Tasmanian Numbered Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

ENVIRONMENTAL MANAGEMENT AND POLLUTION CONTROL (UNDERGROUND PETROLEUM STORAGE SYSTEMS) REGULATIONS 2020 (S.R. 2020, NO. 4) - REG 25

Installation of groundwater-monitoring wells for new storage systems in existing groundwater protection zones
(1)  This regulation applies to a storage system if part or all of the storage system is installed in a groundwater protection zone after the groundwater protection zone is declared under regulation 5 .
(2)  An infrastructure owner of a storage system to which this regulation applies must ensure that, before the storage system is allowed to be in use for the first time –
(a) a sufficient number of suitably located groundwater-monitoring wells, as determined in accordance with regulation 23 , are installed in respect of the storage system; and
(b) the groundwater-monitoring wells referred to in paragraph (a) are, in addition to the requirements under regulation 19 , installed in accordance with any EPA guidelines issued in relation to the installation of groundwater-monitoring wells.
Penalty:  Fine not exceeding 100 penalty units.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback