Queensland Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Previous]
[Next]
[Download]
[Help]
WATER PLAN (BAFFLE CREEK BASIN) 2010 - REG 31
Pass flow conditions for taking unallocated water
(1) Water licences to take water from a watercourse granted from the strategic
or general reserve must include a pass flow condition.
(2) In deciding the
pass flow condition, the chief executive must consider— (a) existing
downstream entitlement holders; and
(b) the daily volumetric limit to be
stated on the licence.
(3) The pass flow condition must be at least— (a)
for the Baffle Creek catchment area, the greater of the following— (i) the
flow, expressed in megalitres a day, worked out by multiplying the catchment
area upstream of the proposed point of take, expressed in square kilometres,
by 0.3561;
(ii) 86.4ML a day; or
(b) for the Littabella Creek catchment
area, the greater of the following— (i) the flow, expressed in megalitres a
day, worked out by multiplying the catchment area upstream of the proposed
point of take, expressed in square kilometres, by 1;
(ii) 43ML a day; or
(c)
for the Broadwater Creek, Eurimbula Creek or Worthington Creek catchment
area—86.4ML a day.
(4) This section does not apply to a water licence to
take water from an impoundment.
(5) In this section—
"pass flow condition" means a condition on a water licence to take water that
states the rate of flow in a watercourse that must, while water is being taken
under the licence, be passing immediately downstream of the point on the
watercourse at which water is taken under the licence.
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback