(1) A petroleum titleholder or greenhouse gas titleholder commits an offence if:
(a) the titleholder undertakes a geophysical or geological survey in the title area; and
(b) the titleholder does not notify the Titles Administrator, at least 48 hours before the proposed start of the survey, of the following:
(i) the proposed date and time that the survey will start;
(ii) the duration of the survey;
(iii) the survey area coordinates;
(iv) in the case of a seismic survey--the length of the streamers to be towed by the survey vessel.
(2) Subregulation (1) is an offence of strict liability.
Note: For strict liability , see section 6.1 of the Criminal Code .