PORTS ASSETS (AUTHORISED TRANSACTIONS) ACT 2012 - SECT 32
No cargo throughput limits for Port Botany
(1) A planning control is of no effect to the extent that it would operate to
impose a cargo throughput limit for Port Botany.
(2) A
"cargo throughput limit" for Port Botany is any direct or indirect limit or
other restriction on the amount of cargo that can be received or handled at or
transported from Port Botany and includes (without limitation) the following--
(a) a limit or other restriction on the number of cargo containers that can be
received or handled at or transported from Port Botany,
(b) a limit or other
restriction on the nature, number or frequency of transport movements to or
from Port Botany,
(c) a limit of the kind imposed by condition A1.4 (Port
Throughput Capacity Limits) of the planning approval for the construction and
operation of a new container terminal and associated infrastructure at
Port Botany as granted on 13 October 2005.
(3) The following provisions apply
to the operation of this section-- (a) this section does not apply to a
planning control until the planning control has been imposed, so that it
limits the effect of the planning control once imposed but does not prevent
the planning control from being imposed,
(b) this section does not invalidate
a planning control or any planning approval that imposes a planning control,
(c) this section does not prevent planning approval being granted merely
because a planning control to be imposed by the planning approval will be
rendered wholly or partially ineffective by this section.
(4) In this
section--
"Planning Act" means the Environmental Planning and Assessment Act 1979 and
the regulations under that Act.
"planning approval" means a consent, approval, permission or other authority
under the Planning Act and includes any condition of or the terms of any such
consent, approval, permission or other authority.
"planning control" means any requirement or other control imposed (before or
after the commencement of this section) by or under-- (a) the Planning Act, or
(b) an environmental planning instrument under the Planning Act, or
(c) a
planning approval.
"Port Botany" means land in the local government areas of the City of Botany
Bay and the City of Randwick (including land covered by water) leased to the
private sector for the purposes of an authorised transaction.