council the Trust’s satisfaction of the building consent
conditions,
including provision of a PS4 to be accepted by the Council pursuant to s 43(8).
By engaging these third parties, the
owner has assumed direct control over the
design and construction functions. Control is the effective corollary of
reliance; the
owner relies for all intents and purposes on those whom it
appoints to control the construction process.
[191] Mr Ring sought to counter Mr Heaney’s emphasis on this point by reference to the Supreme Court’s decision in Sunset Terraces: in giving judgment for the majority, Tipping J affirmed that the likelihood of an owner’s engagement of building professionals did not negate the existence of a duty of care where general
reliance was in issue.164 However, the context
of that observation — in yet another
163 See Spencer on Byron, above n 2, at [187] and [222] per McGrath and Chambers JJ.
164 Sunset Terraces, above n 15, at [50]–[51].
Supreme Court decision on an application to strike out — was the
protection of purchasers who would place general reliance
on the
Council’s independent inspection role. It was not aimed at situations
in which a commissioning owner seeks damages
in circumstances where it was
clearly not relying on the Council to protect it against the claimed loss. In
a negligent misstatement
case, which has proceeded to trial and on which
evidence has been heard, the proper inquiry is whether it was reasonable and
foreseeable that the other party would rely and whether there was in fact
specific reliance.165
[192] The Trust knew the Council was not continuously present on site. Its
agents controlled the day-to-day performance and oversight
of the remedial work.
It knew that the Council relied largely on its agents’ advice about the
nature and quality of that work.
The Council cannot be taken to have
understood that the Trust would either use the certificate for satisfying itself
that the stadium
complied with the code or act upon it for the alleged purpose
without independent inquiry. In negligent misstatement terms, it
was
objectively unreasonable for the Trust to rely on the certificate for the
purpose it now seeks. Moreover, as the evidence discloses,
the Trust itself
continued through its agents to participate in an ongoing process
designed to satisfy outstanding
compliance issues after the certificate
had been issued.
[193] Blanchard J made the same point in The Grange: within the traditional two-stage inquiry, he described the concept of proximity as a means of identifying whether the defendant was someone most appropriately placed to take care to avoid the plaintiff’s loss.166 By engaging specialist agents, the Trust was the party most appropriately placed for this purpose. As Richardson J had earlier highlighted in this Court, a balance is required between the plaintiff’s claim for compensation for avoidable harm and the defendant’s claim to be protected from an undue burden of
legal responsibility.167 This factor is of
particular concern where a finding of liability
165 The Grange, above n 14, at [219]–[220] and [227]–[230] per Tipping J.
167 Fleming v Securities Commission [1995] 2 NZLR 514 (CA) at 532 and South Pacific
Manufacturing Co Ltd v New Zealand Security Consultants & Investigations Ltd, above n 56, at
306.
will create disproportion between the defendant’s negligence and the
plaintiff’s form
of loss.168
[194] This case starkly illustrates the possible extent of such
disproportionality. For an entitlement to charge relatively nominal
fees, the
Council has been visited with liability for more than $16 million. The effect
of the High Court judgment is that the Council
has warranted or underwritten the
cost of remedying the damage created by the negligence of the Trust’s
agents. In Spencer on Byron the majority rejected arguments about
economic consequences when deciding that a duty of care was arguably owed in
general negligence
to all owners.169 In the defining context of a
strike-out application, it did not accept that owners of commercial property
should be barred from recovery
for the reason that they were likely to be able
to guard against the adverse financial consequences of a third party’s
negligence.
[195] However, that approach must yield where the evidence given at trial establishes that the commissioning owner entered into contracts with its agents for the very purpose of guarding itself against these adverse consequences by what it considered was an appropriate allocation of risk to those who should accept responsibility for it. Mr Ring emphasised Dunningham J’s finding that the Trust was comprised of volunteers, was reliant on grants and donations and was thus a more deserving candidate for a duty than a commercial building owner carrying losses associated with defective construction as a business risk.170 While that statement is true, it cannot be advanced as a proposition of vulnerability. The Trust’s current chairman, Acton Smith, who had been a trustee since 1996, deposed that the trustees were community and business leaders — representatives from banks, retail, local government and the Community Trust of Southland. Mr Smith is himself a prominent and successful business leader. Another trustee was Warwick Cambridge, a leading commercial lawyer in Invercargill. The Trust also had access to
independent legal advice. With the benefit of this relatively
sophisticated
168 The Grange, above n 14, at [159] per Blanchard, McGrath and William Young JJ.
170 High Court judgment, above n 1, at [98]–[99].
governance, the Trust was a party to complex construction agreements
with its agents for the purpose, among other things,
of allocating
risk.171
[196] It is not in dispute that the Trust had and exercised rights of
recourse against its engineer. It had similar rights against
the contractor
and, in all likelihood, the architect. It was in a position to require the
engineer and other parties to carry sufficient
insurance cover to indemnify
them against the full extent of their liabilities. It was also able to
buy material damage
insurance. The Trust would, of course, have had to pay for
this cover. The premiums would have been substantial, reflecting the
risks
associated with a complex construction project. But if the Trust has failed to
protect itself in this way, the consequences
should not be transferred to the
Council and its ratepayers.
[197] In our judgment the Trust has, with the benefit of
hindsight, sought to reallocate the risk of its major
project to the
Council. The Trust is the party primarily responsible for the damage,
which should bear the financial consequences.
That is a powerful ground, whether
in the proximity or policy inquiry, for rejecting the claim.
[198] When all those factors are considered together, the requirement of
proximity is not established here. While the damage may
have been foreseeable
to the Council, foreseeability is no more than a screening process and does not
answer the more difficult question
of whether there was a special relationship,
one which was sufficiently proximate to justify imposition of a duty.172
We are not satisfied that such a relationship existed here.
Reliance
[199] If the Council did owe a duty of care of the type pleaded, we are not satisfied that the Trust has proved specific reliance on the certificate. The factual narrative establishes that it was throughout indifferent to whether a final certificate was issued or not. It elected to open the stadium to the general public without obtaining a code
compliance certificate for the remedial work. The terms of the building
consent for
171 The Grange, above n 14, at [180] per Blanchard, McGrath and William Young JJ.
172 At [158] per Blanchard, McGrath and William Young JJ.
amendment 1 remained unsatisfied. If the Trust was indifferent to the
primary purpose of building safety, it is implausible to assert
that it relied
on the certificate for an extraordinary or ancillary purpose.
[200] The evidence shows that the Trust’s primary, indeed sole,
reliance was placed in its own experts — its architect,
engineer and
contractors – whom it entrusted to carry out and control all the work. The
Trust did not rely on the Council for
anything material when it decided to open
the stadium for public use on 25 March 2000 other than for the interim
certificates, which
expressly did not certify compliance with the building
consent for the relevant remedial work.
[201] Mr Ring emphasised that the remedial work warranted special
attention. That was because the Council was putting its trust
for the proper
completion in the hands of the person whose mistakes made the remedial work
necessary, despite further doubts about
his construction monitoring which
prompted letters of reassurance. His submission rather exposes the irony in the
Trust’s
position which itself elected to place primary reliance on Mr
Major for the same purpose — even though his preceding
negligence
had already caused the Trust considerable cost and inconvenience. And the Trust
alone made the decision not to engage
Mr Harris to oversee the remedial works,
despite his unquestioned expertise.
[202] Mr Ring also emphasised Mr Smith’s evidence. He was apparently
involved throughout the construction process. He confirmed
the trustees’
concern following discovery in late 1999 of Mr Major’s defective
engineering design. Mr Smith said this
in his brief of evidence:
20. The trustees wanted an assurance from Mr McCulloch and Mr Major that the current structure had integrity, was safe, complied with acceptable design standards, and would remain intact for the expected life of the building. We also asked that an independent engineer certify that the structure, following the remedial action, would be sound, would comply with acceptable design standards and could be safely accepted by the trustees. I suggested that Mr McCulloch engage Maurice Harris as I had used him previously on an unrelated job and thought he did good work.
[203] Mr Smith’s evidence detailed the steps taken by the
Trust to ensure the necessary remedial work on the
trusses was properly
designed, constructed and overseen by its own agents. Mr Smith said:
34. From the Trust’s perspective, we were concerned to ensure
that the appropriate regulatory and expert approval was
given to the work and
was delivered. From my point of view I was satisfied that Harris’ review
had been thorough, that he
had peer reviewed the design of the truss
modification and found it satisfactory, and that his and Mr Major’s
certificates
were conclusive on that point. Similarly, the Council certified
that the construction, including the community court trusses, complied
with the
New Zealand building code and sent this to the Trust. I, and the other
trustees, had no reason to look behind those certificates
and assurances, and we
believe that we had a stadium which had been properly designed and
constructed.
