Casata Limited v Minister for Land Information [2024] NZCA 592 (14 November 2024)
Last Updated: 18 November 2024
|
IN THE COURT OF APPEAL OF NEW
ZEALANDI
TE KŌTI PĪRA O AOTEAROA
|
|
|
BETWEEN
|
CASATA LIMITED Appellant
|
|
AND
|
MINISTER FOR LAND INFORMATION Respondent
|
Hearing:
|
7 September 2023
|
Court:
|
Cooper P, Gilbert and Goddard JJ
|
Counsel:
|
J E Hodder KC and G F Dawson for Appellant M J Bryant and K F
Gaskell for Respondent
|
Judgment:
|
14 November 2024 at 11.00 am
|
JUDGMENT OF THE COURT
A The
appeal is dismissed.
- The
appellant must pay the respondent costs for a complex appeal on a band A
basis together with usual disbursements. We do not
award costs in respect of
second
counsel.
____________________________________________________________________
REASONS OF THE COURT
(Given by Cooper P)
Table of Contents
|
Para No
|
Introduction
|
|
Background facts
|
|
Negotiations for acquisition of No 27
|
|
Negotiations for acquisition of No 7
|
|
The additional compensation claim
|
|
The LVT decision
|
|
The High Court
|
|
The argument on appeal
|
|
Proving and quantifying loss sustained during a shadow period
|
|
The sufficiency of evidence proving the loss claimed
|
|
Sections 60(1)(c) and 66
|
|
Analysis
|
|
Section 60(1)(c)
|
|
Section 66
|
|
Result
|
|
Introduction
- [1] This
appeal concerns the proper approach to the assessment of
“full compensation” or “compensation for any disturbance
to [the owner’s land]” under ss 60(1) and 66 of the Public
Works Act 1981 (the Act) when land is acquired for a public
work.
- [2] The
principal issue raised is whether the landowner can claim compensation for loss
attributable to the inhibiting effect of the
proposed acquisition during the
“shadow period” — the time between the announcement of the
proposed public work
for which the land is to be acquired and completion of the
acquisition. It is said that effects of the shadow are properly compensable
whether under s 60(1)(c), for damage arising from the exercise of powers
under the Act, or under s 66, for disturbance to the land.
- [3] The
appellant, Casata Ltd (Casata), contends that the shadow cast by the
announcement of a roading project between the Hutt Valley
and Tawa/Porirua,
the Petone¾Link Road (the Project),
cost it the opportunity to sell or redevelop two properties located at
Pito‑One Road in Petone (referred
to as No 7 and No 27, or together as
the properties). Some three years later, the properties were acquired
under the Act for the
purposes of the Project. The
parties were able to agree on the land value of both properties, but unable to
agree on Casata’s claim for additional compensation
referenced to the
effects of the shadow.
- [4] Casata’s
claim for additional compensation in the sum of $4,232,627 (plus GST if
any) was rejected by the Land Valuation
Tribunal (the
LVT).[1]
It held there was no evidence that the shadow had impaired Casata’s
property rights in respect of the two properties, in particular
its ability to
develop, sell and reinvest. Nor was their evidence to support application of a
hypothetical investment model addressed
in expert evidence called by Casata from
Robert Cameron, a partner at
PwC.[2]
- [5] Casata’s
appeal to the High Court was
dismissed.[3]
While Edwards J considered that, consistently with the requirement that
claimants receive full compensation, a claim for loss sustained
in the shadow
could in principle be advanced under s 60(1)(c) of the Act, such a claim
would necessarily be for actual damage
sustained.[4] On the present facts,
Casata had not proven the shadow had caused it to suffer tangible
loss.[5] The Judge also rejected the
alternative claim advanced by Casata that it could be compensated for
“disturbance” to its
land caused by the shadow under s 66 of
the Act.[6]
- [6] The
Judge subsequently granted an application by Casata for leave to appeal to this
Court under s 18A of the Land Valuation Proceedings
Act
1948.[7] In addressing the issues
raised by the application for leave, the Judge noted that a key ground of the
proposed appeal concerned
the proper approach to the assessment of
loss.[8] She recorded Casata’s
claim that both the LVT and the High Court erred by conflating the question of
whether the shadow caused
Casata loss with a quantification of that loss. This
led both to an erroneous conclusion that Casata had to prove that it would
have pursued the sale and reinvestment
options.[9]
- [7] The Judge
accepted that the approach to the assessment of loss involved a matter of
general principle.[10] Further,
there might “be room for a different view” as to the level of detail
required in proving a claim premised on
the impairment of property rights
generally.[11] In these
circumstances, she considered leave should be granted “to appeal the
entire judgment”, while stating this was
conditional on the principal
ground of appeal concerning the proper approach to proving and quantifying loss
sustained during the
shadow
period.[12] The appeal was
“not to be treated as an opportunity for Casata to re‑run the claim
brought before the [LVT] or presented
on appeal” to the High
Court.[13]
- [8] The
Judge’s approach to the question of leave reflected the provisions of
s 18A of the Land Valuation Proceedings Act, which
required her to
consider whether any question of law or general principle was involved in the
proposed appeal and also enabled her
to grant leave to appeal subject to such
conditions as she thought fit.[14]
We proceed on the basis that the issues engaged by the appeal are matters
of general principle to be addressed in the context of
the compensation claim
advanced by Casata in the LVT.
- [9] On appeal,
Casata seeks judgment in its favour in the sum of $3,670,900. We note that
this is a lower sum than was claimed in
the LVT and High Court, however, Casata
appears to attribute the reduction from the sum claimed to an adjustment
reflecting an additional
payment by the Crown made on 5 February
2021.[15]
Background facts
- [10] Casata’s
core business at the relevant time was commercial property investment, with a
focus on owning land subject to
long‑term ground leases and deriving
income from rental returns and capital gains. It acquired the properties from
the New
Zealand Railways Corporation in 1993. At the time, they were subject to
long‑term ground leases to Transit New Zealand, now
known as the New
Zealand Transport Agency | Waka Kotahi (Waka Kotahi).
- [11] No 27 was
the larger of the properties, being 12,250 m2 in area. Until October
2012, it had been leased to a car sales yard. As at 13 February 2014, the land
had been developed by the
erection of three interconnected warehouse buildings,
classified as earthquake prone by the Hutt City Council. The land was
zoned
“General Business” in the Lower Hutt City District Plan,
which became operative on 24 June 2003. The zoning permitted
a range of
commercial and industrial activities to take place.
- [12] The
property at No 7 was 2,157 m2 in area. Parties agreed this was a
“a bare parcel of land”. It had similar locational attributes to
No 27 and was also
zoned “General Business”. Casata placed the
property on the market in 2011 but withdrew it before again commencing an
active
marketing programme in May 2013. It remained on the market when the Project was
announced in February 2014.
- [13] In a
meeting on 11 February 2014, Waka Kotahi advised Andrew Wall, one of
Casata’s two directors, of the Project and gave
him a letter and a draft
public information pack. The letter stated that Waka Kotahi had been
investigating a transportation link
between the Hutt Valley and Porirua, and
that Casata’s properties had been identified as being potentially directly
affected
by the proposed options for the route. Although planning was in its
early stages, Mr Wall was advised it was hoped there would be
firm land
requirements by mid‑2015 which would enable confirmation of the impact on
Casata’s properties.
- [14] At the 11
February meeting, Mr Wall informed Waka Kotahi representatives that the
buildings on No 27 were earthquake prone and
untenantable. He said that Casata
had plans to construct a new commercial building on that site with a potential
value of $22 million.
Mr Wall stated that Casata would be claiming compensation
for its redevelopment plans having been put “in jeopardy”.
He said
that, if preferable, it would be happy to sell or lease the land to Waka Kotahi.
- [15] Two days
later, on 13 February 2014, the Project was publicly announced and public
consultation commenced. At the High Court,
Casata identified this as the
“causation date”, or the commencement of the shadow
period.[16] At the time, it
appeared to Mr Wall that all of No 27 would be required and only a small part of
No 7. On 1 August 2014, Casata
was sent a project update by Waka Kotahi
advising the preferred option for the route was expected to be confirmed at the
end of 2014.
Resource consent applications would be lodged at the end of 2015.
Detailed design would begin from 2017 and construction, subject
to funding,
would begin in 2019.
- [16] On 10
December 2014, Casata sought an update on progress from Waka Kotahi, which
responded noting that nothing had changed in
terms of the impacts on No 7 and No
27. At that stage, it was anticipated that the consenting process would begin
in late 2015.
Achieving the necessary consents could then take a further year,
but once they were in place, Waka Kotahi would be able to start
conversations
with landowners regarding potential acquisition.
Negotiations for
acquisition of No 27
- [17] On
17 February 2015, Mr Wall met with a representative from Waka Kotahi. Mr Wall
said in evidence that he reiterated the buildings
on No 27 were earthquake
prone, and had to be either strengthened or demolished by December 2018, and
that he considered the best
way forward for Casata was to build new buildings.
He offered Waka Kotahi the choice of buying No 27 at that time for six million
dollars, stating that, if they refused, Casata would proceed with its new
development. In that case, Waka Kotahi would be purchasing
the land and new
buildings for $20 million. According to Mr Wall, Waka Kotahi’s
response was that it would wait until its
processes were finished and that it
would pay $20 million for the land and new buildings if it had to. Mr Wall
stated that this
surprised him but that, in light of this response, Casata
proceeded with its plans for redevelopment.
- [18] On 3
September 2015, Mr Wall emailed Waka Kotahi referring to the 17 February
discussion, and asking whether Waka Kotahi still
intended to wait until its
processes were finished:
At our meeting at your office earlier this
year on 17 February 2015 ... I offered you the choice of either buying the land
now for
$6 million or buying the land later with new buildings on for $20
million. Your response was that [Waka Kotahi] would wait until
its
processes were finished and pay the $20 million. Is that still your
position?
- [19] Mr Wall
advised Waka Kotahi that demolition consent for the buildings on No 27 had
been obtained and that, accordingly, demolition
would start later that month.
Waka Kotahi representatives interpreted Mr Wall’s email of 3 September
2015 as a request that
Waka Kotahi make an advance purchase of No 27 at that
stage. Although the Project remained in the investigation phase and a
designation
or notice of requirement had not been issued, Waka Kotahi decided to
initiate the acquisition process, and on 25 September 2015 appointed
David
Hoffman, a property consultant at The Property Group Ltd (TPG), to
negotiate the acquisition of No 27 on its behalf.
- [20] On 20
October 2015, there was a meeting between Mr Wall and Mr Hoffmann to discuss the
acquisition. Mr Wall advised Mr Hoffman
that he had redevelopment plans for No
27. Mr Hoffman stated that, given the parties were now in negotiations for an
advance purchase,
Waka Kotahi expected the acquisition would be of a vacant
site at current market value and that the parties would negotiate in good
faith.
- [21] Casata
commenced demolition of the buildings at No 27 in October 2015 with practical
completion achieved in early November 2015.
Demolition costs exceeded $200,000.
A resource consent application for the development of No 27 was lodged on
24 November 2015 and
the consent was granted on 1 February 2016.
- [22] In November
2015, Waka Kotahi announced its preferred route for the Petone‑Grenada
Link Road. On 11 November 2015, Mr
Hoffman reiterated the steps necessary to
agree on compensation to Mr Wall, the first being obtaining formal valuations of
the land.
Mr Wall wrote in reply on 19 November, noting that the redevelopment
of No 27 was at an advanced stage, and stating:
Casata Limited is a
commercial property investor. It had leased the property to the Car Giant
however that business failed and the
lease was subsequently terminated. The
collection of interlocking buildings were classified by the Hutt City Council as
earthquake
prone and were required to be either demolished or strengthened by 31
December 2018. The design of the buildings no longer suits
the needs of
commercial tenants and in any event tenants [are] not prepared to lease
earthquake prone buildings. In the absence
of any clear direction by [Waka
Kotahi], Casata decided at the beginning of this year to redevelop the site and
the former buildings
have since been demolished in preparation for the
construction of a new building.
... We approached [Waka Kotahi] with the suggestion that whilst it makes
very good commercial sense for Casata to redevelop the site
it does not make
very good commercial sense for [Waka Kotahi] to pay $20 million for a new
building which they then have to demolish
to make way for the interchange.
With respect to the acquisition of land I note your statement that the basic
entitlement to compensation is the current market value
of the property. Given
that redevelopment is at an advance state, the value is significantly more than
vacant land value. How do
you suggest that we address this, should it be an
equitable % of the end project value as there are benefits to both parties.
...
On 30 November, Mr Hoffman sought details of Casata’s development plans
which he suggested could be provided to the respective
valuers.
- [23] On 14
December 2015, Waka Kotahi received an independent market
valuation of No 27 that it had commissioned
from Martin Veale
of TelferYoung (Wellington) Ltd. On the same day,
Mr Hoffman emailed Mr Wall stating that negotiations for No 27 were
taking place
under the Act, and again recommending that Casata seek valuation
advice. He requested that Casata confirm it had discontinued incurring
costs in
its redevelopment of No 27 as they may not be recoverable.
- [24] On 22
December 2015, Mr Wall responded stating that Casata was in the business of
creating long‑term rental streams and
confirming that it was continuing
with the redevelopment as planned. Mr Wall asserted that there was no legal
impediment preventing
Casata from constructing the building as far as he was
aware, but if there was, then he should be advised immediately.
- [25] On 19
January 2016, Mr Hoffman emailed Mr Wall reiterating that the parties were
negotiating with a view to reaching agreement
under s 17 of the Act, the
only statutory authority for the purchase. He noted it did not appear
reasonable that Casata would continue
with plans for development on the land
when there was a high likelihood that the development would never be completed.
He said that
a notice of desire under s 18 of the Act had been requested
from the Minister for Land Information (the Minister) for service
on
Casata.[17] Mr Hoffman said this
was necessary due to Casata’s apparent intention to carry out works on the
land with the purpose and
effect of rendering the Project more costly. This
created a need for agreement on what the current potential and market value of
the land was. He again asked Casata for confirmation it had suspended
development works.
- [26] On 25
February 2016, Mr Wall advised that Casata had suspended redevelopment of No 27.
He provided a “redevelopment information
package”, including a
statement that the former buildings had been demolished, a resource consent for
the new building had
been issued, and engineering service reports. Mr Wall
also said there was a tenant for the development and the Project was
cash
funded. The subsequent provision of this information to Mr Veale did
not change his valuation in the absence of documentation supporting
the
existence of the purported lease.
- [27] Casata’s
valuation for No 27, prepared by Michael Horsley of Colliers International
(Wellington) Ltd (Colliers), was forwarded
to Waka Kotahi in August 2016.
A further updated valuation from a different valuer was forwarded in November
2016. Mr Veale provided
an updated valuation for No 27 on 8 December 2016.
- [28] The
agreement for an advance purchase of No 27 was signed on 16 February 2017. The
agreement was for $5,350,000 plus GST (if
any). Settlement occurred on
28 February 2017, the property transferring to the Crown on that date. The
valuers agreed the market
valuation for No 27 as at February 2017 was $5,665,000
plus GST (if any). An additional sum of $315,000 was also agreed and paid
to
Casata in February 2021.
Negotiations for acquisition of No 7
- [29] In
March 2016, Mr Wall emailed Mr Hoffman advising that two parties were interested
in purchasing No 7. Given Waka Kotahi’s
intention to buy the land, Casata
took the view it could not deal with those parties in good faith. The offers
indicated a market
value for the land of $950,000 to $985,000.
- [30] Negotiations
for an advance purchase of No 7 commenced two months later with valuations being
exchanged in May 2016. The parties
reached agreement in principle to a value of
$990,000 plus GST (being the figure nominated in the valuation prepared by
Colliers).
- [31] On 30 May
2016, Casata executed a nine‑year lease of No 7 with Safe Scaffolding
Ltd. On 23 June 2016, Casata advised Waka
Kotahi that it had received an offer
for No 7 for $990,000 plus GST. On 11 July 2016, Casata sought assurances from
Waka Kotahi
that if the land was sold to the interested party, a s 18
notice would not be issued, therefore allowing the interested party to
redevelop
the land. Waka Kotahi declined to provide the assurances sought.
- [32] An advance
compensation agreement for No 7 was signed on 17 March 2017, with
settlement taking place on 27 March 2017. The agreement
provided for
compensation in the sum of $990,000 plus GST (if any) and was subject to the
existing lease.
The additional compensation claim
- [33] Both
advance compensation agreements were without prejudice to Casata’s rights
to claim compensation for additional losses
it said it had suffered during the
shadow period. Ongoing correspondence did not resolve the issues and, on
8 August 2018, Casata
served a notice of claim for compensation on the
Minister. Legal proceedings were filed on 28 September 2018.
- [34] For present
purposes, it is convenient to treat both properties as subject to the shadow for
a period of approximately three
years. Casata claims that it was prevented from
maximising its returns from the capital invested in the properties —
during
the shadow period, it was effectively unable to either invest in the
development of the land or sell the land and reinvest elsewhere.
