Australian Capital Territory Current Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
SCAFFOLDING AND LIFTS REGULATION 1950
- made under the Scaffolding and Lifts Act 1912
TABLE OF PROVISIONS
PART 1--PRELIMINARY
1. Name of regulation
2. Dictionary
3. Notes
4. Plates, figures and sketches
5.
6.
7.
PART 2--QUALIFICATIONS, POWERS AND DUTIES OF THE CHIEF INSPECTOR AND INSPECTORS
11.
13.
14.
PART 4--LIFTS
Division 4.1--Interpretation
16.
Division 4.2--Design, construction and erection of lifts
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
Division 4.3--Maintenance of lifts
67.
Division 4.4--Use of lifts
68.
69.
70.
71.
72.
PART 5--SAFEGUARDS AND MEASURES TO BE TAKEN FOR SECURING THE SAFETY AND HEALTH OF PERSONS ENGAGED IN BUILDING WORK
Division 5.1--General
73. (1) Any person who directly or by his or her servants or agents (including every
74.
75.
Division 5.2--Constructing, erecting, adding to, altering, repairing, finishing, painting and cleaning buildings and structures
77.
78.
79.
80.
81.
82.
83.
Division 5.3--Demolition of buildings and structures
84.
PART 6--THE PROPER DESIGN, CONSTRUCTION, ERECTION AND USE OF SCAFFOLDING
85. Definitions for pt 6
86.
87.
88.
89.
90.
91.
92.
93.
94.
PART 7--SAFEGUARDS AND MEASURES TO BE TAKEN FOR SECURING THE SAFETY AND HEALTH OF PERSONS ENGAGED IN EXCAVATION WORK
Division 7.1--General
95.
Division 7.2--Cofferdams and caissons
96.
Division 7.3--Trenches
97.
Division 7.4--Shafts, wells and tunnels
98.
PART 8--SAFEGUARDS AND MEASURES TO BE TAKEN FOR SECURING THE SAFETY AND HEALTH OF PERSONS ENGAGED IN COMPRESSED AIR WORK
Division 8.1--Diving
99.
Division 8.2--Tunnelling
100.
Division 8.3--Caissons
101.
PART 9A--EXPLOSIVE-POWERED TOOLS--SAFETY MEASURES
118A.
118B.
118C.
118D.
118E.
118F.
118G.
118H.
PART 10--MEASURES TO BE TAKEN FOR SECURING THE HEALTH OF PERSONS IN BUILDING WORK, EXCAVATION WORK AND COMPRESSED AIR WORK BY PROVISION OF FIRST-AID EQUIPMENT, SHELTER, CHANGE AND DINING ACCOMMODATION, SANITARY CONVENIENCES AND WASHING FACILITIES
Division 10.1--First-aid equipment
119.
Division 10.2--Shelter, change and dining accommodation
120.
Division 10.3--Sanitary conveniences and washing facilities
121.
PART 11--BASIC REQUIREMENTS ABOUT DESIGN AND CONSTRUCTION, ERECTION, USE, MAINTENANCE, INSPECTION AND TESTING WITH PARTICULAR REFERENCE TO CRANES, LIFTS, HOISTS, SCAFFOLDING AND PLANT
122.
123.
124.
125.
126.
127. D is the maximum pitch circle diameter of the spring, measured in
128.
129.
130.
131. V means the speed of meshing of the gear teeth measured at their
132.
132A.
133.
134.
135.
136.
137.
138.
139.
140.
PART 12--PLANT AND GEAR
141.
142.
143.
144.
145.
146.
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
PART 13--PRECAUTIONS AND MEASURES TO BE TAKEN FOR SECURING THE SAFETY OF PERSONS IN CONNECTION WITH ROOFS SHEATHED WITH ASBESTOS CEMENT OR OTHER BRITTLE MATERIAL
158.
PART 16--MISCELLANEOUS AND PENALTIES
164.
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 7
SCHEDULE 8
SCHEDULE 9
DICTIONARY
ENDNOTES
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback