WORK HEALTH AND SAFETY ( GENERAL ) REGULATIONS 2022 - REG 306B

306B .         Regulator to be notified of proposed manufacture of concrete panel

        (1)         A person who, at a workplace (other than a construction site) where a concrete panel is proposed to be manufactured, is a person conducting a business or undertaking must ensure that the regulator is notified of the proposed work at least 10 working days before the panel is proposed to be cast.

        (2)         A person who, at a construction site where a concrete panel is proposed to be manufactured, is the principal contractor must ensure that the regulator is notified of the proposed work at least 10 working days before the panel is proposed to be cast.

        (3)         A notice under subregulation (1) or (2) must be made in the manner and form required by the regulator and must specify —

            (a)         the construction site or other workplace at which the proposed manufacturing work is to take place; and

            (b)         the construction site at which the panel is to be incorporated as a wall (including a retaining wall) once the process by which the panel is manufactured is complete.

        Penalty for this subregulation:

            (a)         for an individual, a fine of $7 000;

            (b)         for a body corporate, a fine of $35 000.

        (4)         A person referred to in subregulation (1) (other than the regulator) must ensure that a copy of the notice is given to the principal contractor at the construction site referred to in subregulation (3)(b) within the period referred to in subregulation (1).

        Penalty for this subregulation:

            (a)         for an individual, a fine of $1 450;

            (b)         for a body corporate, a fine of $7 000.