(1) In this part:
"bushfire emergency"––see section 372.
"height", for a building or structure, means the reduced level of the building's or structure's highest point.
"fire-caused rebuilding development"—see section 373.
"previously approved"—see section 374.
(2) In this section:
"reduced level"—see the territory plan, volume 2, part 3 (Definitions).