Casata’s
claim for additional compensation for the incremental impact of the shadow is
$585,798 for No 7 and $3,085,102 for
No 27.[18] The claim was based
on the hypothetical reinvestment model addressed by Mr Cameron in evidence
to the LVT. Mr Cameron was a registered
valuer, a fellow of the New
Zealand Institute of Valuers and a member of the Royal Institute of
Chartered Surveyors. It is unnecessary
to set out the detail of his calculation
of the amounts claimed as additional compensation.
- [35] Mr
Cameron’s approach to loss as he described it was that:
- As
a consequence of the notice, Casata’s property rights were effectively
suspended, and it could not continue with its development
plans for
27 Pito‑One Road (and generate rental from that investment), or
alternatively sell that land, nor could it sell 7
Pito‑One Road (and
acquire other property assets from which it could generate rental and capital
appreciation).
- [36] Concerning
No 27, he stated that:
- I
have considered the compensation claim on a basis whereby Casata could have sold
the land at the Notice Date and reinvested the
funds into either direct or
indirect real estate, generating either a rental or distribution return.
- I
refer to this as the reinvestment approach and it addresses the total return
from property, comprising income returns (in this case,
the rental or
distribution returns) and capital returns (change in market
value).
...
- In
addition to the business loss, which I have described above, the compensation
claim includes the market value of the site (adjusted
for the capital gain
foregone in respect of the hypothetical alternative investment) as at the
Settlement Date. By this I mean that
had Casata been able to complete its
development, or sell and reinvest in other real estate assets it would have
benefited from an
increase in the value of its assets. During the period from
the Notice Date to the Settlement Date there was an increase in land
values,
market rentals and a firming of capitalisation rates. This resulted
in significant capital appreciation.
- [37] As to No 7,
he said that:
- The
full compensation for 7 Pito‑One Road can also be assessed using the
reinvestment approach as detailed above. However,
in this case an
off‑setting allowance has to be made for the interim rental income from a
short term lease of the land.
- [38] Waka Kotahi
called William Apps, a chartered accountant and director of Staples Rodway
Corporate Finance Ltd, with expertise
in corporate finance and business
valuation and the measurement of economic loss.
- [39] Mr Apps
considered Mr Cameron’s approach to assessing loss was not
“necessarily the only or best way of assessing
quantum”. He
disputed Mr Cameron’s methodology on the basis it resulted in a claim
for additional compensation which
represented 80 per cent of the value of the
underlying assets as at the date of the announcement of the Project and 73 per
cent of
the value of the advance sums paid to the purchase of the land. He was
sceptical of the magnitude of those sums compared to the
value of the land
itself. He was also critical of, amongst other things, the apparent assumptions
in Mr Cameron’s reinvestment
model that, on the date the Project was
announced, there was an immediate entitlement to compensation at unaffected
market value,
and that the proceeds of sale were received on the same date and
immediately able to be reinvested into tenanted properties.
- [40] The method
which Mr Apps believed to be most appropriate was the traditional “but
for” assessment of loss, which
would apply to the properties as
follows:
(a) For No 27, if Casata’s intention was to develop, tenant and sell the
property, the appropriate measure of loss was:
... the present value of the net proceeds from constructing, tenanting and
selling the properties discounted at a rate that reflects
the time value of
money and the risk inherent in the development and ultimate sale of the
property.
(b) For No 7, to the extent the property was in the process of being sold, the
appropriate measure of loss was “the difference
between market values at
the settlement date and the amount compensated”.
In respect of No 27, he was unable to calculate the loss incurred using this
method due to insufficient evidence.
- [41] In the
event Mr Cameron’s approach was adopted, Mr Apps considered a number of
adjustments needed to be made which would
have the effect of reducing the amount
payable by the Crown by $1,250,501.
The LVT decision
- [42] The
LVT declined Casata’s claim for additional compensation.
- [43] The LVT
considered that the outcome of the proceedings turned upon the resolution of two
factual issues. First, whether the
shadow actually interfered with
Casata’s dealing with the properties in the manner claimed, and second
whether Casata actually
suffered the alternative investment loss calculated by
Mr Cameron.[19]
- [44] Turning
first to No 7, the LVT was not satisfied as a matter of fact that there was any
potential sale of No 7 to a party (other
than the Crown) that had been
precluded, prejudiced or upset by the shadow prior to Waka Kotahi signalling its
intention to acquire
the
property.[20]
- [45] As to
No 27, the LVT found that, even if Casata had been able to pursue its
redevelopment proposal unencumbered by announcement
of the Project, the
development could not have been undertaken before about October or
November 2015. There was no potential sale
or reinvestment during the
intervening period because Casata had never sought to do
that.[21]
- [46] On the
second factual issue, the LVT was not persuaded by Casata’s claim that, if
the Crown had acquired the properties
for their market value within four months
of announcement, Casata could have taken the capital thereby released and
reinvested it
in the property market, earning both a market rental income and a
capital gain which would have resulted in “full
compensation”.[22] While the
LVT accepted that could have happened, Casata’s evidence did not establish
it would have done so. It followed that
the loss scenario advanced by Casata
was “hypothetical in every sense of that word”, and indeed had been
so described
by Mr Cameron in his
assessment.[23]
- [47] The LVT
also concluded there was no evidence that, between February 2014 and the
confirmation of Waka Kotahi’s intention
to acquire the properties, Casata
had turned its mind to an alternative investment as hypothesised by Mr
Cameron.[24] Nor was there evidence
that such an alternative investment property with the features identified by Mr
Cameron for the purposes
of his calculations was available for purchase by
Casata between mid‑June 2014 (four months after the announcement of the
Project)
and confirmation of Waka Kotahi’s intention to acquire the
properties.
Rather:[25]
The only
information before the [LVT] on that subject is Collier’s email of
5 February 2016 to Mr Wall, describing the increasing
scarcity of
industrial land in the lower valley at that time.
- [48] For those
reasons, the LVT was not satisfied that Casata actually suffered the alternative
investment loss that formed the basis
of its
claim.[26]
- [49] In
conclusion, the LVT held the appropriate basis for assessing loss was
determination of the “actual loss” suffered
by Casata. It was not
satisfied that Casata actually
lost:[27]
- The opportunity
to sell No 7 and invest the proceeds of sale in an alternative investment ...
;
- The opportunity
to sell No 27 and invest the proceeds of sale in an alternative investment ... ;
- The opportunity
to purchase an alternative investment property bearing the features identified
in Mr Cameron’s calculations
of loss.
The High
Court
- [50] In
essence, the Judge held that it was insufficient to simply rely on the existence
of a shadow in making a claim for compensation.
Casata had to prove its loss.
Calculations of loss, even on a hypothetical counterfactual, were to be bound by
the realities of
what would have happened but for the threat of
acquisition.[28]
- [51] The Judge
considered that:
(a) Casata was required to particularise and quantify its claim — ease of
calculation could not lead to the adoption of a model
that is removed from the
harm or damage alleged.[29]
(b) The relevant counterfactual for the assessment of loss is what would
have happened but for the effect of the shadow, not what could have
happened.[30]
(c) Casata had to prove that its ownership rights had been impaired in fact, and
that loss flowing from that impairment was not unreasonable
nor too
remote.[31]
- [52] The Judge
held there was insufficient evidence to substantiate Casata’s
counterfactual and this was a sufficient basis
to dispose of the
appeal.[32] She nevertheless
proceeded to deal with the point of principle underlying Casata’s claim,
holding that s 60(1)(c) could found
a claim for loss sustained during the
shadow period: “[a]s a matter of broad principle” such a claim
would be “consistent
with the requirement that claimants receive full
compensation and the principle of equivalence which underpins the
[Act]”.[33] However, such a
claim would be difficult to prove. And if, as in this case, the claim is
“closely associated with the taking
of land and market value for that land
has already been paid, it may be more difficult to bring it within
s 60(1)(c)”.[34] She
observed:[35]
The scheme
of the Act is that compensation for the taking of land is fixed as at the date
of acquisition and according to the market
value of the land. It strains plain
meaning to suggest that the Act provides for compensation to be paid for a
delayed taking, particularly
if there has been an increase in market values in
the interim.
- [53] She
considered that whether a claim for loss in the shadow period could be sustained
would depend on the nature of the alleged
impact and associated loss. The
claims sustained in cases to which she referred, including Director of
Buildings and Lands v Shun Fung Ironworks Ltd, Cockburn v Minister of
Works and Development, Pattle v Secretary of State for Transport and
Hamilton v Minister of Lands, were to be understood in that
light.[36]
It followed that any compensation to be paid under s 60(1)(c) must be for
actual damage sustained. Casata’s inability to prove
that the shadow
caused it to suffer tangible loss meant that “an assessment of whether the
claim would otherwise have fallen
within s 60(1)(c) [could not] be
made”.[37]
- [54] As
noted previously, the Judge also concluded that Casata’s claims did not
fall within the definition of “disturbance
costs” for the
purposes of s 66 of the Act. She characterised that section as being
related to “downstream flow on effects”
not related directly to the
value of the property acquired by the
Crown.[38]
Casata’s claim for business losses was, however, essentially
“intertwined” with the value of the land, being for
losses said to
arise from an inability to extract value from the land by either selling it
prior to the acquisition or redeveloping
it.[39] Further, the kinds of loss
that Casata sought to recover did not fit into the language used in
s 66(1)(a). On their face, they
were not costs arising from the
disturbance of the land.[40]
The argument on appeal
- [55] The
parties directed their arguments to the same three issues, being:
(a) whether the High Court erred in identifying the proper approach to proving
and quantifying loss sustained by the appellant as
the owner of undeveloped
commercial land by reason of a “shadow” effect;
(b) if the answer to (a) is yes, whether the High Court erred in concluding that
the appellant had provided insufficient evidence
to prove the loss claimed; and
(c) if the answer to (b) is also yes, whether the High Court erred in concluding
that the appellant’s claim was not within
ss 60(1)(c) and 66 of
the Act.
Proving and quantifying loss sustained during a shadow period
- [56] Mr
Hodder KC for Casata referred to the fundamental common law right not to be
deprived of property without
compensation,[41] which he submitted
was the foundation and context for the Act’s provisions on compulsory
acquisition of land for public works
and “full compensation” for the
owner of land so acquired.[42]
Casata had in fact suffered damage by reason of public announcement of Waka
Kotahi’s proposal for the Project. The commencement
of the shadow
period meant that its property rights were effectively suspended: Casata was
not able to invest in the development
of its properties, nor could it sell the
properties and reinvest in other land.
- [57] Mr Hodder
submitted that the requirement for full compensation means, in accordance with
this Court’s decision in Drower v Minister of Works and
Development, that the owner must be paid “the complete equivalent of
that which has been taken away from him” — the entitlement
“must not be whittled down in any
respect”.[43] And, as this
Court said in Ace Developments Ltd v Attorney‑General, a claimant
“has the right to be put, so far as money can do it, in the same position
as if their land had not been
taken”.[44]
Mr Hodder encapsulated the required approach by referring to the
“principle of equivalence”, a phrase used by Lord Nicholls
in
delivering the judgment of the Privy Council in Shun
Fung.[45]
- [58] Mr Hodder
submitted that the reinvestment model adopted by Mr Cameron was more
appropriate than that of Mr Apps, as Casata’s
property rights were
effectively suspended by the commencement of the shadow period. Public
notification of a public work which
will require the acquisition of land casts
an immediate shadow on dealings with the relevant land, as no current or future
owner
of that land can reliably utilise it for its highest and best use. As a
consequence, Casata’s claim necessarily involved a
hypothetical
counterfactual scenario that it had retained the options to either sell or
redevelop the properties. The purpose of
the counterfactual was to objectively
identify the scope of loss.
The sufficiency of evidence proving
the loss claimed
- [59] Mr
Hodder submitted that it was not necessary for Casata to produce evidence that
it had a preference for sale or reinvestment,
or to speculate whether either
preference would have eventuated. It was not appropriate to engage in a
factual analysis, as the LVT had done: what was required was a
counterfactual analysis. The shadow immediately prevented Casata
from being able to exercise its property rights in normal market conditions, as
the market incentive for purchasers and developers was gone. The High
Court’s focus on “actual loss” and proof
of “what
would have happened” failed to recognise the factual threat of
acquisition meant that all analyses were required to engage with a
hypothetical
counterfactual.
- [60] The
counterfactual requires assuming away the constraints on Casata’s ability
to exercise of its options during the shadow
period, and this is the relevant
loss. Casata had listed No 7 for sale in 2014 and had general intentions to
sell and redevelop
No 27. The shadow immediately prevented Casata from
being able to exercise its property rights in normal market conditions.
Sections 60(1)(c) and 66
- [61] Mr
Hodder noted that the existence of a shadow period has been recognised by the
High Court, in accordance with the judgment
of the Privy Council in
Shun Fung,[46]
and this Court’s approach in
Cockburn.[47]
- [62] With
respect to s 60(1)(c), Mr Hodder argued it is not limited to the market
value of the land. “[L]and” includes
any estate or interest in
land,[48] reflecting the bundle of
rights involved in land ownership. Mr Hodder submitted Casata’s rights in
land did suffer damage
in terms of s 60(1)(c) by reason of the commencement
and implementation of the statutory processes.
- [63] Section
66(1) provides for compensation for “any disturbance to [the
owner’s] land” taken or acquired under
the Act. Mr Hodder submitted
this type of loss was held recoverable in Shun Fung so long as it was
reasonable and not too remote.[49]
The claim upheld in that case was for lost rental during a shadow period when
pre‑acquisition negotiations with the Crown
rendered the land
untenantable. Casata said that s 66 should be liberally and purposively
interpreted to give effect to the Act’s
core purpose of full and fair
compensation where a landowner’s rights are disturbed by the Act’s
processes.
Analysis
- [64] We
start by setting out the relevant provisions of the Act, beginning with
s 60(1) which provides as
follows:[50]
60 Basic
entitlement to compensation
(1) Where under this Act any land—
(a) is acquired or taken for any public work; or
(b) suffers any injurious affection resulting from the acquisition or taking of
any other land of the owner for any public work;
or
(c) suffers any damage from the exercise (whether proper or improper and whether
normal or excessive) of—
(i) any power under this Act; or
(ii) any power which relates to a public work and is contained in any other
Act—
and no other provision is made under this or any other Act for compensation
for that acquisition, taking, injurious affection, or
damage, the owner of that
land shall be entitled to full compensation from the Crown (acting
through the Minister) or local authority, as the case may be, for such
acquisition, taking, injurious affection,
or damage.
...
- [65] Section 62
deals with the assessment of the amount of compensation payable under the Act.
The section relevantly provides:
62 Assessment of compensation
(1) The amount of compensation payable under this Act, whether for land
taken, land injuriously affected, or otherwise, shall be assessed
in accordance
with the following provisions:
(a) subject to the provisions of sections 72 to 76, no allowance shall be made
on account of the taking of any land being compulsory:
(b) the value of land shall, except as otherwise provided, be taken to be that
amount which the land if sold in the open market by
a willing seller to a
willing buyer on the specified date might be expected to realise, unless—
(i) the assessment of compensation relates to any matter which is not directly
based on the value of land and in respect of which
a right to compensation is
conferred under this or any other Act; or
(ii) only part of the land of an owner is taken or acquired under this Act and
that part is of a size, shape, or nature for which
there is no general demand or
market, in which case the compensation for such land and the injurious affection
caused by such taking
or acquisition may be assessed by determining the market
value of the whole of the owner’s land and deducting from it the market
value of the balance of the owner’s land after the taking or acquisition:
(c) where the value of the land taken for any public work has, on or before the
specified date, been increased or reduced by the
work or the prospect of the
work, the amount of that increase or reduction shall not be taken into account:
...
(2) In this section, the term specified date means—
(a) in the case of any claim in respect of land of the claimant which has been
taken pursuant to section 26, the date on which the
land became vested in the
Crown or in the local authority, as the case may be:
...
- [66] As
discussed, Mr Hodder also argued that compensation for the effect of the shadow
was within the ambit of s 66 which provides
for disturbance payments.
Section 66 relevantly provides:
66 Disturbance payments
(1) Subject to subsection (2), the owner of any land taken or acquired under
this Act for a public work shall be entitled to recover
compensation for any
disturbance to his land and in particular to recover, where appropriate,—
(a) all reasonable costs incurred by him in moving from the land taken or
acquired to other land acquired by him in substitution
for the land taken or
acquired, including—
...
(ii) the reasonable valuation and legal fees or costs incurred in respect of the
land taken or acquired:
(iii) the reasonable valuation and legal fees or costs incurred in respect of
the land acquired in substitution, but not exceeding
the reasonable valuation
and legal fees or costs which would be incurred in respect of land with a market
value equal to the land
taken or acquired:
(iv) the actual and reasonable costs incurred by him in transporting his goods
and chattels and those of his family from the land
taken or acquired to the land
acquired in substitution, but not exceeding the reasonable costs of such
transport by road over a distance
of 80 kilometres, or such greater distance as
is necessary to reach the nearest land that reasonably could have been acquired
in
substitution:
(b) an allowance for any improvements not readily removable from the land taken
or acquired which are of particular use to a disabled
owner or any disabled
member of an owner’s family and which are not reflected in the market
value of the land.
...
