- (S.R. 2014, NO. 62) TABLE OF PROVISIONS Long Title PART 1 - Preliminary 1. Short title 2. Commencement 3. Interpretation 4. Meaning of commissioned PART 2 - Technical and Safety Requirements 5. General requirements for safe operation standards 6. Adoption of standards 7. Information and training 8. Provision of training 9. Gas quality 10. Measurement of gas quality 11. Operating pressure and heating value of gas 12. Requirements as to change in gas 13. Testing of gas for heating value, pressure, &c. 14. Odour of gas PART 3 - Design and Construction of Facilities 15. Design of facilities 16. Construction safety management plan PART 4 - Safety and Operating Plans 17. Plan to include details of manager of facility 18. Person responsible for safety and operating plan 19. Description of facility 20. Formal safety assessment 21. Address where records kept 22. Schedule of reports 23. Availability of safety and operating plans 24. Initial audits of safety and operating plans 25. Periodical audits of safety and operating plans 26. Safety system records PART 5 - Content of Safety Management System 27. Minimum requirements of safety management system 28. Safety policy 29. Organisational structure and responsibilities 30. Published technical standards 31. Design, construction, installation, operation, maintenance and modification 32. Control systems 33. Machinery and equipment 34. Permit-to-work system 35. Emergency preparedness 36. Emergency communication systems 37. Internal monitoring, auditing and reviewing 38. Key performance indicators 39. Gas incident recording, investigation and reviewing 40. Training and qualification PART 6 - Reporting of Incidents 41. Mandatory reporting of incidents 42. Reporting of incidents PART 7 - Gas Installations and Gas-Fitting Work 43. Standard gas installations 44. Standard gas installation maximum gas consumption and piping length 45. Prescribed class of standard gas installation 46. Application for acceptance of gas installation 47. Statement of compliance for gas-fitting work 48. Connection of gas to installation 49. Owner of Type B appliance to keep records 50. Certificate of compliance for gas-fitting work 51. Installation of Type A appliances 52. Requirements for Type A compliance plates 53. Compliance plates for Type B appliances 54. Work on gas installations 55. General responsibilities of person carrying out gas-fitting work 56. Commissioning gas-fitting work 57. Reporting of gas installation or gas storage system incidents 58. Dangerous gas installations 59. Clearance of consumer piping 60. Gas pressure-raising devices in consumer piping 61. Notice of proposal to carry out certain gas-fitting work 62. Hot-tapping work 63. Special requirements for high-pressure consumer piping 64. Notice of defect 65. Notice of rectification 66. Appeal against notice of defect PART 8 - Automotive Gas-Fitting Work 67. Interpretation 68. Installation of automotive gas fuel system 69. Service and repair of automotive gas fuel system 70. Sale of vehicle and industrial equipment with automotive gas fuel system 71. Automotive gas containers PART 9 - Miscellaneous 72. Emergency work on public land 73. Information on location of gas infrastructure 74. Sale of caravan with LPG systems 75. Gas-fitting work on vessel 76. Interstate compliance plates SCHEDULE 1[ Note: This table has been automatically generated and may be incomplete. ]