(1) If a dispute arises between the Link corporation and a Utility as to the cost of relocation or rectification of Utility infrastructure, the Link corporation or the Utility may refer the matter to the Minister and the Utility Minister for determination under Subdivision 7.
S. 56V(2) amended by No. 49/2019 s. 186(Sch. 4 item 28.25).
(2) The person referring the matter for determination must notify the Head, Transport for Victoria of that referral.
S. 56W inserted by No. 81/2006 s. 72.