- [67] We consider
the outcome of the appeal turns on whether the loss Casata alleges is
compensable under the Act. First, we assess
the claim for “full
compensation” under s 60(1)(c). We then assess the claim for
“compensation for any disturbance
to [the owner’s land]” under
s 66. For the reasons we give, we dismiss the appeal.
Section 60(1)(c)
- [68] Mr
Hodder’s argument that Casata’s rights in land suffered
“damage” in terms of s 60(1)(c) was based
on the effect of the
shadow and the statutory process to publicise and implement the Project. Casata
identifies the announcement
date, 13 February 2014, as the commencement of
the shadow period and the date its rights in land began to suffer
“damage”.
- [69] We consider
there are two defects with this argument:
(a) The statutory entitlement to compensation in
s 60(1)(c) requires the identification of a relevant statutory power, the
exercise
of which has given rise to damage. It is only where the exercise of
such a power has caused land to suffer damage that compensation
is payable for
that damage.
(b) In our view, the natural and ordinary meaning of the phrase “any land
... [s]uffers any damage” as it appears in
s 60(1)(c) requires physical interference with
the land: that is, something that affects the land itself.
The statutory entitlement to compensation
- [70] Mr Hodder
did not point to the exercise of a particular power in the Act on the date the
shadow period commenced.[51] Nor
did he refer to the exercise of a power under any other Act which marked the
commencement of the shadow
period.[52] The announcement of a
project that will require the acquisition of land may well result in a shadow
effect of the kind recognised
in Shun Fung. But such an announcement
will not of itself constitute the exercise of a statutory power whether under
the Public Works Act or
any other Act. In fact, it is clear that when the
Project was announced the land acquisition requirements had not been the subject
of any final decision.
- [71] That is not
to say that the announcement of a project could never affect the desirability of
a property for potential purchasers,
or development plans which might have been
under consideration before the announcement of a project. But, for
s 60(1)(c) to apply,
it is necessary to point to the exercise of a relevant
statutory power: it is only where the exercise of such a power has caused
land
to suffer damage that compensation is payable for the damage. Statutory powers
that might result in such damage include s 27,
which provides for
circumstances under which natural material on land may be acquired or taken for
public work; and s 173, which
permits land to be temporarily occupied and
used for the purpose of constructing, reconstructing, or repairing a
railway.[53]
- [72] The
decision of the Privy Council in Shun Fung does not lead to a different
conclusion.[54] In that case, a
compensation claim was made by a company for losses it had incurred between
notification of the possibility of resumption,
and the date of resumption
itself. Although Lord Nicholls concluded such compensation could be
recovered,[55] we consider this
finding is limited to the facts of that case and the Crown Lands
Resumption Ordinance (HK) (the
Ordinance).[56]
- [73] The
claimant had operated a “mini‑mill” business in Hong Kong. In
November 1981, the government advised the
company claimant that it intended
to develop the area in which the business operated and that the land would be
resumed by the government
under the Ordinance. It was not until October 1985
that the Governor made an order that the claimant’s land was required for
a public purpose, fixing 30 July 1986 as the date of resumption. The
claimant was unable to obtain another suitable site prior to
that date and
consequently closed down its business. The claimant’s company lost
not only the land and buildings but also
its plant, machinery, business and the
profits which the business could have been expected to produce.
- Mr
Hodder relied on a number of statements of principle in the judgment of
Lord Nicholls, including his discussion of the purpose
of the provisions
providing for compensation in both Hong Kong and the United
Kingdom.[57] The purpose of such
provisions, Lord Nicholls said, was to provide fair compensation for a
claimant whose land has been compulsorily
taken, sometimes described as the
“principle of
equivalence”.[58] Under this
principle, a claimant landowner is entitled to be compensated “fairly and
fully” for loss attributable to
the taking of the
land.[59]
- [75] Mr Hodder
placed particular reliance on what was said about a claim advanced for the loss
of profits during the “shadow
period”. Lord Nicholls referred to
the “paralysing effect on the claimant’s operations” after it
received
the letter from the government in November
1981.[60] The possibility that the
claimant’s site might be resumed at some indefinite date became generally
known and customers became
unwilling to enter into long‑term forward
contracts. The company itself had reasonably decided in June 1982 that it would
not enter into contracts exceeding six months’ duration. Between
November 1981 to January 1987, while operating as well as
it could under the
threat of resumption, the company suffered financially to the extent of over $18
million, that being the difference
between the losses the claimant made in fact
and the profits or reduced losses it would have made in that period but for the
threat
of resumption.[61]
- [76] The Privy
Council held that the proper approach was to recognise that losses incurred in
anticipation of resumption and because
of its threat were to be regarded as
losses caused by the resumption as much as losses arising after resumption took
place. Lord
Nicholls
wrote:[62]
A loss
sustained post‑scheme and pre‑resumption will not fail for lack of
causal connection by reason only that the loss
arose before resumption, provided
it arose in anticipation of resumption and because of the threat which
resumption presented. In
the terms of the Resumption Ordinance, a
pre‑resumption loss which satisfies these criteria is as much “due
to”
the resumption of the land as a post-resumption loss.
And later:[63]
... [A]t the outset of a shadow period, there may be no certainty that
resumption will take place. As time passes, and the scheme
proceeds, the
likelihood of resumption increases, until the Governor makes a resumption order.
At that stage, but not before, there
is a legal commitment. Their Lordships can
see no sound reason for attempting to draw a spurious line somewhere along this
penumbra
of gradually darkening shadow.
- [77] We accept
Mr Hodder’s basic proposition that the shadow period following the
announcement of a project that will be advanced
by means of compulsory
acquisition under the Act will have an effect on a landowner’s ability to
deal with the land likely
to be acquired for the purposes of the work. During
this shadow period principles such as those discussed in Shun Fung are
likely to give appropriate guidance to the assessment of compensation properly
payable under the Act.[64]
- [78] However,
the relevant aspect of the claim in Shun Fung turned on whether a loss
occurring before resumption could be regarded, for compensation purposes,
as a loss occurring as a result of the resumption. This was because of
the specific wording of the provision under which the claim was made —
s 10(2)(d) of the
Ordinance:[65]
10.
Determination by Tribunal of compensation payable by Crown
(1) The Tribunal shall determine the amount of compensation (if any) payable
in respect of a claim submitted to it under section
6(3) or 8(2) on the basis of
the loss or damage suffered by the claimant due to the resumption of the
land specified in the claim.
(2) The Tribunal shall determine the compensation (if any) payable under
subsection (1) on the basis of—
...
(d) the amount of loss or damage to a business conducted by a claimant at the
date of resumption on the land resumed or in any building
erected thereon, due
to the removal of the business from that land or building as a result of the
resumption;
...
The loss claimed was “loss or damage suffered [as a result of
the resumption] by the claimant” to be determined on the basis of
“the amount of loss or damage to a business”. There are thus
two key distinctions between this provision and the New Zealand equivalent.
- [79] First, the
Ordinance provides for compensation for loss to the claimant which is due to the
resumption of land — distinctly
broader from that which is compensable
under s 60(1)(c) of the New Zealand Act, which must be damage to
land caused by the exercise of a relevant statutory power.
- [80] Second,
compensation was claimed under s 10(2)(d) of the Ordinance — to be
determined on the basis of the amount of loss
or damage to a business. In
New Zealand, a claim for compensation for business loss would be made under
s 68 of the Act. Such claims
may include claims for business loss
resulting from relocation of the business made necessary by the compulsory
acquisition, or loss
of the goodwill of any such
business.[66] We see no reason why,
in an appropriate case, a claim could not encompass actual business losses
sustained as a result of the announcement
of a proposed public work or at least
sustained following service of a notice of intention to acquire. There would,
of course, need
to be proper evidence establishing what such losses were. But
this is not such a case.
- [81] The
difficulty that Casata faces here is that its claim has been made under a
provision directed to compensating damage to land
and not business loss. In
such a case, for reasons we will explain below, compensation is limited (with
specified exceptions) to
the value of the land, which includes its value as a
commodity which might have been developed and/or sold but for the announcement
of the Project, because any effect of the prospect of the public work is put to
one side for the purposes of the valuation
exercise.[67]
Damage to
land
- [82] We consider
it is clear from the drafting of s 60(1) that its successive paragraphs
contemplate compensation for particular and
different kinds of loss. Paragraph
(a) refers to land being acquired or taken; para (b) relates to
injurious affection to land resulting from the acquisition or taking of
any other land of the owner; and para (c) refers to damage to land from
the exercise of statutory powers.
- [83] When
s 62(1) commences with reference to compensation payable “whether for
land taken, land injuriously affected, or otherwise,”
we consider it must
be read as referring to the different kinds of entitlement to compensation set
out in s 60(1). The compensation
will be for the value of land
acquired, or for injurious effects on other land retained by the owner, or for
physical damage to land
arising from the exercise of statutory powers. The last
of these comes within s 62’s reference to “otherwise”.
