(1) In this
Chapter—
"structure" has the same meaning as it has in the Act.
Examples—
A roadway or pathway.
A ship or submarine.
Foundations, earth retention works
and other earthworks, including river works and sea defence works.
Formwork,
falsework or any other structure designed or used to provide support, access
or containment during construction work.
An airfield.
A dock, harbour,
channel, bridge, viaduct, lagoon or dam.
A sewer or sewerage or drainage
works.
(2) This Chapter does
not apply to plant unless—
(a) the
plant is—
(i)
a ship or submarine; or
(ii)
a pipe or pipeline; or
(iii)
an underground tank; or
(iv)
designed or used to provide support, access or
containment during work in connection with construction work; or
(b) work
on the plant relates to work that is carried out in connection with
construction work; or
(c) the
plant is fixed plant on which outage work or overhaul work that involves or
may involve work being carried out by 5 or more persons conducting businesses
or undertakings at any point in time.
Note—
This Chapter does not apply to the manufacture of plant (see
paragraph (a) of the definition of "construction work" in
regulation 289(3)).