(1) Section 162(3) and (4)--
renumber as section 162(4) and (5).
(2) Section 162--
insert--
'(3) However, an EIS must not be required for the application if--
(a) it is for an environmental authority (mining lease); and
(b) a relevant mining lease is, or is included in, a significant project.6'.
(3) Section 162(5), as renumbered, definition required period, paragraph (b), 'EPA Minister'--
omit, insert--
'administering authority'.