We do not consider the word creates a free‑ranging basis for compensation:
it is about the assessment of the amount of compensation
for entitlements to
compensation already set out in s 60(1)(c).
- [84] The effects
of the shadow relied on as causing damage to Casata’s “rights in
land” are essentially inhibitions
on what the owner may do with the land
to realise its potential, whether by sale or development. Even if the
announcement could
somehow be said to arise from the exercise of a statutory
power, we do not see how its effect could be said to amount to damage to
land as
opposed to damage to the owner or the owner’s business.
- [85] We
reiterate our view that the natural and ordinary meaning of “any
damage” in the phrase “any land ... [s]uffers
any damage” is
physical damage or something that affects the land itself. We are not persuaded
that, in this context, it extends
to the kinds of inhibition which Casata
contends affected its rights to sell and reinvest the proceeds and/or retain and
develop
the land.
- [86] “[L]and”,
as defined in the Act, includes “any estate or interest in
land”.[68] Mr Hodder
submitted, relying on a 1991 decision of the LVT, that this definition included
“notional aspects of land other
than the physical land
itself”.[69] However, we note
that this statement was made by the LVT in the context of assessing a claim
under s 63 for compensation in relation
to a reduction in value of the
claimant’s land arising from a “change of land drainage and
hazards”.[70] The LVT was
concerned with the meaning of “injurious affection to land” in the
context of a claim based on the adverse
effects of the reconstruction of part of
a road on land adjacent to the claimant’s property. Section 63 provides
compensation
for injurious affection where no land is taken and the owner
continues in occupation. The rationale of the section is not appropriately
applied in cases where the land is taken and any effects on value of the
prospect of the public work are required to be set to one
side.[71]
- [87] Our view
that s 60(1)(c) requires a physical interference with land is consistent
with what was held in Superior Lands Ltd
v Wellington City Corp.[72]
In that case, Superior Lands Ltd owned an extensive area of land in Johnsonville
which it sought to subdivide in accordance with
its residential zoning. In
1968, it submitted a scheme plan to the Wellington City Council, which refused
its approval on the basis
that the land was part of an area that it wished to
designate for the purposes of a municipal rubbish tip. The Council had
initiated
the process of trying to designate the land for that purpose, but
eventually abandoned the proposal. Consent to the subdivision
plan was obtained
in 1971 from the Town and Country Planning Appeal Board. Superior Lands
then lodged a claim for compensation for
damage suffered by it as a consequence
of the land lying idle due to the Council’s refusal of consent. Beattie
J, sitting
in the then Supreme Court, determined that compensation was not
payable under s 166 of the Municipal Corporations Act
1954,[73] which
provided:[74]
166. Every
person having any estate or interest in any lands taken under the authority of
this Act for any public work, or injuriously
affected thereby, or suffering any
damage from the exercise of any of the powers hereby given, shall be entitled to
full compensation
... determined in the manner provided by the Public Works Act
1928.
- [88] Superior
Lands appealed. After reviewing various authorities, this Court held that the
damage referred to in the section must
result from an act of physical
interference.[75]
Writing for the Court, Richmond J
said:[76]
Although
s 166 provides for compensation not only for the taking of land for a
public work but also for land injuriously affected
by a public work and for
damage done in the exercise of the powers given by the Act it is in our opinion
clear that both the two latter cases refer only to injurious affection or
damage caused by “a physical interference with some right, public
or private, which the owners [or occupiers] of property are by law entitled to
make use of in
connection with such property”.
- [89] This
approach was based on the long line of English authorities discussed by this
Court in Strongman Electric Supply Co Ltd v Thames Valley Electric Power
Board and said to have been consistently applied in New Zealand under the
Act.[77] To similar effect are the
observations of Lord Wilberforce in Argyle Motors
(Birkenhead) Ltd v Birkenhead Corp, discussing the
entitlement to compensation for land taken or injuriously affected, set out in
s 68 of the Land Clauses Consolidation
Act 1845
(UK):[78]
... [B]y a
series of judicial observations of high authority it is well established that
the only compensation which can be obtained
under this section is “in
respect of ... lands,” i.e., in respect of some loss of value of land, or
... in respect of
some damage to lands, and that compensation cannot be
obtained for any loss which is personal to the owner, or which is related to
some particular user
of the land.
- [90] This is
consistent with this Court’s approach to s 42 of the Public Works Act
1928 in Strongman Electric Supply and Superior
Lands.[79] Compensation relates
to the land, not the owner or the owner’s business
model.[80] This is made plain in
the 1981 Act’s expression of the “[b]asic entitlement to
compensation” in s 60, arising
where land is acquired or
taken, suffers any injurious affection, or suffers any damage.
- [91] There is no
suggestion in the parliamentary materials that the 1981 Act was intended to
change the long‑standing approach
that, where there is to be compensation
for damage, the damage must be physical interference to the land.
- [92] In his
book, The Compulsory Acquisition of Land in New Zealand,
Peter Salmon supported the proposition that s 60(1)(c) requires
physical damage to or interference with the land itself. In addressing
the
third class of loss entitling an owner to compensation under s 60(2), he
referred to Superior Lands and Strongman Electric Supply as
authoritative statements of the law, applicable under the 1981
Act:[81]
[16.2]
Compensation for damage to land is available only if caused by a physical
interference with some right public or private which the owners of property
are lawfully entitled to make use of in connection with such property.
The
argument that arose under previous legislation as to whether the
New Zealand section contemplated that compensation might be
awarded for
personal wrongs can no longer be sustained because the wording of s 60
clearly relates the damage to the land.
- [93] The
reference in that passage to the possibility that compensation might be awarded
for personal wrongs under the previous legislation
reflected observations about
s 42 of the 1928 Act in Strongman Electric Supply, which noted
the drafting of the 1928 Act and its predecessors left room for the
possible award of compensation for personal
wrongs.[82] However, the Court
noted that possibility had been rejected and the rule limiting compensable
damage to physical interference with
an owner’s right in respect of
property, as opposed to personal injury, consistently
applied.[83]
- [94] In the
above extract, Salmon was clearly intending to contrast the drafting of
s 60(1) of the 1981 Act with s 42(1) of the 1928
Act. The marginal
note to s 42 of the 1928 Act stated “[a]ll persons suffering damage
entitled to compensation”. Subsection
(1)
provided:
42. (1) Every person having any estate or interest in any
lands taken under this Act for any public works, or injuriously affected
thereby, or suffering any damage from the exercise of any of the powers hereby
given, shall be entitled to full compensation for
the same from the Minister or
local authority...
In contrast, the placement of the word “land” in the chapeau of
s 60(1) of the 1981 Act clearly constrains damage for
the purposes of subs
(1)(c) to that suffered by the land.
- [95] We consider
that there was no such damage in the present case. This is not, as Mr Hodder
contended in reliance on the observations
of Woodhouse P and Roper J in
Drower, to “whittle... down” the right to full
compensation,[84] or to deny Casata
the complete equivalent of that which has been taken away from it. The right to
full compensation must fall within
the parameters of the statutory entitlement.
- [96] Mr Hodder
sought to rely on this Court’s decision in Cockburn to suggest a
different approach may be
appropriate.[85] In
Cockburn, the issue was whether a landowner
was entitled to compensation for a depreciation in the value of land due to the
loss of developmental
potential between the date of notice taking the land and
the later withdrawal of that notice. The landowner would have subdivided
and
sold his land but for the fact that the Minister invoked rights of acquisition
under the 1928 Act and later decided not to proceed
with acquisition —
however, a proposed change to the relevant district scheme meant that the land
could no longer be subdivided.
- [97] The
Minister had exercised express statutory powers in giving a notice of intention
to take the land, confirming that intention,
and eventually withdrawing the
notice.[86] Richardson J framed the
relevant question as being whether any proved depreciation in the value of the
land resulting from the exercise
of one or more of those powers was
compensable:[87]
...
[I]n short whether in those circumstances in the words of s 42 the
appellant is a person having an estate or interest in any lands
suffering any
damage from that exercise of those powers. That question cannot be determined
in a vacuum. It must be considered
in its statutory context and, materially for
present purposes, in relation to the powers conferred on the taking authority to
change
its mind and extricate itself from an acquisition of land which it had
set in train.
