(1) This regulation
applies to plumbing and plumbing work that is the installation of a service
line or connection point for a lot on subdivided land if the proposed scheme
plan for the land shows that —
(a) the
land will be divided into 2 lots; and
(b) 1 of
the lots (the front lot ) is between the other lot (the rear lot ) and a
street outside the subdivided land; and
(c) the
proposed scheme plan shows the rear lot will only be connected to the street
outside the subdivided land by a driveway (the rear driveway ); and
(d) the
rear driveway is part of the rear lot or is common property.
(2) A responsible
person for the installation of the service line for the front lot or rear lot
on the subdivided land may install, or cause to be installed, the service line
for the lot anywhere on the part of the land the proposed scheme plan shows as
the rear driveway.
(3) A responsible
person for the installation of the connection point for the rear lot on the
subdivided land may install, or cause to be installed, the connection point
for the lot anywhere on the part of the land the proposed scheme plan shows as
the rear driveway.
[Regulation 58 inserted: SL 2020/132
r. 7.]