If the Service
Provider fails to submit revisions to an Access Arrangement as required by the
Access Arrangement, the Relevant Regulator may draft and approve its own
revisions to the Access Arrangement. Before approving its own revisions to an
Access Arrangement under this section 2.45 the Relevant Regulator must:
(a)
prepare an information package which, to the extent practicable, meets the
requirements of sections 2.6 and 2.7; and
(b)
follow the process set out in sections 2.31 to 2.37 to the extent practicable
as though the revisions to the Access Arrangement drafted by the Relevant
Regulator had been proposed by the Service Provider and the information
package drafted by the Relevant Regulator had been Access Arrangement
Information proposed by the Service Provider.