PROTECTION OF THE ENVIRONMENT OPERATIONS (CLEAN AIR) REGULATION 2021 - SCHEDULE 7

SCHEDULE 7 – Test methods, averaging periods and reference conditions for non-scheduled premises

clause 46

Part 1 - Test methods

Test methods and monitoring methods
Air impurity Test method Monitoring method
Solid particles (Total) TM-15 Not applicable
Smoke, if determining whether a specified standard of concentration of opacity has been exceeded Not applicable CEM-1
Smoke, if determining whether a specified Ringelmann standard has been exceeded TM-16 Not applicable

Part 2 - Averaging periods

Averaging periods
Air impurity Averaging period
Solid particles (Total) 1 hour, or the minimum sampling period specified in the relevant test method referred to in Part 1, whichever is the greater
Smoke, if determining whether a specified standard of concentration of opacity has been exceeded 6 minutes rolling

Part 3 - Reference conditions

Reference conditions relating to Group A
Air impurity Activity or plant Reference conditions
Solid particles (Total) Any activity or plant, except as listed below Dry, 273 K, 101.3 kPa
Boilers or incinerators Dry, 273 K, 101.3 kPa, 12% CO 2
Smoke, if determining whether a specified standard of concentration of opacity has been exceeded Any activity or plant Gas stream temperature above dew point. Path length corrected to stack exit diameter as per CEM-1.

Reference conditions relating to Group B or C
Air impurity Activity or plant Reference conditions
Solid particles (Total) Any activity or plant, except as listed below Dry, 273 K, 101.3 kPa
Fuel burning equipment using solid fuel Dry, 273 K, 101.3 kPa, 7% O 2
Fuel burning equipment using liquid or gaseous fuel Dry, 273 K, 101.3 kPa, 3% O 2
Smoke, if determining whether a specified standard of concentration of opacity has been exceeded Any activity or plant Gas stream temperature above dew point. Path length corrected to stack exit diameter as per CEM-1.