Tasmanian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

BUILDING REGULATIONS 2014 (S.R. 2014, NO. 57) - REG 31

Requirements during building demolition or removal
A person must not demolish or remove a building unless –
(a) the demolition or removal is carried out –
(i) in accordance with a permit granted under these regulations; and
(ii) in a safe and professional manner; and
(b) the demolition of any wall which abuts on a public street is carried out only during the hours permitted by the permit authority; and
(c) the person takes reasonable action to prevent building material and debris falling onto or into –
(i) a place which is open to the public; and
(ii) any adjacent land or way; and
(d) the positions of capped sewer and stormwater drains and sealed-off water supply lines are clearly marked at the site; and
(e) the person leaves the site of the demolition or removal clean and tidy; and
(f) the person removes all broken glass or other dangerous or hazardous building material from the site.
Penalty:  Fine not exceeding 20 penalty units.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback