ELECTRICITY (GENERAL) REGULATIONS 2012 - REG 55E

55E—Export limits for electricity generating plant

        (1)         This regulation applies to a designated electricity generating plant that is, or is to be, connected to a relevant distribution network and that—

            (a)         is installed on or after the relevant day; or

            (b)         was installed before the relevant day if a declared component of electricity infrastructure or an electrical installation associated with the plant is replaced on or after that day.

        (2)         The owner or operator of a designated electricity generating plant to which this regulation applies must ensure that the following requirements are complied with in relation to the plant:

            (a)         the plant's inverter is remote communications capable;

            (b)         on or after the prescribed day

                  (i)         the plant is capable of being export limited; and

                  (ii)         the export limits of the plant are capable of being updated remotely.

        (3)         A designated electricity generating plant to which this regulation applies must not be connected to a relevant distribution network unless the requirements under subregulation (2) are complied with in relation to the plant.

        (4)         The Technical Regulator must prepare and publish guidelines that set out the requirements for ensuring that an inverter is "remote communications capable .

        (5)         The Technical Regulator may prepare and publish guidelines that set out methods for ensuring that—

            (a)         a designated electricity generating plant is capable of being export limited ("export limiting methods"); and

            (b)         the export limits of a designated electricity generating plant are capable of being updated remotely (without a person being required to attend the site of the designated electricity generating plant) ("remote updating methods ).

        (6)         Guidelines published under subregulation (5) may indicate that a method is, or is not, appropriate for designated electricity generating plant with particular nameplate capacity.

        (7)         For the purposes of this regulation—

            (a)         a designated electricity generating plant (generally) is "capable of being export limited if the electricity exported to a relevant distribution network from the plant can be programmed to not exceed thresholds ("export limits"), which may vary at different times of the day; and

            (b)         a particular designated electricity generating plant ("installed plant") will be taken to be " capable of being export limited" if the installed plant complies with an export limiting method that is appropriate for designated electricity generating plant with nameplate capacity of the installed plant set out in guidelines published under subregulation (5); and

            (c)         the export limits of a designated electricity generating plant ("installed plant") will be taken to be "capable of being updated remotely if the installed plant complies with a remote updating method that is appropriate for designated electricity generating plant with nameplate capacity of the installed plant set out in guidelines published under subregulation (5).

        (8)         The Technical Regulator must maintain an up to date list of "declared components" for the purposes of subregulation (1)(b) on a website determined by the Technical Regulator.

        (9)         The Minister may—

            (a)         by notice in the Gazette, designate an electricity generating plant as a "designated electricity generating plant" for the purposes of this regulation; and

            (b)         by subsequent notice in the Gazette, vary or revoke a notice under this subregulation.

        (10)         The Technical Regulator may—

            (a)         by notice in the Gazette, declare that a distribution network is an "excluded distribution network" for the purposes of this regulation; and

            (b)         by subsequent notice in the Gazette, vary or revoke a notice under this subregulation.

        (11)         In this regulation—

"declared component"—see subregulation (8);

"designated electricity generating plant"—see subregulation (9);

"excluded distribution network"—see subregulation (10);

"prescribed day" means a day specified by the Minister by notice in the Gazette for the purposes of subregulation (2)(b);

"relevant day", in relation to a designated electricity generating plant, means—

            (a)         the day on which these regulations come into operation; or

            (b)         in the case of an electricity generating plant that is designated as a designated electricity generating plant after the day referred to in paragraph (a)—the day on which the electricity generating plant is so designated;

"relevant distribution network" means a distribution network other than an excluded distribution network.