548—Notification by new operator
(a) in
relation to a determined major hazard facility that is proposed to be operated
by a new operator;
(b)
whether or not a determination under regulation 543 was made in relation
to the current operator.
(2) A proposed new
operator of the determined major hazard facility must give the regulator a
notification that contains the information specified in regulation 538(3)
in relation to the proposed new operator.
Maximum penalty:
(a) In
the case of an individual—$3 600.
(b) In
the case of a body corporate—$18 000.
(3) The provisions of
this Part apply, to the extent that they relate to the suitability of an
operator, as if the notification under subregulation (2) were a
notification under regulation 536.