[204] Mr Smith referred to the stadium’s opening on 25 March
2000 and his assumption that it was accordingly ready
and able for use given
the Trust’s receipt from the Council of 10 interim code compliance
certificates relating to various
discrete aspects of the code, as well as a
building statement of fitness. He concluded by noting that:
37. ... We were at all times reliant on the advice we received from
the contractors and advisers we engaged. When we received the appropriate
assurances and certificates from those experts and from the Council, we relied
on them as establishing
that the building had been properly constructed. That
was especially so because of the scrutiny I knew had been brought to bear
on the
original design mistakes. Accordingly, when the stadium opened, I believe that
the stadium was sound, safe, and compliant
with the relevant conditions.
(Our emphasis.)
[205] In our judgment Mr Smith’s evidence is significant in
confirming the Trust’s
election to open formally and immediately begin using the stadium on 25
March
2000 without obtaining certification for the defective trusses. His evidence confirms that the Trust had engaged the steel fabricator to ensure the remedial work was expertly carried out, as well as Mr Major (who was responsible for issuing the PS4) to inspect the work, ensure compliance with Mr Harris’ remedial design and confirm completion to the Council accordingly. But it decided to open and operate without certificates from the Council for the relevant remedial works. The Trust cannot plausibly assert that it relied on the certificate for the particular purpose of protection from the financial consequences of defects at the time the stadium was opened.
[206] The evidence supports these additional findings on
reliance:
(a) The Trust and its agents were indifferent throughout to compliance with its obligations under the certification process. In particular, after the Council issued the interim certificate of code compliance with the conditions of consent for building work other than the remedial work on 24 March 2000, the Trust lost interest in obtaining the Council’s final certification for amendment 1. The Trust opened and operated the stadium as a public facility for at least six months without obtaining the relevant certificate of code compliance and was apparently content to treat the interim certification process, which excluded the remedial work, as sufficient for its purposes. The Trust took no steps to satisfy the Council’s requisitions subsequent to
25 March 2000. Instead, it was the Council which in fact continually
reminded the Trust of its failure to comply. The Trust’s
request for a
final certificate was simply generated by its desire to satisfy liquor licensing
purposes.
(b) The Trust and the Council did not treat what purported to be the
final certificate as final in fact. Both parties treated
it as a further
interim or pro forma step. The Trust knew of its continuing failure to comply
with the conditions of the building
consent despite the certificate
being issued. And we infer that it did not rely on the document in any
meaningful way. The
Trust then followed the same desultory practices
as before. Contrary to its pleaded case, we are satisfied that the Trust
did
not place any actionable reliance on the certificate but simply treated it as an
immaterial part of a technical continuum.
(c) When applying for the certificate on 1 March 2000, the Trust had wrongly advised that the building work had been completed “to the extent required by [the] building consent ... [for the remedial work]”. Not only was the work not completed to that standard (as the subsequent collapse proved) but the Trust also knew that it had failed continually to satisfy the conditions of consent, including Mr Major’s
obligation to confirm the precamber alignment and provide a PS4 for the
remedial work.
[207] Together these findings of fact lead us to the conclusion that the
Trust did not rely in fact on the Council’s certificate
for the purpose of
avoiding financial loss resulting from the building defects caused by its
agents’ negligence.
Contributory negligence, indemnity and betterment
[208] We add two points on contributory negligence. First, it is
surprising that the Council did not plead a defence of contributory
negligence
relating to the Trust’s claim based on its provision of the certificate.
In the event that the Council was held
to owe a duty of care to the Trust, it
would have been entitled to argue that the Trust contributed substantially to
its own damage
through its agent’s negligence — their fault was
attributable to the Trust on the principles we have earlier discussed.
In
terms of causal potency and relative blameworthiness, which engage the
same factors which we have addressed within
our duty and reliance analysis, the
Trust would have been exposed to a contribution finding in excess of 50 per
cent.
[209] Second, we agree with Miller J for the reasons he gives that, if the
Council was liable, an award of damages should be reduced
by 50 per cent on
account of the Trust’s contributory negligence to its own damage in
2006.173
[210] Finally, in the event that we are wrong on liability, we agree with Miller J that the Council’s claim to contractual indemnity is unsustainable and that the Trust’s cross-appeal against Dunningham J’s allowance for betterment should be
dismissed.174
173 See [140] above.
174 See [141]–[157] above.
Result
[211] For these reasons we agree that the appeal and cross-appeal should be
determined as set out in the judgment of Miller J with
the consequences he has
described.175
Solicitors:
Heaney & Partners, Auckland for Appellant
Young Hunter, Christchurch for
Respondent
175 See [158]–[160] above.