(1) This regulation
applies to plumbing and plumbing work that is the installation of a service
line for a lot on subdivided land if —
(a) the
subdivided land has an existing building on it that is connected to existing
service lines; and
(b) the
existing building will be on 1 of the lots (the existing building lot )
on the subdivided land; and
(c) the
existing service lines for the existing building will not be wholly within the
existing building lot.
(2) A responsible
person for the installation of the service line must ensure that the service
line for the existing building lot is installed in accordance with
regulations 57 and 58.
[Regulation 59 inserted: SL 2020/132
r. 7; amended: SL 2021/71 r. 10.]
[ 60‑65. Deleted: Gazette 24 Apr 2015
p. 1499.]
[Heading inserted: Gazette 28 Jun 2004
p. 2432.]
[Heading inserted: Gazette 28 Jun 2004
p. 2432.]