- [98] Richardson
and McMullin JJ held that the diminution in the value of the land resulting from
the loss of subdivisional potential
was damage for which the Minister was
obliged to pay compensation under
s 42.[88] It is clear that the
exercise of the Minister’s statutory power to end the process without
completing the acquisition of the
land was seen as justifying a different
approach to compensation than that taken in Superior Lands; that
case and others applying the rule that there must be physical
interference with the land were distinguished without any suggestion that they
were
wrong.[89] As Richardson J
said:[90]
The... rule is
not immutable. It must yield to the statutory context in the same way as this
Court in the Strongman case held that its application was excluded under
the provisions of the Electric Power Boards Act 1925. Those cases where a
public
authority has commenced to take land and then abandoned the exercise or
has taken land and later withdrawn from the taking are ...
in a class of their
own and are part and parcel of the land acquisition regime. For reasons earlier
discussed I consider it implicit
in the scheme of the legislation that the
corollary to the statutory right of the public authority to disengage itself
retrospectively
from the taking of land on which it has embarked is its
obligation to pay compensation for damage in respect of the diminution in
the
value of the land concerned sustained by the owner of the land which is
occasioned by its interference with his rights in relation
to the land.
- [99] While Mr
Hodder emphasised the statement that the rule requiring physical interference
was not immutable, we consider the circumstances
of this case are very different
from those discussed in Cockburn. And while the majority applied
s 42 of the 1928 Act, that was on the basis that the exercise of the
Minister’s powers had
prevented the owner from utilising its subdivision
potential and had caused a diminution in the value of the land. This was seen
as falling within the right to compensation for damage from the exercise of the
Minister’s statutory powers in circumstances
where the land was not
acquired and no other compensation would be
payable.[91] In the present case,
the land has in fact been acquired and any reduction in value caused by the
exercise of the relevant statutory
powers should not have affected the
assessment of compensation.[92]
- [100] We note
that in Luoni v Minister of Works and Development, this Court
followed Superior Lands, confirming that the damage referred to in
s 42(1) of the 1928 Act was confined to damage resulting from
physical interference.[93] In that
case, the Court held that Cockburn could not be relied on to support the
claimant having a right to compensation under the 1981
Act.[94]
- [101] Mr Hodder
also sought to rely on Shun Fung, specifically on the “principle of
equivalence”.[95] However, as
noted above, Shun Fung can be distinguished on the basis of the wording
of the entitling provision — s 10(1) of the Ordinance
(reproduced above at [89]) provided
for claims made on the basis of “loss or damage suffered by the
claimant due to the resumption of land”.
- [102] This
brings us to a further and related difficulty with the argument advanced by
Casata. Even if Casata’s basic proposition,
that the announcement of the
Project damaged the land by impairing Casata’s property rights, is
regarded as sound, it is difficult
to see how the damage could be compensable
other than in relation to the value of the land. The land has not been damaged
physically,
so the effect of the Project’s announcement must be an
economic one. But it would still have to be brought within the right
to
compensation set out in s 60(1)(c). Section 62(1) clearly provides that
the assessment of compensation must not be affected where
the value of the land
taken for any public work has been reduced by the prospect of the
work.[96]
- [103] Applied to
the circumstances of cases such as the present, this means that adverse effects
on land value caused by the announcement
of a Project must be set to one side
for the purposes of valuing the land to be acquired. Importantly, the section
demonstrates
legislative acceptance of the fact that shadow effects will arise,
and requires them not to be brought to account in the valuation
exercise. This
is, of course, to the benefit of the party whose land is to be taken. But this
limited recognition of the shadow
effect gives no basis for postulating a more
expansive right to compensation than is to be inferred from the plain meaning of
the
statutory provisions establishing entitlements to compensation. Indeed, we
think the reverse is true. Reading s 60(1)(c) together
with
s 62(1)(c) leads to the conclusion that economic effects of the shadow are
those that relate to the value of the land. The
potential of the land for
development remains as it was before the announcement, and must reflect what the
notional willing buyer
would pay for the land if sold on the open market, in
accordance with the rule in s 62(1)(b). Development potential is a
recognised
component of the value of
land.[97]
- [104] These
considerations bring into focus the difficulty that Casata has faced in the LVT
and in the High Court of quantifying the
loss that it claims was caused by the
shadow. If the loss did not relate to land value, it is necessary to postulate
some sort of
business loss that was in fact sustained and demonstrate that by
reference to something concrete. Neither the LVT nor the High Court
were
persuaded that had been done.[98]
This Court, on an appeal under s 18A of the Land Valuation Proceedings Act,
would be slow to reach a different conclusion on what
is essentially a question
of fact unless error of law was demonstrated in arriving at the factual
conclusion.
- [105] If what
was lost after announcement of the Project was simply the opportunity to develop
the land, or sell it and reinvest,
we do not understand why these opportunities
would not be reflected in the value of the land, preserved by the effect of
s 62(1)(c).
- [106] For all
these reasons, we are satisfied that Casata’s claim based on
s 60(1)(c) of the Act was rightly rejected by the
LVT and the High
Court.
Section 66
- [107] Casata
advances an alternative claim for compensation based on s 66 of the Act.
Section 66 is set out
above.[99]
- [108] We have
already summarised the High Court’s reasons for rejecting Casata’s
argument.[100] On appeal, Casata
repeats its argument that it has a valid claim for disturbance based on the
shadow effect of the use of the compulsory
acquisition powers in the Act
preventing it utilising the capital invested in the land. It relies on
Shun Fung, noting that a “disturbance loss” was held to
be recoverable subject to causal connection, remoteness and
reasonableness.[101]
- [109] Counsel
submitted that the Judge had wrongly characterised its claim as
“intertwined with the value of the
land”.[102] Rather, the
claim was for disturbance to the utilisation of its property rights, the loss of
business opportunity, and not for loss
of land value. Section 66 should be
liberally and purposively interpreted to give effect to the Act’s core
purpose of fully
and fairly compensating a landowner whose rights are disturbed
by the compulsory acquisition procedures. Shun Fung’s approach to
“disturbance loss” is settled and applicable.
- [110] As this
Court explained in Ace Developments, decided before the enactment of
s 66, disturbance payments were often included in compensation paid in
cases where businesses had
been required to move as a result of land being
taken.[103] Section 66 of the Act
was the first specific statutory expression of that element of compensation.
However, it was clear from the
legislative history of the Act that this section
was intended to state the existing law and provide clarity by giving examples of
available disturbance
payments.[104] Writing for the
Court, French J observed that market value is the primary compensation that
landowners are paid for the loss of
their
land.[105] She
continued:[106]
The
concept of market value deems land to be fungible, any special attributes for a
given use being already built into the market
value. The underlying premise is
that having received the market value of the land, the landowner can use that
money to buy equivalent
land somewhere else if they wish.
- [111] For
reasons we have already addressed in dealing with Casata’s claim for
compensation under s 60(1)(c), we consider the
loss alleged to be caused by
the shadow essentially goes to value. As such, we do not consider it can fall
within s 66, and we do
not consider that the claim advanced is one for
disturbance to land.
- [112] The
kinds of disturbance payments which are set out in s 66(1) reinforce us in
that view. It is clear that Casata’s claim
is not a claim for reasonable
costs incurred in moving from the land
taken,[107] and nor does it relate
to improvements not readily removeable from the
land.[108]
- [113] Casata’s
reliance on Shun Fung in this context is misplaced. The provision in the
Ordinance under which the claim was made was drafted to preserve the express
entitlement to compensation for damage to a
business.[109] As stated above,
s 68 of the 1981 Act makes direct provision for business losses, which
are distinct from disturbance
costs.[110]
- [114] We are
satisfied that the claim Casata advances cannot be brought within s 66.
This argument too must be rejected.
Result
- [115] The
appeal is dismissed.
- [116] The
appellant must pay the respondent costs for a complex appeal on a band A basis
together with usual disbursements. We do
not award costs in respect of second
counsel.
Solicitors:
Bell Gully, Wellington for
Appellant
Crown Law Office | Te Tari Ture o te Karauna, Wellington for
Respondent
[1] Casata Ltd v The Minister
for Land Information [2020] NZLVT 18 [LVT decision].
[2] At [57]–[61].
[3] Casata Ltd v Minister for
Land Information [2022] NZHC 243 [High Court judgment].
[4] At [106]–[108].
[5] At [108].
[6] At [123].
[7] Casata Ltd v Minister for
Land Information [2022] NZHC 1198 [High Court leave judgment].
[8] At [11].
[9] At [12].
[10] At [13].
[11] At [14].
[12] At [20].
[13] At [20].
[14] Land Valuation Proceedings
Act 1948, s 18A(3).
[15] The basis of this
calculation was not made clear to us.
[16] High Court judgment, above
n 3, at [11].
[17] Under s 18(1) of the
Public Works Act 1981, where any land is required for a public work the Minister
must, before proceeding to
take the land under the Act, serve notice of their
desire to take the land on every person with a registered interest in it. This
section, and others in the Act, refer to the Minister of Lands, but the relevant
powers are with the Minister for Land Information:
see Dromgool v Poulton
[2022] NZSC 157 at [17], n 16.
[18] We refer to the sums
claimed in submissions to this Court.
[19] LVT decision, above n 1, at [45].
[20] At [57].
[21] At [57].
[22] At [58].
[23] At [59].
[24] At [60].
[25] At [61].
[26] At [62].
[27] At [64].
[28] High Court judgment, above
n 3, at [52], [58] and [64].
[29] At [58]–[60].
[30] At [61]–[63].
[31] At [64].
[32] At [73], [79] and
[82]–[84].
[33] At [106].
[34] At [107].
[35] At [107].
[36] At [108], citing
Director of Buildings and Lands v Shun Fung Ironworks Ltd [1995] 2 AC 111
(PC); Cockburn v Minister of Works and
Development [1984] 2 NZLR 466 (CA); Pattle v The Secretary of State for
Transport [2009] UKUT 141 (LC); and Hamilton v Minister of Lands LVT
Auckland LVP 019/10, 28 June2012.
[37] At [108].
[38] At [111], citing Ace
Developments Ltd v Attorney-General [2017] NZCA 409, [2017] 3 NZLR 728 at
[48].
[39] At [111].
[40] At [117].
[41] See, for example,
Fitzgerald v R [2021] NZSC 131, [2021] 1 NZLR 551 at [51], n 72 per
Winkelmann CJ and [209] per O’Regan and Arnold JJ.
[42] Public Works Act, s
60(1)(c).
[43] Drower v Minister of
Works and Development [1984] 1 NZLR 26 (CA) at 29 per Woodhouse P and Roper
J.
[44] Ace Developments Ltd v
Attorney-General, above n 38, at
[65] (footnote omitted).
[45] Shun Fung Ironworks Ltd,
above n 36, at 125.
[46] Shun Fung Ironworks Ltd,
above n 36, at 125.
[47] Cockburn,
above n 36, at 471 per Richardson
J.
[48] Public Works Act, s 2
definition of “land”.
[49] Shun Fung Ironworks
Ltd, above n 36, at 126 and
137–138.
[50] Emphasis added.
[51] Public Works Act, s
60(1)(c)(i).
[52] Section 60(1)(c)(i).
[53] Peter Salmon The
Compulsory Acquisition of Land in New Zealand (Butterworths, Wellington,
1982) at [16.3]. Salmon also listed ss 126 and 141, but we note those have
since been repealed by s 116(1)
of the Government Roading Powers Act 1989.
[54] Shun Fung Ironworks
Ltd, above n 36.
[55] At 137–139.
[56] Crown Lands Resumption
Ordinance (Cap 124) (HK) [the Ordinance].
- [57] At
124–125, citing the Ordinance, Acquisition of Land (Assessment of
Compensation) Act 1919 (UK), Land Compensation Act 1961
(UK), and Compulsory
Purchase Act 1965
(UK).
[58] Shun Fung
Ironworks Ltd, above n 36, at
125.
[59] At 125.
[60] At 135.
[61] At 135.
[62] At 138.
[63] At 138.
[64] At 137–139.
[65] Emphasis added.
[66] Public Works Act, s
68(1).
[67] Public Works Act, s 62;
Salmon, above n 53, at [13.4]; and
Kenneth Palmer “Compulsory Acquisition and Compensation” in
Elizabeth Toomey (ed) New Zealand Land Law (3rd ed, Thomson Reuters,
Wellington, 2017) [15] at [15.6.03], citing Cedars Rapids Manufacturing and
Power Co v Lacote [1914] UKLawRpAC 4; [1914] AC 569 (PC) at 576 per Lord Dunedin; Birmingham
Corp v West Midland Baptist (Trust) Assoc (Inc) [1970] AC 874 (HL) at
893 per Lord Reid; and Gajapatiraju v The Revenue Divisional Officer,
Vizagapatam [1939] UKPC 15; [1939] AC 302 (PC) at 313.
[68] Public Works Act, s 2
definition of “land”.
[69] Eckhold v Department of
Lands [1991] NZAR 202 (LVT) at 206.
[70] At 203.
[71] See Public Works Act, s
62(1), discussed below.
[72] Superior Lands Ltd v
Wellington City Corp [1974] 2 NZLR 251 (CA) [Superior Lands
(CA)].
[73] Superior Lands Ltd v
Wellington City Corp [1974] 1 NZLR 240 (SC).
[74] Emphasis omitted.
[75] Superior Lands (CA),
above n 72, at 257, citing
Strongman Electric Supply Co Ltd v Thames Valley Electric Power Board
[1964] NZLR 592 (CA); and Wood v Taranaki Electric-Power Board [1927] NZGazLawRp 30; [1927]
NZLR 392 (SC).
[76] Superior Lands (CA),
above n 72, at 257, citing
Halsbury’s Laws of England (3rd ed, 1955) vol 10 Compulsory
Acquisition at 156–158; and Strongman Electric Supply
Co Ltd, above n 75, at
600 (emphasis added).
[77] Strongman Electric
Supply Co Ltd, above n 75, at
600–601.
[78] Argyle Motors
(Birkenhead) Ltd v Birkenhead Corp [1975] AC 99 (HL) at 129 (emphasis
added).
[79] Although the decision in
Superior Lands (CA), above n 81, was concerned with s 166 of
the Town and Country Planning Act 1977, Richmond J observed that the language of
that provision was substantially
the same as the equivalent provision (s 42) of
the Public Works Act 1928. Similarly, the decision in Strongman Electric
Supply Co Ltd, above n 75, was
concerned with s 94 of the Electric Power Boards Act 1925, the terms of which
are almost identical to s 42 of the Public Works Act 1928.
[80] Strongman Electric
Supply Co Ltd, above n 75, at 600;
and Superior Lands (CA), above n 72, at 257.
[81] Salmon, above n 53, citing Superior Lands (CA),
above n 72; and Strongman Electric
Supply Co Ltd, above n 75, at 258
(footnotes omitted and emphasis added).
[82] Strongman Electric
Supply Co Ltd, above n 75, at
601.
[83] At 602, citing Wood v
Taranaki Electric-Power Board [1927] NZGazLawRp 30; [1927] NZLR 392 (SC) at 405; and Tawa
Central Ltd v Minister of Public Works [1934] NZGazLawRp 132; [1934] NZLR 841 (SC) at 860 per Reed
J.
[84] Drower v Minister of
Works and Development [1984] 1 NZLR 26 (CA), at 29 per Woodhouse P and Roper
J.
[85] Cockburn,
above n 36.
[86] At 474 per McMullin J.
[87] At 468 per Richardson
J.
[88] At 472 per Richardson J and
477 per McMullin J. Greig J delivered a dissenting judgment.
[89] At 471–472 per
Richardson J and 476–477 per McMullin J.
[90] At 472 per Richardson
J.
[91] At 470 per Richardson J and
477 per McMullin J.
[92] Public Works Act, s
62(1)(c).
[93] Luoni v Minister of
Works and Development [1989] 1 NZLR 62 (CA) at 64.
[94] At 64–65, citing
Cockburn, above n 36.
[95] Shun Fung, above n
36, at 125.
[96] Public Works Act, s
62(1)(c). Under s 62(1)(c) increases in value due to the prospect of the
public work are also not to be taken into account.
[97] Re Whareroa 2E Block,
Maori Trustee v Ministry of Works [1959] NZLR 7 (PC) at 10 and 13–14,
applied in Wellington City Corp v Berger Paints NZ Ltd
[1975] 1 NZLR 184 (CA).
[98] LVT decision, above n 1, at [58]–[64]; and High Court
judgment, above n 3, at
[106]–[108].
[99] Above at [66].
[100] Above at [59]–[54].
[101] Shun Fung, above
n 36, at 125–126.
[102] High Court judgment,
above n 3, at [111].
[103] Ace Developments
Ltd, above n 38, at [33], citing
Berger Paints NZ Ltd v Wellington City Corp [1973] 2 NZLR 739 (SC).
[104] At [68], citing New
Zealand Public Works Act Review Committee Report of the Public Works Act
Review Committee (Ministry of Works and Development, Wellington, 1977) at 5.
As the case notes, this report was recognised in the parliamentary debate
as
being the basis of the legislation: (12 December 1980) 436 NZPD 5921. See also
Salmon, above n 53, at
[14.2]–[14.3].
[105] At [71].
[106] At [71].
[107] Public Works Act, s
66(1)(a)(ii).
[108] Section 66(1)(b).
[109] Shun Fung, above
n 36, at 124.
[110] Public Works Act, s 68.